SOURCES SOUGHT
65 -- Sitmatic Chair Repair
- Notice Date
- 6/6/2019
- Notice Type
- Synopsis
- NAICS
- 337127
— Institutional Furniture Manufacturing
- Contracting Office
- Department of Veterans Affairs;VISN17 Network Contracting Activity;7400 Merton Minter Blvd. (10N17/90C);San Antonio TX 78229
- ZIP Code
- 78229
- Solicitation Number
- 36C25719Q0884
- Response Due
- 6/10/2019
- Archive Date
- 6/25/2019
- Point of Contact
- Mr. Casiano on June 10 2019 no later than 4PM CST
- Small Business Set-Aside
- N/A
- Description
- ITEM NUMBER DESCRIPTION OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 0001 158.00 EA $0.00 $0.00 BAK073 M3 Super Beta Back, M3 LOCAL STOCK NUMBER: BAK073 0002 158.00 EA $0.00 $0.00 SET073 Super Beta Seat,, 0 M3 LOCAL STOCK NUMBER: SET073 0003 158.00 EA $0.00 $0.00 installation LOCAL STOCK NUMBER: install GRAND TOTAL $0.00 This Sources Sought Notice is for informational and planning purposes only and shall not be construed as a solicitation or as an obligation or commitment by the Government. This notice is intended strictly for market research. The purpose of this Sources Sought notice is to determine interest and capability of businesses including (but not limited to) 8(a), HUBZone, Service Disabled Veteran-Owned Small Business, and Veteran-Owned Small Business firms relative to the North American Industry Classification Code (NAICS) 337127. The Department of Veterans Affairs is seeking both manufacturers and/or distributors of the exact match or functionally equivalent equipment/ services to the following listed above on Monday June 10, 2019 No Later Than 4PM CST. STATEMENT OF WORK/ PERFORMANCE WORK STATEMENT TEMPLATE GENERAL INFORMATION Title of Project: Chair Repair for the McAllen Outpatient Clinic 2. Scope of Work: VATVCBHCS has a requirement for the replacement of 158 vinyl seat backs and seat cushion chairs that have incurred damage due to fabric delamination at our McAllen Outpatient Clinic that are purposed for VCB staff and employees which are only manufactured by Sitmatic. These replacements are not covered by the existing 12 year warranty. The contractor shall provide all resources necessary to accomplish the deliverables described in this statement of work (SOW), except as may otherwise be specified. 3. Background: It is necessary for VATVCBHCS to provide all VCB staff members employed at VA Facilities throughout the Rio Grande Valley covering Harlingen, McAllen, Corpus Christi and Laredo exceptional workstations to include these ergonomically inclined chairs in order to better serve our veteran patient population. Past performance of purchasing these chairs throughout our VISN 17 facilities and the current 800 chairs in use have assisted in determining that it is in the best interest of the government to have them replaced by the original manufacturer. The McAllen Outpatient Clinic located at 901 E. Hackberry Ave. McAllen, TX, 78503 is required to replace seat cushions and upholstery seat backs for 158 chairs whose supplies have been deemed to be available only from the original source manufacturer. 4. Performance Period: The contractor shall complete the work required under this SOW by August 1, 2019 or less from date of award, unless otherwise directed by the Contracting Officer (CO). If the contractor proposes an earlier completion date, and the Government accepts the contractor s proposal, the contractor s proposed completion date shall prevail. The work shall begin within _30 calendar days of award, unless otherwise specified. Work at the Government site shall take place after clinic hours from 4:30 p.m. to 9:00 p.m. and weekends from 08:00 a.m. to 4:30 p.m. central standard time excluding holidays. The Government recognized US holidays are: New Year s Day, Martin Luther King, Jr. Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day. If the holiday falls on Sunday, it is observed on Monday. 5. Type of Contract: Firm-Fixed-Price. B. CONTRACT AWARD MEETING The contractor shall not commence performance on the tasks in this SOW until the CO has conducted a kick off meeting, or has advised the contractor that a kick off meeting is waived. C. GENERAL REQUIREMENTS 1. For every task, the contractor shall identify in writing all necessary subtasks (if any), associated costs by task, along with associated sub-milestone dates. The contractor's subtask structure shall be reflected in the technical proposal and detailed work plan. 2. All written deliverables shall be phrased in layperson language. Statistical and other technical terminology shall not be used without providing a glossary of terms. 3. Where a written milestone deliverable is required in draft form, the VA will complete their review of the draft deliverable within 1_ calendar days from the date of receipt. The contractor shall have _1__ calendar days to deliver the final deliverable from date of receipt of the Government s comments. D. SPECIFIC MANDATORY TASKS AND ASSOCIATED DELIVERABLES Description of Tasks and Associated Deliverables: The contractor shall provide the specific deliverables described below within the performance period stated in Section A.4 of this SOW. Task One: The contractor shall provide a detailed work plan and briefing for the VA project team, which presents the contractor's plan for completing the task order. The contractor's plan shall be responsive with this SOW and describe, in further detail, the approach to be used for each aspect of the task order as defined in the technical proposal. Deliverable One: Supply, Deliver and Install 158 seats and seat backs for super beta chairs. Deliverable Two: Evaluate 158 super beta chairs for repairs covered under warranty to include but are not limited to: the operation and functionality of the chair, seat height control, seat back control, seat depth adjustment, arm rest stability, and seat tension control. E. EVALUATED OPTIONAL TASKS AND ASSOCIATED DELIVERABLES (not applicable) SCHEDULE FOR DELIVERABLES 1. Unless otherwise specified, the number of draft copies and the number of final copies shall be the same. 2. If for any reason any deliverable cannot be delivered within the scheduled time frame, the contractor is required to explain why in writing to the CO, including a firm commitment of when the work shall be completed. This notice to the CO shall cite the reasons for the delay, and the impact on the overall project. The CO will then review the facts and issue a response, in accordance with applicable regulations. G. CHANGES TO STATEMENT OF WORK Any changes to this SOW shall be authorized and approved only through written correspondence from the CO. A copy of each change will be kept in a project folder along with all other products of the project. Costs incurred by the contractor through the actions of parties other than the CO shall be borne by the contractor. H. REPORTING REQUIREMENTS 1. The contractor shall provide the PM/TM with monthly [frequency determined by project s duration] written progress reports (original plus ___ copies). These are due to the PM/TM by the second workday following the end of each calendar month, throughout the project's duration. The PM/TM is required to provide monthly progress reports to the Contracting Officer s Technical Representative (COTR) by the fifth workday of the new calendar month. 2. The progress report shall cover all work completed during the preceding month and shall present the work to be accomplished during the subsequent month. This report shall also identify any problems that arose, along with a statement explaining how the problem was resolved. This report shall also identify any problems that have arisen but have not been completely resolved, with an explanation. I. TRAVEL Travel expenses are the responsibility of the contractor. J. GOVERNMENT RESPONSIBILITIES The government will provide 158 Sitmatic super beta chairs, an area to perform work, and on-site personnel to provide access to the building with supervision with the appropriate access to the office for the delivery and installation of the seat cushions/seat backs located at McAllen Outpatient Clinic located at 901 E. Hackberry Ave. McAllen, TX, 78503.. K. CONTRACTOR EXPERIENCE REQUIREMENTS The government will determine on a SR basis what positions are considered key personnel. The contractor shall identify, by name, the key management and technical personnel who will work under this task order at the time the work is being negotiated. If a key person becomes unavailable to complete the SR, the proposed Substitutions of key personnel shall be made only as approved directed by the Contracting Officer and the COTR. The government will not dictate specific experience and education requirements of the employees initially proposed to perform the work stated herein. The contractor shall submit a resume of qualifications for the COTR and all other direct employees proposed for the project. All Contractor employees will be approved by the COTR prior to bringing on duty. If, at any time from date of award to the end of the contract, non-key personnel Contractor personnel are no longer available, HES/HIS reserves the right to review the qualifications of the proposed replacement personnel and to reject individuals who do not meet the qualifications set forth in the TLO. Team personnel proposed by the contractor should possess some of the following knowledge and/or skills: The contractor must notify VHA in advance and we will approve or reject proposed contractor key personnel for the performance of this contract. The contractor shall submit a resume of qualifications to the COTR for key personnel and all other direct employees proposed for the project. All Contractor employees will be approved by the COTR prior to bringing on duty. If, at any time from date of award to the end of the contract, Contractor personnel are no longer available, the VHA will approve the qualifications of proposed replacement personnel and will reject individuals who do not meet qualifications set forth herein. The contractor must inform the VHA COTR, and Project Manager/Task Manager when personnel are removed from the contract for any reason. The Contractor shall remove any employee from the performance of this contract within five (5) workdays of receiving notice from the Contracting Officer that the employee's performance is unsatisfactory. All Contractor employees are subject to immediate removal from performance of this contract when they are involved in a violation of the law, VA security, confidentiality requirements and/or other disciplinary reasons. The contractor must inform the VHA COTR, and Project Manager/Task Manager when personnel are removed from the contract for any reason. If a key person becomes unavailable to complete the SR, proposed Substitutions of key personnel shall be made only if approved by the COTR and Project Manager. The contractor shall submit a resume of qualifications to the COTR for all direct employees proposed for the project. All Contractor employees will be approved by the COTR prior to bringing on duty. L. CONFIDENTIALITY AND NONDISCLOSURE It is agreed that: 1. The preliminary and final deliverables, and all associated working papers, application source code, and other material deemed relevant by VA which have been generated by the contractor in the performance of this task order, are the exclusive property of the U.S. Government and shall be submitted to the CO at the conclusion of the task order. 2. The CO will be the sole authorized official to release, verbally or in writing, any data, draft deliverables, final deliverables, or any other written or printed materials pertaining to this task order. No information shall be released by the contractor. Any request for information relating to this task order, presented to the contractor, shall be submitted to the CO for response. 3. Press releases, marketing material, or any other printed or electronic documentation related to this project, shall not be publicized without the written approval of the CO. CONTRACTOR PERSONNEL SECURITY REQUIREMENTS This language is still in draft form. The OI Service Center is reviewing alternative sources for background investigations. All contractor employees who require access to the Department of Veterans Affairs computer systems shall be the subject of a background investigation and must receive a favorable adjudication from the VA Office of Security and Law Enforcement prior to contract performance. This requirement is applicable to subcontractor personnel requiring the same access. Position Sensitivity The position sensitivity has been designated as Low Risk. Background Investigation The level of background investigation commensurate with the required level of access is ____________ (Insert Background Investigation, Minimum Background Investigation or National Agency Check with Written Inquiries). Contractor Responsibilities The contractor shall prescreen all personnel requiring access to the computer systems to ensure they maintain a U.S. citizenship, and are able to read, write, speak and understand the English language. The contractor shall submit or have their employees submit the required forms (SF 86 or SF 85P, SF 85P-S, FD 258, Contractor Fingerprint Chart, VA Form 0710, Authority for Release of Information Form, and Optional Forms 306 and 612) to the VA Office of Security and Law Enforcement within 30 days of receipt. The contractor, when notified of an unfavorable determination by the Government, shall withdraw the affected employee from working under the contract. Failure to comply with contractor personnel security requirements may result in termination of the contract for default. 4. Government Responsibilities The VA Office of Security and Law Enforcement will provide the necessary forms to the contractor, or to the contractor s employees, after receiving a list of names and addresses. Upon receipt, the VA Office of Security and Law Enforcement will review completed forms for accuracy, and forward the forms to the office of Personnel Management (OPM) to conduct background investigations. The VA Office of Security and Law Enforcement will notify the CO, and contractor, of adjudication results received from OMB. Upon being notified about a favorable determination, the CO may issue a notice to proceed to the contractor. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (06-JUN-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
- Web Link
-
Link To Document
(https://www.fbo.gov/spg/VA/VASTHCS/VASTHCS/36C25719Q0884/listing.html)
- Place of Performance
- Zip Code: 78550
- Record
- SN05333371-F 20190608/190606230023 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |