Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 28, 2019 FBO #6426
SOLICITATION NOTICE

Z -- McCall Air Base Apron Replacement-Payette NF

Notice Date
6/26/2019
 
Notice Type
Synopsis
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
1249 S. Vinnell Way, SUITE 200 Boise ID 83709
 
ZIP Code
83709
 
Solicitation Number
12026119R0010
 
Archive Date
9/30/2019
 
Point of Contact
Tanya Spanfellner, Contracting Officer, Phone 208-373-4130
 
E-Mail Address
tanya.spanfellner@usda.gov
 
Small Business Set-Aside
Total Small Business
 
Description
MCCALL AIR BASE APRON REPLACEMENT A. This project consists of reconstructing the Forest Service Aircraft Apron at the McCall Airport in support of the Fire Aviation Program. Additional work at the site includes installing security fencing and gates, constructing additional parking, replacing existing asphalt parking areas, and asphalt pavement over existing aggregate surfacing to limit the effects of rotor downwash. The project also included the removal and disposal of existing pavements and fencing on the site. Apron concrete pavement shall be placed using a slip form paver. B. Work performed within the Airport secured area must be coordinated with the McCall Airport Authority. All work performed within the Mission Street Right of Way including: Culvert removal and installation, roadside ditch improvements, and asphalt access improvements, must be coordinated with the City of McCall. C. Base Bid: The base bid work includes the removal of the south side of the existing apron pavements, excavation, full pavement replacement section, tie down installation (install a grounding connection and rod for each aircraft at each group of tie downs in accordance with FAA Standards), paint striping, fence and gate removal and installation (as shown on the drawings), signing, and seeding. D. Bid Options: 1. Option A: Apron Asphalt North. Work includes the removal of the north side of the existing apron pavements, excavation, full pavement replacement section, paint striping, signing, and seeding. 2. Option B: Aircraft Concrete Parking Pads. Work includes placing individual concrete pads and tie downs. 3. Option C: Aircraft Concrete Parking Area. Work includes placing concrete and tie downs. 4. Option D: Helipad Pavement. Work includes placement of asphalt over existing aggregate base material around existing helipads. Construct storm water detention basin, and storm water conveyance system. 5. Option E: Overflow Parking. Work includes construction of overflow parking area and access road, culvert installation, construction of asphalt path, installation of man gate with security locks, grading for new landscaped berms, signing, and seeding. 6. Option F: Helibase Parking. Work includes full section construction of additional parking stalls and paint striping, and seeding. 7. Option G: North Smokejumper Access. Work includes removal of existing asphalt surfacing, removal of existing wheel stops, removal of existing culvert, and removal of existing manual slide gate. Work also includes: installation of new culvert, full depth asphalt section installation, paint striping, installation of new manual slide gate, signing, and seeding. 8. Option H: Airtanker Base Parking Area and additional Asphalt. Work includes removal of existing culverts, removal of asphalt pavement, removal of wheel stops, and the installation of new culverts, full asphalt pavement section, paint striping, signing, and seeding. 9. Option I: North Access Road. Work includes installation of full asphalt pavement section, manual slide gates, signing, and seeding. 10. Option J: Smokejumper Base Parking Area. Work includes pulverization and removal of existing asphalt parking lot, removal of culvert, installation of full asphalt pavement section, installation of culvert, and paint striping. 11. Option K: Gates and Fencing. Work includes removing existing fencing along the south and west forest service boundary, installing new chain link fencing, removal of existing gates and installation of an automatic vertical pivot gate with associated key pad, and installation of multiple slide and pedestrian gates. 12. Option L: Fuel Containment Basin. Work includes removal of existing asphalt, construction of concrete fuel containment basin and asphalt repair. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (26-JUN-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link To Document
(https://www.fbo.gov/spg/USDA/FS/261/12026119R0010/listing.html)
 
Place of Performance
Address: McCall, ID
Zip Code: 83638
Country: US
 
Record
SN05352376-F 20190628/190626230010 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.