MODIFICATION
Y -- CA FLAP NEV 40(1) Donner Pass Road - Solicitation 1
- Notice Date
- 9/23/2019
- Notice Type
- Modification/Amendment
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- 6982AF19B000002
- Response Due
- 10/24/2019 2:00:00 PM
- Point of Contact
- Ryan Phillips,
- E-Mail Address
-
CFLAcquisitions@dot.gov
(CFLAcquisitions@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- Pavement Report Hydraulics Report Geotech Report Cross Sections Plans 6982AF19B000002 THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS. PROJECT NUMBER : CA FLAP NEV 40(1) PROJECT NAME : Donner Pass Road PROJECT DESCRIPTION : The project is located just west of Truckee, California and will rehabilitate the existing pavement and widen shoulders for bike lanes on 6.54 miles of Donner Pass Road from I-80 Exit 174 in Soda Springs, CA to the Truckee City limits. Selected pullouts will also be paved and improvements include drainage, signing, striping, and guardrail. The proposed typical section is a 22 foot traveled way with 4 foot paved shoulders serving as Class II bike lanes. The bike lanes will be on the uphill direction only, east of Donner Pass. The bike lanes will be in both directions, west Donner Pass. Work will not be conducted on Rainbow Bridge. The elevation of Donner Pass is 7,056 feet. SIGNIFICANT QUANTITIES (Schedule A): Roadway Excavation = 7,500 CY Rock Excavation = 195 CY Aggregate Base = 12,000 CY Asphalt Pavement = 20,000 TONS Guardrail = 6,000 LF Erosion Control = LPSM Traffic Control = LPSM COST RANGE : Schedule A: $10M to $14M CONSTRUCTION DURATION: Spring 2020 to Fall 2021 ADDITIONAL INFORMATION: Anticipated advertisement in late winter 2019 Anticipated bid opening in late winter to early spring 2020 Anticipated Award in late winter to early spring 2020 Anticipated Notice to Proceed in spring 2020 Due to weather restrictions, on-site construction typically cannot occur until after May. Night work with full closures may be permitted east of Donner Pass. 1-lane closures, with maximum 10 minute delays, will be permitted throughout the project.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/6982AF19B000002/listing.html)
- Place of Performance
- Address: Tahoe National Forest, California, United States
- Record
- SN05455281-W 20190925/190923231045-469d3641aac60dc7d7d00c8f82db047b (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |