SOURCES SOUGHT
56 -- Repair Flightline Vehicle Gates
- Notice Date
- 9/12/2019
- Notice Type
- Sources Sought
- NAICS
- 332323
— Ornamental and Architectural Metal Work Manufacturing
- Contracting Office
- Department of the Army, National Guard Bureau, USPFO AL 117 MSC, 5401 E LAKE BLVD, BIRMINGHAM, Alabama, 35217-3595, United States
- ZIP Code
- 35217-3595
- Solicitation Number
- BRKR192010
- Archive Date
- 10/2/2019
- Point of Contact
- Jeffrey A. Farmer, Phone: 2057142347, William K. Hall, Phone: 2057142248
- E-Mail Address
-
jeffrey.farmer.2@us.af.mil, william.k.hall14.mil@mail.mil
(jeffrey.farmer.2@us.af.mil, william.k.hall14.mil@mail.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- STATEMENT OF WORK REPAIR FLIGHTLINE VEHICLE GATES 138 & 40 (AGE) SRM PN BRKR 192010 BIRMINGHAM IAP (ANG) ALABAMA 6 Sep 2019 SUMMARY OF WORK PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and General Requirements (if any) apply to the work specified in this section. 1.2 DESCRIPTION OF WORK A. This project provides for the repair of two gate systems located at buildings 138 and 40 (AGE) the 117ARW Birmingham, AL as described in attached plans. B. Provide for traffic and personnel safety at all times as base personnel work is in progress over nights, weekends, etc. 1.3 CONTRACT RESPONSIBILITIES A. The work is one contract bid package that will be contracted directly with the CONTRACTING OFFICER. B. Responsibilities of CONTRACTOR: 1. Except as specifically noted, provide and pay for: a) Labor, materials, and equipment. b) Tools, construction equipment and machinery. c) Other facilities and services necessary for proper execution and completion of work (locating and flagging underground utilities, etc.) d) Independent testing lab to do all materials and quality control testing. e) “Provide” means to furnish and install, complete and ready for operation. 2. Give required notices. 3. Comply with codes, ordinances, rules and regulations, orders and other legal requirements of public authorities which bear on performance of work. 4. Promptly submit written notice to CONTRACTING OFFICER of observed variance of contract documents from legal requirements. a) Assume responsibility for work to be contrary to such requirements, without notice. b) Appropriate modifications to Contract Documents will adjust changes necessary due to legal requirements. 5. Enforce strict discipline and good order among employees. Do not employ on work: a) Unfit persons. b) Persons not skilled on assigned tasks. 6. Furnish all submittals (including shop drawings, catalog cuts, brochures, test reports, progress schedules, estimates and general correspondence) promptly and on time to be approved before starting the work for which submittals are required. C. Responsibilities of CONTRACTING OFFICER: 1. CONTRACTING OFFICER to review materials testing lab qualifications submitted by the CONTRACTOR. 2. Construction Drawings. 1.4 CONTRACTOR USE OF PREMISES A. Confine operations at site to areas permitted by: 1. Law 2. Ordinances 3. Permits 4. Contract Documents 5. Existing Staging Areas 6. Where directed by CONTRACTING OFFICER. B. Do not unreasonable encumber site with materials or equipment. C. Assume full responsibility for protection and safekeeping of products stored on premises. D. Move any stored products which interfere with operations of CONTRACTING OFFICER or other CONTRACTORS engaged in work for the CONTRACTING OFFICER. E. Use of Site: Government will occupy the site during construction. Coordinate so that the least amount of disruption is caused, that traffic and personnel safety is maintain. F. CLEANLINESS IS THE ESSENCE OF QUALITY. Keep site clean. Remove waste material from the site weekly. Failure to comply will result in notice to clean site given by CONTRACTING OFFICER; if not cleaned within twelve (12) hours from time of notice, the CONTRACTING OFFICER will clean the site and charge the CONTRACTOR $100.00/hour for this work. 1.5 SUBMITTALS A. Approval for all materials must be given before installation. B. No work can be started until such work has been discussed and reviewed by the CONTRACTING OFFICER C. Test reports shall be checked by the CONTRACTING OFFICER to insure compliance with the Specifications. 1. Any deviations will be made known to the CONTRACTOR and CONTRACTING OFFICER. 2. It is the CONTRACTOR’S responsibility to achieve compliance with the Specifications. 1.6 ITEMS OF WORK- NOT TO BE USED FOR BIDDING PURPOSES!!! CostWorks 2019 -Repair Flightline Vehicle Gates- BRKR192010 Qty Description Unit 1 Provide New 38' Gate Ea 1 Install 38' cantilever gate- B138 Ea 4 Install 4 steel gate rollers-B138 Ea 1 Provide New Gate Operator-B138 Ea 1 Install Gate Operator-B138 Ea 1 Provide New 42' Gate Ea 1 Install 42' cantilever gate- B40 Ea 4 Install 4 steel gate rollers-B40 Ea 1 Provide New Gate Operator-B40 Ea 1 Install Gate Operator-B40 Ea 1 Testing and Warranty LS PART 2 PRODUCTS Gates, rollers, gate operators, installation, testing, warranty PART 3 EXECUTION AND PROJECT PLANS o Areas to be secured at end of the shift by some type of secure fencing at the end of each work day PART 4 PERFORMANCE PERIOD The performance period for this contract is 60 days. END OF DOCUMENT
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/f6c0798781c6f23e9b3238041d72e08b)
- Place of Performance
- Address: 117 ARW/MSC, 5401 East Lake Blvd, Birmingham, Alabama, 35217, United States
- Zip Code: 35217
- Zip Code: 35217
- Record
- SN05441785-W 20190914/190912230952-f6c0798781c6f23e9b3238041d72e08b (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |