Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 02, 2019 FBO #6520
AWARD

D -- Raven Rock Mountain Complex Delta V

Notice Date
9/30/2019
 
Notice Type
Award Notice
 
NAICS
541330 — Engineering Services
 
Contracting Office
Other Defense Agencies, Washington Headquarters Services, WHS, Acquisition Directorate, 4800 Mark Center Drive, Suite 09F09, Arlington, Virginia, 22350-3400, United States
 
ZIP Code
22350-3400
 
Solicitation Number
HQ003419R0197
 
Archive Date
10/12/2019
 
Point of Contact
Lorraine E. Wells, Phone: 7035451569
 
E-Mail Address
lorraine.e.wells.ctr@mail.mil
(lorraine.e.wells.ctr@mail.mil)
 
Small Business Set-Aside
N/A
 
Award Number
HQ003419C0186
 
Award Date
9/27/2019
 
Awardee
Process HVAC Solutions, LLC, 102 Commerce Blvd, Suite 300, Lawrence, Pennsylvania 15055, United States
 
Award Amount
$420,652.00
 
Line Number
0001 - Phase 1 - Lifecycle of Delta V system and 0002 - Phase 2 - Integrate Existing Control Poin
 
Description
Statement of Objectives: 1. Requiring Agency- Raven Rock Mountain Complex (RRMC) 2.Description of Product/Services- RRMC has the requirement to lifecycle the current Delta V System and integrate existing control points. Phase 1 - Lifecycle of current Delta V System •Upgrade all software on existing controllers and replacement of hardware oProvide (2) new servers and (2) workstations with upgraded software oAll upgrades shall include Microsoft excel and all necessary licensing •Provide engineering and oversite during upgrade oInstallation of software on to new system oMigration of database and current configurations oProvide all documentation for any changes made to the system oAll other necessary personnel support for upgrade •Provide necessary training for new equipment Phase 2 - Integrate Existing Control Points •Use existing and or install new controller and Input/Output (I/O) boards oSupport 170 Digital Inputs (DI) and 31 Digital Output (DO) points oProvide all additional licenses as needed oProvide all other necessary equipment to support integration •Provide all logic required to control the existing points with the same functionality. oThis should include the capability of time stamp event log •Provide all graphics of new point oThis should include overviews and down to the point graphic interface. •Provide engineering and oversite during upgrade •Provide necessary training for new integration and modifications •Provide updated drawings of integration work
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/ODA/WHS/REF/Awards/HQ003419C0186.html)
 
Record
SN05463943-W 20191002/190930230926-9afcf8107f58b2279d5bb7ada6c33682 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.