Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 27, 2019 FBO #6455
SOURCES SOUGHT

38 -- Bayou Emergency Spillway Repair

Notice Date
7/25/2019
 
Notice Type
Synopsis
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
2000 Fort Point Road PO Box 1229 Galveston TX 77553-1229
 
ZIP Code
77553-1229
 
Solicitation Number
W912HY19B0036
 
Response Due
9/9/2019
 
Point of Contact
Ronalda Burton, Ms., Phone 409-766-3801, - Maria E Rodriguez, Contract Specialist, Phone (409)766-6331, Fax (409)766-3010
 
E-Mail Address
ronalda.burton@usace.army.mil, maria.e.rodriguez@usace.army.mil
 
Small Business Set-Aside
Total Small Business
 
Description
The U.S. Army Corps of Engineers, Galveston District Office requires a contract for Buffalo Bayou Emergency Spillway Repair, Houston, Texas, Harris County, Texas Project Information: The project shall include sealing and repairing joints and cracks in the roller compacted concrete spillway, constructing concrete piers, filling voids, and replacing damaged concrete lining. The Contractor will be required to clean the joints and cracks one up to one inch wide, and seal them with silicone sealant. Joints wider than 1 inch shall be grouted. Concrete piers will be used to stabilize the concrete pavement on the upstream side of Barker Dam North and Addicks Dam North spillways. Reinforced concrete will be constructed to replace damaged concrete lining location. Stabilize the upstream side slope concrete lining with the concrete piers before sealing or grouting the longitudinal cracks and joints at Barker Dam North spillway. The project will contain options which the Government may exercise at the time of award. The emergency spillways consist of earthen embankments capped with 8 inch thick roller compacted concrete on the downstream slope, the crown, and partially on the upstream slope. This concrete has no reinforcement, control joints or expansion joints. In the past, repairs have been performed to the concrete with reinforce concrete patches, and cracks and joints have been sealed with asphalt and silicon sealants. Option 1 Addicks Dam North Spillway -Stabilize the upstream side slope concrete lining with the concrete piers before sealing or grouting the longitudinal cracks and joints at Barker Dam North spillway. An additional 30 calendars days will be added to the completion time for this Option. Option 2 Concrete Piers at Barker Dam North Spillway - Where grout and sealant will be in contact, the grout is to be installed first and the silicon is to be applied after the grout has cured based on the manufacturer's recommendations. An additional 84 calendar days will be added to the completion time for this Option. Completion Time for the Base: 365 days. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (25-JUL-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link To Document
(https://www.fbo.gov/spg/USA/COE/DACA64/W912HY19B0036/listing.html)
 
Place of Performance
Address: 2000 Ft Point Rd Galveston , TX
Zip Code: 77550
Country: US
 
Record
SN05381342-F 20190727/190725230019 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.