Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 11, 2019 FBO #6499
SOLICITATION NOTICE

Y -- NV FLAP CR 196(2), Silver Peak Road

Notice Date
9/9/2019
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
6982AF19B000014
 
Point of Contact
Jorey Deml, , Ryan Phillips,
 
E-Mail Address
cflacquisitions@dot.gov, cflacquisitions@dot.gov
(cflacquisitions@dot.gov, cflacquisitions@dot.gov)
 
Small Business Set-Aside
HUBZone
 
Description
THIS IS NOT A INVITATION FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT DETAILS: NV FLAP CR 196(2) Silver Peak Road The Silver Peak Road project is located on County Road 196 near the town of Silver Peak in Esmeralda County, Nevada. The project consists of 2.44 miles of roadway and drainage improvements. Improvements include construction of new paved road which includes earthwork, paving, box culverts, concrete headwalls, wingwalls at drainage structures. The project is a continuation of a previously completed project that paved CR 196 from the intersection with US 95. The project is outside Silver Peak, NV with the nearest town being Tonopah, NV which is 24 miles North from the project limits. The major work elements include roadway embankment, placement of borrow material, aggregate base, asphalt pavement, paved ditch, site repairs, pre-cast box culverts, concrete headwalls and wingwalls, HDPE culverts, and pavement markings. There will be up to 30 minute delays during construction. Weather conditions typically allow construction to begin in early spring. Significant quantities for the overall project include: Line Item Unit Est. Quantity Embankment Construction CUYD 60,000 Aggregate Base TON 9,500 Hot Asphalt Concrete Pavement TON 6,500 8’ x 8’ Precast Reinforced Concrete Box Culvert LNFT 200 Anticipated Schedule The Notice to Proceed for on-site activity is anticipated in late Winter/Spring 2020 Funding The anticipated cost range is between $4 million and $6 million. This solicitation will be set-aside for HUBZone small business concerns.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/6982AF19B000014/listing.html)
 
Place of Performance
Address: Esmeralda County, Silver Peak, Nevada, United States
 
Record
SN05437077-W 20190911/190909231130-ef0f98c10376117138ec9c6a06cfb74f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.