Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 08, 2019 FBO #6467
SOLICITATION NOTICE

99 -- Philips Batteries

Notice Date
8/6/2019
 
Notice Type
Combine Synopsis/Solicitation
 
NAICS
453998 — All Other Miscellaneous Store Retailers (except Tobacco Stores)
 
Contracting Office
Claremore Indian Hospital 101 South Moore Claremore OK 74017
 
ZIP Code
74017
 
Solicitation Number
246-19-Q-0076R
 
Response Due
8/12/2019
 
Point of Contact
Miranda R. Nevills, Purchasing Agent, Phone 9183426447
 
E-Mail Address
miranda.nevills@ihs.gov
 
Small Business Set-Aside
N/A
 
Description
Description: This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested in response to this notice and a written solicitation will NOT be issued. This solicitation is being issued as a Request for Quote (RFQ). Submit only written quotes for a full preventative maintenance RFQ. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-98. This solicitation is not a 100% Small Business set-aside. The associated NAICS code is 453998 with a small business size standard of $25 million. Service the control on AHU3A 3D and the CT RTU Per the following: I.PURPOSE: To obtain required service to upgrade the controls for air handling unit (AHU) 3A and 3D and migrate their control over to the current WebCTRL building automation system (BAS), as well as to install controls and indication for the CAT scan (CT) roof top unit (RTU), which services critical spaces within the Radiology department serviced by AHU3D. II.BACKGROUND: AHUs 3A and 3D are currently controlled through the Siemens Apogee BAS. The various components with which this BAS communicates and controls the equipment are obsolete, and unattainable. Currently, AHU3A has a failed analog output that is preventing automated control of the cooling valve, as well as utilization of the advanced Philips Batteries - Federal Business Opportunities: Notices Page 1 of 5 https://www.fbo.gov/index.php?s=procurement&mode=form&id=e585d406a6c4a5186ff67... 7/24/2019 features of this new valve, which was installed in conjunction with a previous project. Also, the AHU3A control system currently cannot control the installed humidification valves, which were installed to correct the low-humidity deficiency identified in the Lab department, which this AHU services. AHU3D is located within the same penthouse adjacent to AHU3A and is controlled by the same obsolete BAS. It is prudent and cost-effective to complete the controls upgrade for this unit in conjunction with AHU3A's controls migration based on these conditions. The CT RTU is a package unit, which is a cooling unit only, and services a very temperature-sensitive space. Loss of this RTU can, and has, caused the loss of an X-ray tube valued at over $44,000. Facilities Maintenance has no ability to monitor this space or the functionality of this RTU at this time. Due to recent CT RTU failures that went unnoticed for an extended period of time while the space was not manned, it has been determined that monitoring and control of this RTU and the CT space is required. All of the above HVAC equipment is located on the roof of Claremore Indian Hospital (CIH), a single-story facility, with the AHUs being located within a dedicated penthouse. The CT RTU is located to the northeast of this penthouse, and within less than 25ft of it. The RTU is not under cover in any way. III.REQUIREMENTS: Contractor shall provide all equipment, materials, supplies, tools, travel, and labor required to migrate control of AHUs 3A and 3D onto the WebCTRL BAS, and to gain control of the CT RTU. In order for the AHU3A, 3D, and CT RTU service to be considered successful and acceptable to CIH Facilities Management, the following goals shall be met by the contractor unless otherwise specified: 1.At no time during this project shall the areas serviced by AHUs 3A, 3D, and the CT RTU be left unconditioned for more than 30 minutes. The CT area shall not be allowed to exceed 75F as read by calibrated hand-held instruments, or installed thermostats/sensors. Provision of healthcare services shall not be impacted in any avoidable way. 2.All controls for the equipment specified shall be connected to an ARCnet-ARCnet router supplied by the contractor, creating a network branch dedicated solely for HVAC equipment servicing the AHU3A/3D area. At the contractor's discretion, (2) network branches, one per AHU shall also be acceptable, but not required. Contractor is responsible for determining the minimum number of routers required to perform this work. 3.AHUs 3A, 3D, and the CT RTU shall be made visible and controllable through the WebCTRL BAS in similar fashion to other installed equipment currently controlled through this BAS. A rough representation of the desired AHU controls graphic is attached for reference only. 4.The sequence of operation of each piece of equipment to be controlled shall be approved by CIH Facilities Management prior to implementation. 5.Brand-new components, sensors, wiring, etc. shall be utilized for the completion of this project. Absolutely nothing shall be reused from the previous control system. This does not include replacement of installed damper actuators, valve actuators, blower motors, or VFDs. It does, however, include installation of additional damper actuators required to provide requested functionality for balancing the outside air dampers, mixed air dampers, and exhaust dampers of both AHUs. This shall include no more than (4) additional actuators for independent damper control. The installed CT RTU economizer damper shall also be reused unless incompatible with the control system. 6.Functionality for the new AHU controls shall provide, at a minimum, system control identical to the currently available controls with the addition of the following features: Philips Batteries - Federal Business Opportunities: Notices Page 2 of 5 https://www.fbo.gov/index.php?s=procurement&mode=form&id=e585d406a6c4a5186ff67... 7/24/2019 a.Independent control of the outside air dampers, exhaust dampers, and mixed air dampers with programmed safeties to prevent closing the mixed air and outside air dampers completely at the same time. b.Control of (2) humidification valves installed within AHU3A. These valves shall be staged to open in sequence. c.Thermal dispersion airflow measurement for each hot and cold duct within both AHUs. d.Duct pressure transducers for each hot and cold duct within both AHUs. e.Duct humidity sensors for each hot and cold duct, and return duct within both AHUs. Combination temperature/humidity sensors are acceptable. f.Control of supply and return VFDs for both AHUs, which shall be installed by CIH Facilities Maintenance. Control shall be based on supply duct pressures. g.Quantitative measurement of outside air flow utilizing sensors appropriate for this application. h.Dirty filter indication based on pressure drop across each filter bank. Quantitative indication of pressure drop is required. i.Addition of a building pressure sensor referencing outside atmospheric pressure and the building pressure as measured in a central open corridor or common area. 7.CT RTU controls shall be provided as follows: a.Control of this cooling-only RTU similar to other currently installed RTUs. b.Economizer control of the CT RTU which does not utilize the controller within the RTU. Control shall be identical to other RTU economizers currently controlled by WebCTRL. c.Temperature and humidity sensing of the CT space, with room sensor located in approximately the same location as the existing thermostat. d.Additional room sensors in the adjacent Dexascan room and at the east side of the CT space in the electrical equipment area. e.Mixed-air sensor installed. f.Dirty filter indication, similar to that requested for AHUs. This unit has a single, internal filter bank. 8.WebCTRL floor plan updated to reflect the CT RTU installation, with thermographics. 9.WebCTRL graphic added to reflect the footprint of the hospital, and AHUs 3A and 3D added to this footprint. Contractor-suggested optional display schemes are acceptable and encouraged, although final graphics layout shall be approved by CIH Facilities Management. 10.All low-voltage wiring shall be run in J-hooks or raceway. At no time shall wiring be attached to sprinkler piping or its support hangars. Wire shall not even touch these items. No existing control wire conduits shall be used for new control wiring unless migration allows the conduit to be emptied of all existing control wire prior to utilizing the conduit. Method of wire runs shall be approved by CIH Facilities Management prior to installation. Philips Batteries - Federal Business Opportunities: Notices Page 3 of 5 https://www.fbo.gov/index.php?s=procurement&mode=form&id=e585d406a6c4a5186ff67... 7/24/2019 11.CIH personnel shall perform and demolition of unused Siemens controls, sensors, and remaining wiring upon completion of this project. 12.CIH Facilities Electrician shall make all high-voltage connections, and all control cabinets shall have all highvoltage power sources labeled for location and voltage visibly on the external surface of the cabinet. 13.All wall penetrations shall be sealed properly based on the construction of the wall. Any wall penetrations and sealing methods shall have prior approval of CIH Facilities Management. 14.CIH personnel shall be provided with a minimum of (1) hour of in-service training covering the operational sequence of newly installed controls. IV.DELIVERABLES AND REPORTING REQUIREMENTS: A.Contractor shall deliver the following: 1.Equipment submittals for approval, prior to equipment installation. 2.Equipment required to meet the previously specified goals 3.Copies of all Operation and Maintenance manuals for all installed equipment. 4.Printed sequence of operation for each AHU/RTU. 5.In-service training of CIH Facility Maintenance personnel on the operation of the installed units and controls, once the system is operational and properly commissioned. 6.Safety Data Sheets for all hazardous materials used in the completion of this project, including refrigerants, oils, chemicals used during project, etc. 7.Copies of all factory warranty certificates for all installed equipment. 8.Contractor shall warranty all work for a minimum of 1 year. B.Contractor shall submit the following reports to the Facilities Engineer: 1.After performance of service, a detailed service report shall be submitted to CIH Facility Management containing the following information: a.Company name, address, and phone number. b.Name of technician(s) performing the work. c.Date work was performed. d.Detailed description of work performed. e.Operational recommendations, if any. f.List of parts replaced, equipment provided. g.Any other recommended changes needed to ensure proper system performance. C.SPECIAL PROCEDURES: 1.Contractor is required to call in advance to schedule the work. 2.CIH normal operating hours are 7:30 am to 4:30 pm, Monday through Friday. Contractor shall coordinate and schedule the service. Weekend and after hours work is allowed, but shall be coordinated with CIH Maintenance to ensure support personnel are available. 3.Immediately upon arriving at the facility, contractor shall report to the facilities maintenance department in order to sign into the visitor's log and obtain a visitor's badge. 4.Contractor shall provide a copy of the appropriate license or certification prior to performing any work. 5.Contractor, upon completion of the work, shall return to the facilities maintenance department to sign out, return the visitor's badge, and provide all required service reports prior to departing the facility. 6.The US PHS Claremore Indian Hospital is a tobacco/smoke free environment (buildings and grounds). No tobacco/smoking use shall be tolerated on-site. Philips Batteries - Federal Business Opportunities: Notices Page 4 of 5 https://www.fbo.gov/index.php?s=procurement&mode=form&id=e585d406a6c4a5186ff67... 7/24/2019 7.Contractor shall comply with all posted rules and regulations in the hospital and on hospital grounds including parking, no smoking or tobacco, etc. 8.Contractor shall comply with all Life Safety, Infection Control, and Occupational Safety rules, regulations, and instructions, both written and verbal while at the facility. 9.All on-site contractor workers shall perform infection control and safety training provided by the hospital. 10.Contractor shall coordinate with CIH Facilities Maintenance personnel to perform LOTO as required by NFPA 70E and 29CFR 1910.147. 11.Contractor shall coordinate with CIH Facilities Management any operation that could impair or suspend the services provided by or the normal operations of any hospital department. 12.Contractor shall coordinate with CIH Facilities Management any segregating of parking spaces to accommodate cranes, and the crane operations themselves 24hrs prior to performance. -POP 30 days after award NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (06-AUG-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link To Document
(https://www.fbo.gov/spg/HHS/IHS/IHS-Claremore/246-19-Q-0076R/listing.html)
 
Place of Performance
Address: 101 S. MOORE AVE. CLAREMORE, OK
Zip Code: 74017
Country: US
 
Record
SN05394684-F 20190808/190806230059 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.