AWARD
Y -- Consolidated Squadron Operations Facility
- Notice Date
- 9/26/2019
- Notice Type
- Award Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- Department of the Army, US Army Corps of Engineers, USACE Middle East District, Attn: CETAC-PD-CT, 201 Prince Frederick Drive, Winchester, Virginia, 22602-5000, United States
- ZIP Code
- 22602-5000
- Solicitation Number
- W912ER19R0005
- Archive Date
- 10/11/2019
- Point of Contact
- Karin H. Carroll, Phone: 5406653669, Jesse A. Hobbs, Phone: 5406654045
- E-Mail Address
-
Karin.H.Carroll@usace.army.mil, jesse.a.hobbs@usace.army.mil
(Karin.H.Carroll@usace.army.mil, jesse.a.hobbs@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912ER19C0016
- Award Date
- 9/26/2019
- Awardee
- MVL USA, INC, 3811 SHADOW TRACE CIRCLE<br />, HOUSTON, Texas 770825637, United States
- Award Amount
- $13,890,460.00
- Line Number
- 0001,0002,0002AA,0002AB,0003,0003AA,0003AB,0004,0004AA,0004AB,0004AC,0004AD,0004AE,0004AF,0004AG,0004AH,0005,0006,0007,0008,0009
- Description
- The U.S. Army Corps of Engineers (USACE), Transatlantic Middle East District (TAM) Awarded the Design-Bid-Build (D-B-B) construction for the Consolidated Squadron Operations Facility. This project will be constructed within the Al Udeid Air Base in State of Qatar. A single firm fixed price contract is awarded to MVL USA Inc. The scope of work for this project consists of the construction of a single story squadron operations facility at Al Udeid Air Base. This administrative facility will house six rotational flying squadrons and has an operational need for adequate space in planning, briefing and supporting operational personnel. The complete technical description of the scope of work is depicted on the drawings and within the specifications included in this contract. The project will provide an information security facility, secure room, or otherwise known as an "open storage area" (requiring IDS, access control, construction standards, telecommunications, etc.). The Project may have several options such as: construction of Air Cooled Chilled Water HVAC System, associated electrical and plumbing systems, equipment sunshade (in lieu of direct expansion air conditioning units for M403/M506, construction of parking sunshades on first row of parking spaces, asphalt pavement (in lieu of aggregate), pavement marking for perpendicular parking stall, concrete wheel-stop, hatched markings, installation of heavy duty concrete pavement for buses, and a thickened asphalt edge, installation of a 48-hour capacity potable water storage tank (in lieu of 24-hour capacity), installation of a pre-action wet sprinkler systems in the Elec/Tele/Server rooms. Work shall include civil, geotechnical, architectural, structural, mechanical, plumbing, electrical, communications and fire protection system design components, the preparation of construction documents for review and approval, and the subsequent construction indicated on those drawings resulting in fully functional medical administrative facility and furnishings warehouse. Supporting infrastructure is part of the scope that includes general grading/drainage, roads, secondary electrical power distribution from the transformer to the building, water, and communications duct banks. Set Aside: None
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA78/W912ER19R0005/listing.html)
- Record
- SN05459813-W 20190928/190926230944-0af9995d4b683e47abe96cfd9d283dfc (fbodaily.com)