Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 27, 2019 FBO #6364
SOLICITATION NOTICE

36 -- Cryogenic Service System (CSS) 2000 Gallon Nitrogen/Oxygen Tanks

Notice Date
4/25/2019
 
Notice Type
Synopsis
 
NAICS
332420 — Metal Tank (Heavy Gauge) Manufacturing
 
Contracting Office
Contracts Department Hwy. 547 Attn:B562-3C Lakehurst NJ 08733-5083
 
ZIP Code
08733-5083
 
Solicitation Number
N6833519R0001
 
Response Due
5/9/2019
 
Point of Contact
John C. Murtagh, Contract Specialist, Phone 7323235283, - David Andreoli, Contracting Officer, Phone 732-323-5208
 
E-Mail Address
john.c.murtagh@navy.mil, david.andreoli@navy.mil
 
Small Business Set-Aside
Total Small Business
 
Description
The Naval Air Warfare Center Aircraft Division Lakehurst, NJ (NAWCADLKE) has a requirement for the design, manufacture, assemble, test, delivery and support of up to approximately QTY 100 Cryogenic Service Systems (CSS), part number (P/N) 1678AS100-1/-2 under NAICS Code 332420, Metal Tank (Heavy Gauge) Manufacturing. NAWCADLKE intends to award one (1) firm fixed price (FFP), Indefinite Delivery/Indefinite Quantity (IDIQ) contract with a five (5) year ordering period through a competitive Small Business set aside. The Government expects to select one (1) Offeror on the basis of providing the "lowest price, technically acceptable" proposal. Request for information (RFI) regarding this Pre-Solicitation was posted under both N68335-17-RFI-0453 and N68335-17-RFI-0454. The CSS provides bulk storage of cryogenic fluids as well as a means of delivering oxygen/nitrogen in liquid and in high pressure gaseous form. The CSS assembly consists of a cryogenic storage tank with a nominal capacity of 2000 gallons. The storage tank is a vertical tank mounted on four legs. The tank assembly is comprised of a stainless steel inner storage tank surrounded by a carbon steel shell separated by an annular vacuum space. The lower structure is situated under the tank and consists of the following major components: converter assembly, cryogenic pump, electric vaporizer and various controls and indicators. The converter assembly, cryogenic pump, and electric vaporizer are mounted to a removable skid for ease of maintenance. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (25-APR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link To Document
(https://www.fbo.gov/spg/DON/NAVAIR/N68335/N6833519R0001/listing.html)
 
Record
SN05292591-F 20190427/190425230008 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.