Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 08, 2019 FBO #6375
MODIFICATION

C -- 657A4-19-350, Physical Security Assessment (VA-19-00054833)

Notice Date
5/6/2019
 
Notice Type
Modification
 
NAICS
541990 — All Other Professional, Scientific, and Technical Services
 
Contracting Office
Department of Veterans Affairs;Network Contracting Office (NCO) 15;3450 S 4th Street Trafficway;Leavenworth KS 66048
 
ZIP Code
66048
 
Solicitation Number
36C25519R0083
 
Response Due
6/13/2019
 
Archive Date
9/11/2019
 
Point of Contact
913-946-1142
 
Small Business Set-Aside
N/A
 
Description
Page 1 of 6 Synopsis: CONTRACT INFORMATION This A-E Services requirement is being procured in accordance with the Brooks Act (Public Law (PL0582) and implemented in accordance with the Federal Acquisition Regulation (FAR) Subpart 36. Firms will be selected based on demonstrated competence and qualifications for the required work. This procurement is restricted to Service Disabled Veteran Owned Small Business (SDVOSB) firms. This requirement is being procured in accordance with the VAAR 836.606-73 as implemented in FAR Subpart 36.6. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330 s from qualified contractors that meet the professional requirements. The selection criteria for this acquisition will be in accordance with FAR 36.602-1 and VAAR 836.602-1 and are listed below in descending order of importance. The completed SF 330 will be evaluated by the Poplar Bluff VA Health Care System Evaluation Board in accordance with FAR 36.602-5(a) and the selection report shall serve as the final selection list, which will be provided directly to the Contracting Officer. The Government will not pay nor reimburse any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. Award of any resultant contract is contingent upon the availability of funds. No solicitation document is available and no other information pertaining to project scope, etc. is available at this time. Any request for assistance with submission or other procedural matters shall be submitted via email only to Michael.Bottary@va.gov. Personal visits to discuss this announcement will not be allowed. The NAICS Codes for this procurement is 541990 All other professional, scientific and technical services and small business size standard of $7.5M. Award of a Firm Fixed Price contract is anticipated. Anticipated time for completion of design is approximately 270 calendar days including time for VA reviews. DATABASE REGISTRATION INFORMATION: VERIFICATION OF STATUS OF APPARENTLY SUCCESSFUL OFFEROR THIS ACQUISITION IS 100% SET-ASIDE FOR QUALIFIED SERVICE DISABLED VETERAN OWNED SMALL BUSINESS AE FIRMS INCOMPLIANCE WITH VAAR 852.219-10. ONLY BUSINESSES VERIFIED AND LISTED IN THE VENDOR INFORMATION PAGES DATABASE, (http://www.Vetbiz.gov), SHALL BE CONSIDERED. SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Registrations require that federal contractors register in the System for Award Management (SAM) database at www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their qualifications package. THE EXCLUDED PARTIES LIST SYSTEM (EPLS): To ensure that the individuals providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at www.sam.gov for each person providing services under this contract. Further the contractor is required to certify that all persons listed in the qualifications package have been compared against the EPLS list and are NOT listed. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities. E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall be required to enroll in E-Verify within 30 days of the contract award date. They shall also need to begin using the E-Verify system to confirm that all of their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54) A-E firms are required to respond if interested by submitting one (1) completed Standard Form 330 qualification package Parts I and II to include all consultants (form available on-line at: http://www.gsa.gov/portal/forms/download/116486) Must include in Part I Section H an organizational chart of the firm (excludes consultants) and a design quality management plan. Submission information incorporated by reference is not allowed. All submissions shall be made electronically. Completed package shall be delivered electronically on or before 06/13/2019 at 2:00PM Central Standard Time to the NCO 15 Contracting Office, Attn: Mike Bottary, Contracting Officer @ Michael.Bottary@va.gov PROJECT INFORMATION The mission of the Veterans Affairs Poplar Bluff Health Care System (VAPBHCS) is to provide the highest quality health care to our nation s veterans. In order to accomplish this mission, VAPBHCS Facility Engineering Service (FES) intends to partner with an Architect/Engineer A/E or Engineer Firm for a design completion to conduct a Physical Security Assessment in accordance with VA's PSDM (Physical Security Design Manual) and additional supplemental guidance published by VA for VA owned and leased facilities at the VA Poplar Bluff Healthcare System. SCOPE OF WORK The Prime contractor shall have the capability to provide Basic Professional Services as delineated in the Scope of Work. As part of the Basic Professional Services, FES expects the following primary A/E disciplines to be included: The specific disciplines which will be included are Architects, Civil Engineer, Mechanical Engineers, Electrical Engineers, Structural Engineers, Industrial Hygienists, Estimators, CAD operators, Project Managers, LEED Consultant, Fire Protection Engineer, and Interior Designer.). Existing Conditions: The PSDM s contain the physical security standards for improving the protection of mission critical and life safety facilities of the U.S. Department of Veterans Affairs (VA). Mission Critical facilities are those required to continue operation during a natural or manmade extreme event. Life-safety protected facilities shall include all VA facilities designated as not mission critical. Guidance found on Real Property Policy Memorandum 2018-02 applies to all leased facilities. This assessment will include both owned and leased facilities for the VA Saint Louis Healthcare System. Project Intent: Architect and Engineering ( A/E ) services are needed for design completion and construction period services for the construction project to Conduct Physical Security Assessment. The PSDM s contain the physical security standards for improving the protection of mission critical and life safety facilities of the U.S. Department of Veterans Affairs (VA). Mission Critical facilities are those required to continue operation during a natural or manmade extreme event. Life-safety protected facilities shall include all VA facilities designated as not mission critical. Guidance found on Real Property Policy Memorandum 2018-02 applies to all leased facilities. This assessment will include both owned and leased facilities as identified on Attachment A, List of VA Leased Facilities. The physical security of facilities requires the use of concentric levels of control and protection to provide progressively enhanced levels of security to deter, prevent, detect, delay, and respond to threats in the protection of assets. The concept of concentric levels of control is to protect the central asset behind layers of security measures such that it is least exposed to the threats. Where a single line of defense might be easily breached, the concentric levels approach offers redundancy in lines of defense that is less likely to be breached. VA also follows the principles of Crime Prevention Through Environmental Design (CPTED, see www.cpted.net). CPTED strategies include elements of natural surveillance, natural access control, and natural territorial reinforcement. CPTED strategies are to be considered by the contractor in the development of recommendations tasked below to create and enhance the concentric circles or layers of security protection. The SOW for this task order organizes the VA PSDM concepts for existing campus/buildings into 3 tasks based on the Point of Control level and applicable PSDM concept chapters 3-10 for existing buildings. General Scope Tasks: Task 1 PSDM Point of Control levels 1 and 2: The first objective of the physical security assessment is to compare and develop a gap analysis of existing building and site conditions as they relate to the VA s PSDM s first and second level points of control. The assessment will be made through document review and data gathering, owner interviews, and guided walkthrough non-invasive visual inspections addressing each of the applicable PSDM concepts. The document review will be based on VA provided Facilities Condition Assessments (FCA s), existing building data, past security assessments, current Capital Plans (SCIP and Master Plans), existing as-built building drawings, Site Plans, and Google Earth building visual analyses. Interviews will be scheduled and coordinated with required VA staff to obtain compliance knowledge prior to visual inspections. The contractor s visual inspection team will be accompanied by appropriate VA staff such as engineering and police. This task will apply to both owned and leased facilities identified in Attachment A. Task 2 PSDM Point of Control levels 3-5: The second objective of the physical security assessment is to compare and develop a gap analysis of existing building conditions as they relate to the VA s PSDM s third through fifth points of control. This assessment will be conducted through document review, data gathering, and owner interviews. A physical inspection is not required for these PSDM concepts. The document review will be based on VA provided Facilities Condition Assessments (FCA s), existing building data, past security assessments, current Capital Plans (SCIP and Master Plans), existing as-built building drawings, Site Plans, and Google Earth building visual analyses. Interviews will be scheduled and coordinated with required VA staff to obtain compliance knowledge. If as part of the document review and interview process, its determined sufficient information does not exist to determine a gap with the PSDM concepts, the contractor will flag the applicable PSDM concept for the need of a future assessment. This task will apply only to owned buildings. Task 3 Structural Analysis: There are sections of the VA PSDM requiring certain existing building or site components meet specified test levels, blast and or structural calculations. The VA is not requesting anti-ram testing, deflection calculations or testing, blast load calculations, or any other required structural system calculations. Where such items are specified in the VA PSDM, the risk assessments specified under Task 1 and Task 2 above will be based on a desk top audit of any related VA provided information; and the limits of the non-invasive visual walkthrough specified under Task 1. Structural Analysis by a qualified structural engineer will be limited to providing high level input into the recommendations associated with Task 1 only which focuses on protection of the building exteriors from blast and vehicular ramming threats. The PSDM has been interpreted that Progressive Collapse review is not required for existing buildings. To address potential risk associated with the VA s PSDM Progressive Collapse requirements, analysis to be performed under Task 3 of this SOW will be limited to the development of a list of high risk owned and leased buildings based on a VA provided list of buildings that have not had a previous seismic study and that are more than one floor. The contractor will develop a list of these buildings and develop recommendations in the summary report limited to those that would enhance building perimeter protection. Specific Scope Tasks: Members of the A/E Analysis Team: The contractor shall form a project team to work with VA representatives to create the VA/A-E Analysis Team, which shall include, at a minimum, Risk Analyst, Architect, Physical Security expert, and VA Planning and Engineering representatives. The Plan shall include their titles, roles, and contact information. Gap Analysis and Recommendations: In support of Task 1 and 2 above, Contractor shall record and identify gaps and vulnerabilities between existing conditions and the PSDM concepts. The contractor shall establish corrective action recommendations to be taken when buildings are deemed to be at risk or non-compliant with current PSDM s. Risk Analysis Summaries: Contractor shall develop a Risk Analysis Summary integrating assessment findings that includes building numbers, risk elements related to the specified PSDM s concepts, and the corrective action recommendations to alleviate the risks for each building analyzed. The summaries shall also indicate whether the contractor team judges the risk to be significant and briefly state the basis for that decision. The risk summaries and preferred corrective recommendations shall be organized into a spreadsheet report that can also be placed as a legend on the campus site diagrams. Develop Rough Order of Magnitude Budget Estimates and Service Implications: Contractor shall develop high level cost and budget estimates, on a rough order of magnitude, to implement the recommended corrective actions for each building and portray the implications of the recommendations in terms of costs and interruption of services. Campus Site Diagram: The contractor will develop a campus based site diagram to identify out of compliance deficiencies. The site diagram shall provide call-out symbols for each identified Task 1 and Task 2 deficiency placed at or near the location of the deficiency, crossed referenced to a summary legend placed on the diagram. The diagram should also include a graphical representation of non-compliant facility standoff distances to roads and parking. The diagram will color code mission critical and life safety buildings. To accommodate the data to be placed on the diagram, a standard 30X42 drawing size is acceptable. Assessment Schedules: Contractor shall review Scope of Work, and then develop a work plan/process (work breakout structure - WBS) as well as a schedule of facility and building survey/analyses to be submitted to the Contracting Officer (C.O.) and Contracting Officer Representative (COR) for approval prior to start of the assessments. Contractor shall ensure the schedules include the dates, hours, and tasks to be applied to the assessments. Master Plan Updates: Contractor shall create an Annex to the facility Master Plan at each major facility/healthcare system incorporating the findings of the risk assessment into the facility master plan. The Contractor shall compare all recommended corrective actions to the most recent SCIP Action plan and existing Master Plan and develop a report demonstrating additional projects that need to be added in SCIP Master Plans. The facility will be responsible for entering any needed projects into their Master Plans and SCIP plans. The annex will be a hard copy binder that includes the Campus Site Diagram, risk assessment findings, Task 3 high risk list of buildings for Progressive Collapse, recommended corrective actions, summary report, and list of projects to be added into the SCIP action plan. The A/E shall make recommendations to the VA representatives as to which deficiencies should be corrected through capital initiatives and which should be submitted for a waiver or exception. The A/E shall be solely responsible for the Task Order management, including all associated labor, equipment, materials, mailing costs, and inspections, to meet the requirements of the study project. The A/E shall further provide meeting minutes for all meetings held under this study project. Data Gathering and Kickoff Meetings: The VA Contracting Officer (CO), VA Contracting Officer Representative (COR), and Contractor shall conduct a post award Kickoff meeting at the facility to discuss and develop a process and checklist for data gathering, collection of existing materials, and drawings. The statement of work will be reviewed, and the Contractor shall identify any questions or other issues which need to be addressed in the Task Order before contractor begins the study. The Facility Team shall work collaboratively with the Contractor to provide data required with enough detail, in an appropriate format, and in a timely manner to complete the studies, surveys, and analyses. The Contractor will be expected to collect any additional data and information, as available, from both VA corporate and local VA sources that would enhance the survey. The work processes for the data analyses, buildings assessments, corrective recommendations, Master Plan implementation of recommendations, and risk reviews shall be in accordance with the general schedule below. In accordance with FAR 36.204, the estimated magnitude of the design project is between $100,000.00, and $250,000.00. Period of performance shall not exceed 225 calendar days. EVALUATION FACTORS: Selection Criteria are in accordance with Federal Acquisition Regulation (FAR) Part 36.602-5 and VA Acquisition Regulation (VAAR) Part 836.602-1.   Prospective firms are required to address all selection criteria within submitted SF330 packages using additional pages as necessary.   SF 330 submissions including any additional pages are not to exceed fifty (50) pages. Each page cannot exceed 81/2 x 11 in size. Prospective firms are required to address all selection criteria within submitted SF330 packages using additional pages as required and SF 330 submissions including any additional pages are not to exceed fifty (50) pages. Qualifications (SF330) submitted by each firm for Project #657A4-19-350 for VAPBHCS will be reviewed and evaluated based on the following evaluation criteria listed below in descending order of importance: (1) PROFESSIONAL QUALIFICATIONS: The qualifications of the individuals which will be used for these services will be examined for experience and education and their record of working together as a team. A&E firms shall have licensed professional architects/engineers currently registered in the state of Missouri or in a state of which Missouri has recognized the engineering license. The specific disciplines which will be evaluated are Risk Analyst, Architect, Physical Security expert, Civil Engineer, Structural Engineer, Estimator, CAD operator, and Project Manager. (2) SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE: Specific experience and technical skill in the type and scope of work required to conduct a Physical Security Assessment for existing medical facilities and leased facilities, including, where appropriate, experience in conducting Physical Security Assessments in accordance with the Physical Security Design Manual (PSDM) which includes gap analysis, risk analysis, budget estimates, site diagrams, and structural analysis, will be examined. Experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. (3) CAPACITY TO ACCOMPLISH WORK: The general work load and staffing capacity of the design office which will be responsible for the majority of the design and the ability to accomplish the work in the required time. In accordance with VAAR 852.219-10(c)(1), prime contractors shall clearly demonstrate how they will meet the requirement that at least 50 percent of the design work be accomplished by employees of the concern or employees of eligible service-disabled veteran owned small business subcontractor/consultant. (4) PAST PERFORMANCE: The VA will consider at a minimum three past performance projects related to the Physical Security Assessments and/or design and construction that has met the current Physical Security Design Manual requirements that are complete and that the firm has completed relevant in scope to the advertised project that were accomplished with the Department of Veterans Affairs, other Government agencies, and private industry in terms of cost control, quality of work, and compliance with performance schedules will be examined. Project past performances that are older than 3 years will receive a lesser score than those references for projects accomplished within the past 3 years. (5) LOCATION OF DESIGN FIRM: The geographic proximity of each firm to the location of the VA Medical Center will not be evaluated. (6) CLAIMS AND TERMINATIONS: Provide documentation of significant claims against the firm or terminated contracts because of improper or incomplete architectural and engineering services. They will be examined. (7) REPUTATION IN A-E COMMUNITY: Provide documentation regarding reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (06-MAY-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link To Document
(https://www.fbo.gov/spg/VA/LeVAMC/VAMCKS/36C25519R0083/listing.html)
 
Place of Performance
Zip Code: 63901
 
Record
SN05303100-F 20190508/190506230051 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.