SOURCES SOUGHT
48 -- Parts for feed water valve
- Notice Date
- 6/26/2019
- Notice Type
- Synopsis
- NAICS
- 332911
— Industrial Valve Manufacturing
- Contracting Office
- Department of Veterans Affairs;VA Connecticut;950 Campbell Avenue;West Haven CT 06516
- ZIP Code
- 06516
- Solicitation Number
- 36C24119Q0388
- Response Due
- 6/26/2019
- Archive Date
- 8/25/2019
- Point of Contact
- Barbara.Charles@va.gov
- Small Business Set-Aside
- N/A
- Description
- VA Connecticut Healthcare Systems Newington Campus plant Various repairs to chillers and starter in 689-19-2-4810-0783 PM Harlan B Corriveau Page 2 of 2 SALIENT CHARACTERISTICS Purchase of Feedwater valve for replacement FISHER 1-1/2 300# FLANGED BODY WITH 1 416 SS REDUCED TRIM SIZE 34 FAIL CLOSED ACTUATOR FISHER 3682 I/P POSITIONER Quantity of 3. The valves are for 3 boilers, which boiler #1 was built in 1975 and manufactured by Zurn Industries, boiler #2 and #3 were built in 1958 and manufactured by Bigelow Company. Work Location and Restrictions: The work site location is at the Newington VA Medical Center at 555 Willard Avenue, Newington, CT 06111. The contract work is intended to be done in Building 3, Boiler Plant. All work shall be done between the hours of 7:00AM to 5:00PM Monday through Friday, or weekends, holidays excepted, unless other times are arranged in advance and approved in writing by the VA designee. When the contractor s work interferes with hospital functions, such as when work produces excessive noise, odors, dust, utility service interruptions, or other interferences with normal hospital operations that cannot be contained within the area of work, the contractor shall schedule said work at other than normal hours and as directed by the VA designee. Storage of Equipment & Materials: The contractor shall arrange with the VA designee for allocation of required workspace and for the storage of equipment and material to be used for this project. Storage space is very limited. There are no exclusive areas within the campus that can be given to the contractor for their storage needs. Additionally, no space will be made available for the placement of a contractor trailer for this project. The Contractor should schedule delivery of materials to limit the amount of storage space and time. Debris Removal The Contractor/Installer shall be required to remove waste materials and debris daily from the campus. All waste material and debris shall be removed off the site by the contractor and shall be disposed of in accordance with applicable State and Federal regulations. Site Utilities: The Contractor/Installer should note this scope of work does not detail all existing structures, utilities, or components that may potentially interfere with the contract work required. The contractor shall note any obstruction, utility, or condition that may hinder or interfere with the execution of this contract and the contractor shall make provisions in their contract price to resolve such interferences and other conditions that may hinder the proper completion of the work. All proposed utility relocations, reallocations, and shutdowns shall be approved by the appropriate VA personnel prior to commencing such work. The contractor shall verify all existing utility installations and take appropriate action prior to working around any potential utility installation. In the event a shutdown, restriction, or interruption of any utility services is required, a written request must be submitted (at least 2 weeks in advance) and approved by the VA designee. All utility shutdowns must be reviewed and approved by the VA. SECURITY: All contractor personnel shall obtain a short-term identification badge issued by the VA designee. Such badge shall be worn by the individual and prominently displayed at all times while on VA property. No employee of the contractor shall enter the project site without a valid identification badge issued by the VA. In order to obtain a short-term identification badge, contractor personnel shall present to the VA designee a valid (non-expired) photo identification issued by a US federal, state or local government agency. All contractor personnel are subject to inspection of personal effects when entering or leaving the project site. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (26-JUN-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
- Web Link
-
Link To Document
(https://www.fbo.gov/spg/VA/WHVAMC/VAMCCO80220/36C24119Q0388/listing.html)
- Place of Performance
- Address: Department of Veterans Affairs;VAMC Togus;1 VA Center;Augusta, ME
- Zip Code: 04330-6796
- Country: USA
- Zip Code: 04330-6796
- Record
- SN05352601-F 20190628/190626230021 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |