Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 01, 2019 FBO #6491
MODIFICATION

56 -- Radio Tower Fencing

Notice Date
8/30/2019
 
Notice Type
Modification
 
NAICS
332322 — Sheet Metal Work Manufacturing
 
Contracting Office
3055 Rodman Avenue Rock Island IL 61299-8000
 
ZIP Code
61299-8000
 
Solicitation Number
W911RP-19-P-0010
 
Response Due
9/13/2019
 
Point of Contact
Riley J. DeBrock, Contract Specialist, Phone 3097823586, - Cindy S. Witherspoon, Contract Specialist, Phone 3097826760
 
E-Mail Address
riley.j.debrock.civ@mail.mil, cindy.s.witherspoon.civ@mail.mil
 
Small Business Set-Aside
Total Small Business
 
Description
1. The U.S. Department of Defense - Army, Pine Bluff Arsenal (PBA), Directorate of Public Works (DPW) has a requirement to increase the Physical Security of the Installation by installing fencing/bollards at the Radio Communication Tower. This solicitation is issued in accordance with FAR 12 (Acquisition of Commercial Items) and FAR Part 13 (Simplified Acquisition Procedures). Contract Line Item Information: CLIN 0001 - Supply and install fencing around Radio Tower at Area 8, Section 1: Buildings 81-100, 81-200, 81-300, and 81-400. In accordance with attached Scope of Work (Attachment 0001), 26 Aug 2019. CLIN 0002 - Contractor Manpower Reporting; Not Separately Priced. 2. A standard commercial warranty shall be included at no additional cost. In accordance with FAR 52.246-20, the warranty shall continue for a period of 1 year from the date of final acceptance of the installation. 3. The following are a list of attachments for this solicitation: Attachment 0001 - Radio Tower Fencing SOW, 26 Aug 2019 Attachment 0002 - Clause Addendums Attachment 0003 - Clause Incorporated by Reference Attachment 0004 - Radio Tower Images Attachment 0005 - Question and Answers 4. This requirement is issued as a 100% Small Business Set-Aside. The applicable NAICS code is 332322; size standard is 500 employees. 5. Period of Performance will begin within 2 weeks of contract award, with completion of requirement in 60 days of commencing. 6. Place of Performance: Pine Bluff Arsenal Area 8, Section 1: Buildings 81-100, 81-200, 81-300, and 81-400. Pine Bluff, AR 71602 7. Notes a. Quotes are due no later than 13 September 2019 at 11:59 AM CT b. Contract will be awarded in accordance with FAR 52.212-2 to the responsive and responsible contractor that holds the lowest price that is determined fair and reasonable, and meets the terms and conditions of this solicitation. c. Contractor is liable for accuracy of submitted quote(s) and for any incurred costs if quote(s) was submitted erroneously. d. Electronic Invoicing instructions shall be provided at time of award. e. Quotes submitted shall remain valid for 30 days. f. Contractors must be registered in the System for Award Management (SAM) in order to be eligible for an award with the U.S. Government. Application to this site can be found under the following link: www.sam.gov. Failure to comply with SAM registration may deem a quote ineligible for award. g. Please provide your GAGE code and DUNS number. h. Contract must submit certificate of insurance in accordance with FAR 52.228-5, or may not be considered for award. 9. Inspection and Acceptance is at destination FOB is destination. 10. For the contract resulting from this solicitation, the payment will be made by DFAS, via Wide Area Workflow (WAWF). 11. Although the Government intends to award the resultant contract without discussions, the Government reserves the right to open discussions. 12. Question Deadline: Questions shall be submitted in writing by 4 September 2019 at noon central time. 13. Point of Contact (POC) for this action is Mr. Riley J. DeBrock at riley.j.debrock.civ@mail.mil. 14. This is a solicitation, please provide price with supporting details by 13 Sep 2019, NLT 11:59AM CT. 15. A Site Visit will be conducted at Pine Bluff Arsenal on Monday, 9 September 2019. If you are a vendor interested in attending, please send an email to riley.j.debrock.civ@mail.mil, indicating the names of who will be attending from your company. An email response will include forms necessary to be granted access to the Pine Bluff Arsenal. Required forms will need to be filled out and returned NLT 2:00 PM CT on Thursday, 5 September 2019. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (30-AUG-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link To Document
(https://www.fbo.gov/notices/b8f8abc04c5acbea5aa7f32222fa75c8)
 
Place of Performance
Address: The local work covered by this specification is to be performed at Pine Bluff Arsenal. Postal address is Pine Bluff, Arkansas 71602-9500. Carload freight address is Baldwin, Arkansas on either the Union Pacific R.R. or the St. Louis Southwestern R.R. The Arsenal is located off Highway 65, Exit 32, about 12 miles northwest of Pine Bluff and 35 miles southeast of Little Rock. The job site is Area 8, Section 1: Buildings 81-100, 81-200, 81-300, and 81-400. Pine Bluff, AR
Zip Code: 71602
Country: US
 
Record
SN05426510-F 20190901/190830230034 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.