AWARD
Z -- Bldg. 404 Directors Office Renovation, KAFB
- Notice Date
- 9/23/2019
- Notice Type
- Award Notice
- Contracting Office
- Department of the Army, US Army Corps of Engineers, USACE District, Albuquerque, Attn: CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, New Mexico, 87109-3435, United States
- ZIP Code
- 87109-3435
- Solicitation Number
- W912PP19Q0084
- Archive Date
- 10/8/2019
- Point of Contact
- Glenda D. Kohlieber, Phone: 5756524135
- E-Mail Address
-
glenda.d.kohlieber@usace.army.mil
(glenda.d.kohlieber@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912PP19P0060
- Award Date
- 9/23/2019
- Awardee
- ALMS Limited Conpany, 11 ESPEJO AVE, MORIARTY, New Mexico 87035, United States
- Award Amount
- 177,562.63
- Line Number
- 0001
- Description
- This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 404 Renovation. The work shall include the following requirements as listed. 2. SPECIFIC REQUIREMENTS: a. Northwest Corridor requires the following modification: Construction: 1.Provide and install new split Dutch Door. (Labeled 1 on drawing) b. Hallway outside Director's Office. Demo: 1. Demo existing carpet. 2. Demo existing cove base. Construction: 1. Provide & install new carpet squares. 2. Provide & install new cove base. c. Director's Office requires the following modification: Demo: 1. Demo existing carpet. 2. Demo ceiling tiles. Construction: 3. Build new walls as per the drawing provided. Tape, texture, & paint walls. (Paint color Rainer White) 4. Patch & paint all walls. 5. Provide & install insulation in walls built for sound proofing. 6. Provide & install 2 door frames as per drawing. 7. Provide & install 3 solid wood core doors. 8. Provide & install Schlage locks on all doors. 9. Prep & paint back exit door. 10. Provide and install new double storefront, brushed aluminum, install all required door hardware. Storefront shall be no locking both doors will have the ability to swing in both directions. This door will need to lock..... 11. Provide & install new carpet squares, prep floor as required. 12. Provide & install new ceiling tiles, 2' x 4' & ceiling grid. 13. Provide backing for mounting bracket in SES office. 14. Install government provided monitor bracket in SES office. 15. Provide & install new window treatments. 16. Remove wainscot on east wall/patch & paint wall to match rest of office. 17. Window frames and wood trim. Either re-finish natural or paint. Electrical: Demo: 1. Remove all can lights. 2. Remove 2'x4' lighting. Save to reuse. 3. Remove all ceiling speakers. 4. Remove all fiber/copper/Cat cable to switches. Construction: 1. Provide electrical outlets on new walls built and existing walls as per drawing. 2. Provide electrical outlet for new monitor bracket in SES office. 3. Provide light switches for each new room and office suite. 4. Install new 2'x4' lighting configuration for new offices and floor plan. 5. Provide & Install Qt Active Emitter System. 6. Provide & install new CAT6 cable, locations marked on drawing. 7. Provide & install new copper phone lines/NIPR, locations marked on drawing. 8. Provide & install Fiber lines, locations marked on drawing. HVAC: 1. Demo old supply & return diffusers. 2. Provide & install new supply & return diffusers. 3. Reconfigure supply & return air flow to provide for new office configurations. 4. Ensure HVAC controls are located in accessible location. 5. Test & balance HVAC system.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP19P0060.html)
- Record
- SN05454326-W 20190925/190923230713-c0dcec5df240b36e4d0fac9421f989f1 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)