Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 25, 2019 FBO #6513
MODIFICATION

Y -- CA FLAP NEV 40(1) Donner Pass Road - Solicitation 1

Notice Date
9/23/2019
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
6982AF19B000002
 
Response Due
10/24/2019 2:00:00 PM
 
Point of Contact
Ryan Phillips,
 
E-Mail Address
CFLAcquisitions@dot.gov
(CFLAcquisitions@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
Pavement Report Hydraulics Report Geotech Report Cross Sections Plans 6982AF19B000002 THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS. PROJECT NUMBER : CA FLAP NEV 40(1) PROJECT NAME : Donner Pass Road PROJECT DESCRIPTION : The project is located just west of Truckee, California and will rehabilitate the existing pavement and widen shoulders for bike lanes on 6.54 miles of Donner Pass Road from I-80 Exit 174 in Soda Springs, CA to the Truckee City limits. Selected pullouts will also be paved and improvements include drainage, signing, striping, and guardrail. The proposed typical section is a 22 foot traveled way with 4 foot paved shoulders serving as Class II bike lanes. The bike lanes will be on the uphill direction only, east of Donner Pass. The bike lanes will be in both directions, west Donner Pass. Work will not be conducted on Rainbow Bridge. The elevation of Donner Pass is 7,056 feet. SIGNIFICANT QUANTITIES (Schedule A): Roadway Excavation = 7,500 CY Rock Excavation = 195 CY Aggregate Base = 12,000 CY Asphalt Pavement = 20,000 TONS Guardrail = 6,000 LF Erosion Control = LPSM Traffic Control = LPSM COST RANGE : Schedule A: $10M to $14M CONSTRUCTION DURATION: Spring 2020 to Fall 2021 ADDITIONAL INFORMATION: Anticipated advertisement in late winter 2019 Anticipated bid opening in late winter to early spring 2020 Anticipated Award in late winter to early spring 2020 Anticipated Notice to Proceed in spring 2020 Due to weather restrictions, on-site construction typically cannot occur until after May. Night work with full closures may be permitted east of Donner Pass. 1-lane closures, with maximum 10 minute delays, will be permitted throughout the project.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/6982AF19B000002/listing.html)
 
Place of Performance
Address: Tahoe National Forest, California, United States
 
Record
SN05455281-W 20190925/190923231045-469d3641aac60dc7d7d00c8f82db047b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.