SOLICITATION NOTICE

Y -- AZ FTNP PEFO 10(7) Main Park Road

Notice Date
9/25/2019
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
6982AF20B000003
 
Point of Contact
Sheri Walsh, , Leslie N. Karsten,
 
E-Mail Address
CFLContracts@dot.gov, CFLAcquisitions@dot.gov
(CFLContracts@dot.gov, CFLAcquisitions@dot.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE. THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT NAME: AZ FTNP PEFO 10(7) Main Park Road PROJECT DESCRIPTION: This project in includes reconstruction of 14.52 miles of the Main Park road, the installation of multi-cell box culverts in three different locations, concrete curb, and installation of 120 culverts located within Petrified Forest National Park. The major work elements include cold recycle asphalt base course using the existing pavement, subgrade preparation, finish grading, asphalt concrete paving, concrete curb, replacement of CMP culverts, and riprap placement. SIGNIFICANT QUANTITIES: Significant Items for Schedule A Include: 74,000 SQYD of cold in-place recycled asphalt base course 6” depth, 9,800 TONS of hot asphalt concrete paving, 810 LNFT of 24 inch of Dual wall HDPE culvert, 235 of LNFT 36 inch of Dual wall HDPE culvert, 600 LNFT of 24 inch culvert pipe lining, 170 LNFT of 8 feet span by 3 feet rise precast reinforced concrete box culvert, 600 CUYD of roadway excavation, 6,000 CUYD of sub excavation, 2,290 LNFT of 12 inch colored concrete curb, and 350 LNFT of Guardrail system MGS, type 2 with steel posts and terminal sections. Significant Items for Option X Include: 87,000 SQYD of cold in-place recycled asphalt base course 6” depth, 10,500 TONS of hot asphalt concrete paving, 900 LNFT of 24 inch of Dual wall HDPE culvert, 82 LNFT of 36 inch of Dual wall HDPE culvert, 1,800 LNFT of 24 inch culvert pipe lining, 240 LNFT of 36 inch culvert pipe lining, 900 CUYD of roadway excavation, 4,500 CUYD of sub excavation, and 7,000 LNFT of 12 inch colored concrete curb. Significant Items for Option Y Include: 54,000 SQYD of cold in-place recycled asphalt base course 6” depth, 8,700 TONS of hot asphalt concrete paving, 800 LNFT of 24 inch of Dual wall HDPE culvert, 50 LNFT of 36 inch of Dual wall HDPE culvert, 330 LNFT of 24 inch culvert pipe lining, 16,500 CUYD of sub excavation, and 480 LNFT of 12 inch colored concrete curb. COST RANGE: Estimated total cost for Schedule A, Option X, and Option Y is $14,000,000 to $19,000,000. CONSTRUCTION DURATION: November, 2019 through July, 2020. ADDITIONAL INFORMATION: Anticipated advertisement in October, 2019. Anticipated bid opening in November, 2019. Anticipated award in November, 2019.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/6982AF20B000003/listing.html)
 
Place of Performance
Address: Petrified Forest National Park, Arizona, United States
 
Record
SN05458004-W 20190927/190925230740-d5215ef70e4f061144d98029a755e4ad (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.