SOLICITATION NOTICE
Y -- HI ERFO FTNP HAVO 10(4), Seismic Damage Spot Repairs
- Notice Date
- 9/18/2019
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- 6982AF19B000020
- Point of Contact
- Jorey Deml, , ,
- E-Mail Address
-
cflacquisitions@dot.gov, cflacquisitions@dot.gov
(cflacquisitions@dot.gov, cflacquisitions@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. This project is located in Hawaii Volcanoes National Park, Hawaii County, Hawaii. The general scope of improvements is construction of approximately 12 sites damaged in a 2018 period of increased volcanic activity and frequent earthquakes. The general scope of improvements is construction of approximately 15 miles of a new multi-use trail described as follows: Approximately 12 Seismic Damage spot repairs. 1 single span pedestrian bridge approximately 26-30 feet long by 5 feet wide. Approximately 3,600 feet of Guardrail removal and replacement Approximately 1 location of rock scaling on Chain of Craters Road Removal of the existing park traffic counter and installation of a new traffic counter and induction loops at the Park Entrance Station. Repair of 1 historic stone masonry guardwall on Crater Rim Drive. The proposed construction work includes repair of seismic damage through installation of compacted riprap fill and special rock embankment to plug voids. Following repair of the void subgrade the project will include linear grading, aggregate base, asphalt concrete pavement, and pavement markings to restore the roadway to pre earthquake conditions. The project is located on National Park Service lands. The contractor will need to take care to insure no disturbance to the land adjacent to the construction limits. Also, the contractor must utilize machinery with a maximum width of 48 inches, i.e. mini dozers, mini excavators and mini crawler carriers for repair of the paved trail segments identified. SIGNIFICANT QUANTITIES (Schedule A): The Base Schedule A includes seismic damage spot repairs at approximately 9 locations throughout Hawaii Volcanoes National Park that are covered under the ERFO program. Principal work for Option X includes seismic damage spot repairs at one location, removal and replacement of guardrail on chain of craters road, repairing and repointing the guardwall on crater rim drive down, rock scaling one location on chain of craters Road, and Post and Cable installation. Principal work items on Option Y include repaving of Water Tank Road. Principal work items on Option Z includes the removal and installation of a Traffic Detector System. Summary of Quantities: 20303-1600 Removal of Asphalt Pavement: 610 SQYD 25105-0100 Keyed Riprap, Method A, Class 3: 910 CUYD 25201-0000 Special Rock Embankment: 260 CUYD 30402-1000 Full Depth Reclamation, Method 1: 5,250 SQYD 40301-0100 Asphalt Concrete Pavement, Type 1: 1200 TON 41801-1000 Asphalt Concrete Pavement Patch, Type 1: 580 TON 61701-4550 Guardrail System MGS, Type 2, Class A Wood Posts: 3,725 LNFT 63602-6000 System Installation, Traffic Detector System: 1 EACH Along with associated traffic control and equipment/flagging, soil erosion control, and survey and staking. ENGINEER’S ESTIMATE: Range is from approximately $3,000,000 to $5,000,000. CONSTRUCTION DURATION: Tentative construction duration is approximately 3 months with a start date approximately January 15 th, 2020 to April 7, 2020. ADDITIONAL INFORMATION FOR NOTICE Anticipated advertisement in 10/03/2019 Anticipated bid opening in 11/05/2019 Anticipated Award in 11/19/2019 Anticipated Site Visit Mid-October, details will be provided in the solicitation. Due to seasonal restrictions, on-site construction typically cannot occur until January. A few sites may be available for work in December, but high holiday visitation will affect access.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/6982AF19B000020/listing.html)
- Place of Performance
- Address: Hawai'i Volcanoes National Park, Hawaii County, Hawaii, United States, United States
- Record
- SN05449665-W 20190920/190918231107-a137e74a3c7517b6c2ebda4a128300a7 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |