Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 31, 2019 FBO #6398
MODIFICATION

Z -- GSA Region 8 IDIQ Contract for Small Project Delivery in North Dakota

Notice Date
5/30/2019
 
Notice Type
Modification
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Public Buildings Service (PBS) - CO Acquisition Services Division (47PA01)
 
ZIP Code
802250546
 
Solicitation Number
47PJ0019R0119
 
Response Due
6/6/2019
 
Archive Date
6/21/2019
 
Point of Contact
David Berry
 
Small Business Set-Aside
Total Small Business
 
Description
Questions: 1) Solicitation references supplemental SF 1442. It doesn ™t appear this document was provided on fbo.gov 2) How are non-priced items (Items that are not found in RS Means) handled? Is there a separate coefficient for these items? 3) Solicitation references Attachment 3. It doesn ™t appear this document was provided on fbo.gov 4) Solicitation references design drawings/design packages. Is design required by the contractor? If so can design costs be separate from the coefficient? 5) If design is required what level of design is required? i.e. 35%, 65% or 100%. Do design drawings need to be stamped if design is required? 6) Are the seed project drawings/SOW for reference only? Is seed project pricing required with proposal? 7) If CPARS or previously completed questionnaires are available can these be used in lieu of sending out new PPQ ™s? Answers 1) Supplemental 1442 attached here to the amendment 2) Any non-priced items not found in RS Means will be handled and procured through other avenues. 3) Attachment 3 was missed and is attached to this amendment 4) On the sample SOW it has boiler plate language referencing design but no design or design build services will be obtained through the task orders 5) No design will be required 6) The Seed project is for reference only, seed project pricing is not required with proposal. 7) Sometimes a lot of projects that are done do not end up in CPARS, and the questionaires give you an opportunity to choose the projects you would like to highlight. CPARS can be used in lieu of the PPQs. Times/dates for site visits 5/21/19: 9AM Fargo 1PM Grand Forks 5/22/19: 9AM Pembina NOTE: THIS NOTICE MAY HAVE POSTED ON FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (30-MAY-2019). IT ACTUALLY APPEARED OR REAPPEARED ON THE FEDBIZOPPS SYSTEM ON 29-MAY-2019, BUT REAPPEARED IN THE FTP FEED FOR THIS POSTING DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link To Document
(https://www.fbo.gov/notices/0d08539eb9ff2bca1dd9b7a2cc972c66)
 
Record
SN05325653-F 20190531/190529230053 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.