Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 19, 2019 FBO #6447
SOLICITATION NOTICE

Z -- Facilities Decommissioning Project

Notice Date
6/11/2019
 
Notice Type
Synopsis
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
631 Coyote Street Nevada City CA 95959-2250
 
ZIP Code
95959-2250
 
Solicitation Number
129JGP19Q0095
 
Response Due
6/28/2019
 
Point of Contact
Robert Briney, Contracting Officer, Phone 5304786120
 
E-Mail Address
robert.briney@usda.gov
 
Small Business Set-Aside
Total Small Business
 
Description
This is the pre-solicitation for the Facilities Decommissioning Project. This project consist of Furnish all labor, equipment, and material to accomplish the work under this contract at three different sites on Sequoia National Forest land. Work includes but is not limited to the following major items: A. Cedar Creek Campground (Base Bid): 1. Demolish, remove, and dispose two (2) single user vault toilet buildings with vaults. B. Greenhorn Summit Work Center Metal Building Storage (Base Bid): 1. Demolish, remove, and dispose old metal storage building (approximately 1080 sq. ft.) with foundation including any footings and asphalt pavement. 2. Disconnect and remove the electrical service to the building, and one power pole which is no longer needed. C. Hot Springs Work Center: Fire Training Trailer Demolition Option No. 1 1. Demolish, remove, and dispose all building and related improvements at the Fire Training Trailer # 2016 (1430 sq. ft.) including skirting, jacks, foundation, and disconnection of utilities. NOTE: The vinyl floor tile mastic and roofing material seams and edges in this building are known to contain asbestos (see included reports) and must be managed in accordance with applicable regulations during demolition. D. Hot Springs Work Center: Fire Barracks Demolition Option No. 2 1. Demolish, remove, and dispose all building and related improvements at the Fire Barracks Trailer # 1217 (1430 sq. ft.) including skirting, jacks, foundation, and disconnection of utilities. NOTE: The vinyl floor tile mastic, and roofing material seams and edges in this building are known to contain asbestos (see included reports) and must be managed in accordance with applicable regulations during demolition. E. Hot Springs Work Center: Laundry Building Demolition Option No. 3 1. Demolish, remove, and dispose all above ground improvements at the laundry building #1601 (approx. 334 sq. ft.). Leave the existing concrete slab foundation in place. 2. Reconfigure the electrical service to serve remaining 3-phase and single phase loads. Disconnect and cap water and sewer utilities. This requirement will be awarded using Simplified Acquisition Procedures. The solicitation will be posted on or about 06/12/2019. NOTE: THIS NOTICE MAY HAVE POSTED ON FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (11-JUN-2019). IT ACTUALLY APPEARED OR REAPPEARED ON THE FEDBIZOPPS SYSTEM ON 17-JUL-2019, BUT REAPPEARED IN THE FTP FEED FOR THIS POSTING DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link To Document
(https://www.fbo.gov/spg/USDA/FS/9A63/129JGP19Q0095/listing.html)
 
Place of Performance
Address: 43474 Parker Pass Drive, Hot Springs, CA
Zip Code: 92240
Country: US
 
Record
SN05372394-F 20190719/190717230015 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.