DOCUMENT
H -- Boiler Plant Safety Device Testing and Emergency Repair Service Combine Synopsis - Attachment
- Notice Date
- 10/24/2019
- Notice Type
- Attachment
- NAICS
- 238220
— Plumbing, Heating, and Air-Conditioning Contractors
- Contracting Office
- Department of Veterans Affairs;Network Contracting Office 2;James J. Peters VA Medical Center;130 West Kingsbridge Road;Bronx NY 10468-3904
- ZIP Code
- 10468-3904
- Solicitation Number
- 36C24220Q0057
- Response Due
- 11/7/2019
- Archive Date
- 12/7/2019
- Point of Contact
- Evelyn Peguero, Contract Specialist
- E-Mail Address
-
Evelyn.Peguero@va.gov
(Evelyn.Peguero@va.gov)
- Small Business Set-Aside
- N/A
- Description
- RFQ 36C24220Q0057 VHAPM Part 813.106-1/2 SAP: Soliciting Competition & Evaluation of Quotations/Offers Page 1 of 4 Original Date: 10/12/17 Revision 01 Date: 01/08/18 COMBINED SYNOPSIS/SOLICITATION FOR COMMERCIAL ITEMS General Information Document Type: Combined Solicitation/Synopsis Solicitation Number: 36C24220Q0057 Posted Date: 10/24/19 Original Response Date: 11/07/19 Current Response Date: 11/07/19 Product or Service Code: H344 Set Aside (SDVOSB/VOSB): VOSB NAICS Code: 238220 Contracting Office Address James J. Peters VAMC 130 W. Kingsbridge Rd. Bronx, NY 10468 Description This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation document will not be issued. This solicitation is a request for quotations RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2019-06 (eff. 10/10/19). The associated North American Industrial Classification System (NAICS) code for this procurement is 238220, with a small business size standard of $16.5 million. The New Jersey HealthCare System at Lyons VA 151 Knollcroft Rd. Lyons, NJ 07939 is seeking to purchase Boiler Plant Safety Device Testing, Calibration, Combustion Analysis and Emergency Repair Service. All interested companies shall provide quotation(s) for the following: Description/Specifications Statement of Work CONTRACT TITLE: Boiler Plant Safety Device Testing, Calibration, Combustion Analysis and Emergency Repair Service. BACKGROUND: The VANJ HealthCare System (VANJHCS) requires an annual service contract to calibrate all pressure gauges, boiler and plant controls and instrumentation (recorders and transmitters). Boiler Plant Safety Device maintenance, inspection, testing and calibration. Boiler Combustion / Emissions testing and tuning and Emergency Repair Service on nine (9) Cleaver Brooks Fire Tube Boilers and Auxiliary Equipment that provide steam to the East Orange and the Lyons VA Medical Center. Both VAMC s have a central boiler plant to provide steam for heating and air conditioning, domestic hot water, kitchens and sterilization. Boiler plant safety, reliability, efficiency and equipment longevity are paramount concerns of Veterans Affairs Medical Center (VAMC) management. Boilers are extremely dangerous if not maintained properly. Malfunctioning burners or controls can cause catastrophic events resulting in injuries and death as well as massive property damage. Inaccurate or inadequate data management and monitoring systems can fail to warn of unsafe or inefficient performance. Regular inspections, testing and calibration by expert technicians are an essential part of a program to address these concerns. This statement of work describes the requirements for the inspection, testing and calibration of the boiler plant burners, controls, instruments and safety devices by qualified technicians in accordance with VHA Directive 1810 and the VHA Boiler Safety Device Testing Manual (5th Edition). VHA Directive 1810 requires annual and semi-annual Boiler and associated plant safety device inspection, testing, calibration and semi-annual combustion / emissions adjustments / tuning, VHA Directive 1810 requires these services to be performed by a qualified professional third party that has documented knowledge and experience in the design and construction and VA s standards for construction and testing of safety devices. In addition, the individual shall have demonstrated experience in conducting equipment assessments and performing testing in compliance with the VA safety device testing manual on at least 5 sites within the past 3 years. OBJECTIVE: This service contract is an annual maintenance contract on the Boilers and associated plant equipment at the East Orange VA Medical Center and the Lyons VA Medical Center to meet the requirements for the inspection, testing, tuning and calibration of the boiler plant burners, controls, all instrumentation including pressure gauges, transmitters and safety devices by qualified technicians in accordance with VHA Directive 1810 and the VHA Boiler Safety Device Testing Manual (5th Edition). SCOPE OF WORK: The contractor will furnish all labor, materials, supplies, equipment and transportation necessary to accomplish the services contained within this contract. The selected contractor will perform annual and semi-annual calibration of all pressure gauges, boiler and plant controls, controllers, transmitters, recorders and all other instrumentation contained within the Boiler Plant IAW VA Directive 1810. The selected contractor will perform annual and semi-annual Boiler and Plant Safety Device testing on all nine (9) of the boilers and associated plant equipment at the VANJHCS Lyons and East Orange Campuses. Ensuring that all safety devices are plumbed correctly and in its correct place, safety device set point is correct, safety device activates at the correct set point and the safety device produces the required effect. Safety device identification and labeling including set point and normal operating range is to be determined and set prior to test. Calibration/test sticker shall be affixed to each equipment and device after completion of tests. The selected contractor will also perform semi-annual Boiler Combustion Emissions Tuning of all nine (9) of the boilers. All testing will be as specified in VHA Directive 1810 and the VHA Boiler Safety Device Testing Manual (4th Edition) and where not defined will be IAW good engineering and proven past practice accepted by industry standards and equipment manufactures. Estimated Period Of Performance: 11/15/19 11/14/20 WITH FOUR OPTION YEARS. The following Equipment is included in the annual service contract. VA NJ HealthCare System East Orange Campus: Boiler #1 Cleaver Brooks Model CB 200X-600 Serial# OLO88369 SWP 200 20700 lbs/hr Input 25,106,000 BTU/HR Nat Gas Boiler #2 Cleaver Brooks Model CB 200X-600 Serial# OLO88368 SWP 200 20700 lbs/hr Input 25,106,000 BTU/HR Nat Gas Boiler #3 Cleaver Brooks Model CB 200X-600 Serial# OLO88367 SWP 200 20700 lbs/hr Input 25,106,000 BTU/HR Nat Gas Boiler #4 Cleaver Brooks Model CB 200X-600 Serial# L99715 SWP 200 20700 lbs/hr Input 25,106,000 BTU/HR Nat Gas D.A. Tank Cleaver Brooks Model# BM-42 Serial# DG-5941 50,000 lbs/hr Condensate Tank Wendland Manuf. Corp NB-5452 Serial# 36616 VA NJ HealthCare System Lyons Campus: Boiler #1 Cleaver Brooks Model CB 200-700 Serial# OLO94344 SWP 200 20000 lbs/hr Input 29,290,000 BTU/HR Nat Gas 209 GPH Oil Boiler #2 Cleaver Brooks Model CB 200-700 Serial# L-90891 SWP 200 20000 lbs/hr Input 29,290,000 BTU/HR Nat Gas 209 GPH Oil Boiler #3 Cleaver Brooks Model CB 200-700 Serial# L-90892 SWP 200 20000 lbs/hr Input 29,290,000 BTU/HR Nat Gas 209 GPH Oil Boiler #4 Cleaver Brooks Model CB 200-700 Serial# L-90890 SWP 200 20000 lbs/hr Input 29,290,000 BTU/HR Nat Gas 209 GPH Oil Boiler #5 Cleaver Brooks Model CB 200-700 Serial# OLO94345 SWP 200 20000 lbs/hr Input 29,290,000 BTU/HR Nat Gas 209 GPH Oil D.A. Tank East Fabricators Serial# 12774 Vessel# NB 3807 Manufactures Rating 3400 Gal Design pressure 30 PSI Safety valve setting 15/20 PSI Shell thickness.3125 Condensate/Surge Tank East Fabricators Serial# 12783 Vessel# NB 3783 Manufactures Rating 3100 Gal Design pressure 25 PSI Vented 3 Line Semi-annual Boiler Safety Device Testing Inspections Perform the required semiannual maintenance specified by VHA Directive 1810 on Boiler Plant Safety Devices. The VHA Boiler Plant Safety Device Testing Manual (4th Edition) will be used as the only procedure to test all Boiler Safety Devices. All Boiler Safety Device Inspections must be scheduled with the COR. Boiler Safety Devices will be tested every 6 mths and must not interfere with Boiler cleanings and inspections. A detailed report of inspection for each safety device tested must be supplied to the COR. All failures must be immediately reported to the COR and the Boiler Plant Operator. Replace any device that fails and is not able to be repaired or calibrated following the guidelines of unscheduled maintenance. Any new device must be calibrated to its proper set point and tested. If a test procedure will not achieve the desired results due to a fault in the written test procedure or configuration of the device the contractor will devise a new procedure that will accomplish the same end results and submit the procedure to the COR for approval. The contractor will then be provided written direction on how to proceed. Inspection, Testing, and Calibration Requirements: Technicians shall provide all tools and labor necessary to perform inspection, tuning, testing, calibrating, and adjustments of burners and boiler and boiler plant controls as specified below. This shall be completed every 6 months in accordance with a schedule provided by VAMC. VAMC may extend the schedule for burners in limited service. Instrumentation, monitoring, and data management systems as listed below shall be calibrated every 6 months. Provide at least 2-weeks-notice to the Contracting Officer s Representative (COR) prior to performing the work. Work cannot be scheduled during heavy steam load periods. Only one boiler at a time can be out of service for the inspection, testing, and calibration procedures. Work must be conducted when the COR or his/her designate is available on site to monitor the work. The VA Medical Center (VAMC) will have the boilers that are to be serviced prepared for the technicians upon their scheduled arrival. This includes having the boilers fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner, and fuel train pressure gauges and thermometers calibrated; fuel meters in accurate operation; boiler steam flow, stack temperature, and flue gas oxygen instruments operating. The VAMC will comply with any other requirements of the test personnel that are considered reasonable by VAMC and have been presented in writing at least 2 weeks prior to the scheduled testing. The inspections, testing and calibrations shall comply with: The recommendations and requirements of VHA Boiler Plant Safety Devices Testing Manual, ( 4th Edition). The written recommendations of the equipment manufacturers. The requirements and recommendations of NFPA ® 85: Boiler and Combustion Systems Hazards Code including applicable appendices. Burner performance requirements from the burner manufacturer. A summary of the work is as follows: Review boiler plant log sheets. Review records that show combustion performance (flue gas oxygen and carbon monoxide). Perform overall visual inspection of systems. Verify that systems comply with referenced codes and VAMC requirements stated in this contract. Test and record the operation and set points of all burner/boiler safety interlock devices. Verify that the set points and operating points are within approximately 20 percent of normal operating parameters. Make adjustments as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation. Operate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, nitrous oxide, where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output. Compare the combustion performance data with VAMC requirements and previous readings. If necessary, make adjustments to the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data. Verify accuracy of instrumentation. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, and code approval. Calibrate all instruments that are not within manufacturer specifications for accuracy. Immediately inform the COR of any recommended repairs or modifications. All interlocks and safety devices to be inspected and tested on each boiler/burner/equipment are contained in the VHA Boiler Plant Safety Devices Testing Manual, ( 4th Edition), along with testing procedures. Required burner performance (natural gas and fuel oil): Turndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification). Achieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates. Maximum carbon monoxide: 200 parts per million (ppm). Maximum nitrous oxide: refer to original burner specification. Flue gas oxygen: 2.5-4.2 percent (Up to 5.2 percent at loads below 40 percent of maximum steam output, no upper limit at minimum firing rate, oxygen can be one percentage point higher on oil firing on single-point positioning systems). Flue gas oxygen (low excess air burners): 1.0-2.0 percent (Up to 2.5 percent at loads below 40 percent of maximum steam output, no upper limit at minimum firing rate: oxygen can be one percentage point higher on oil firing on single point positioning systems). No visible smoke. Flames shall be stable with no pulsations, shall be retained near burner, no blow off or flashbacks, no constant flame impingement on refractory. List of instrumentation and controls to be inspected and calibrated: Steam flow transmitters (all). Steam flow recorders/computer readout. Flue gas oxygen sampling, analyzing, and recorder/computer readout. Boiler and economizer stack temperature transmitters and recorder/computer readout. Master steam pressure and combustion controllers. Boiler water level controllers. Feedwater deaerator and condensate storage tank water level controllers including overflow. All pressure and temperature devices, sensors and transmitters. All signal processing and readout devices. NOTE: Prior to the semi-annual and annual services, contractor shall ensure the following is performed: Verify the following boiler safety devices are in the correct locations and plumbed correctly. Verify the safety device set points are correct in relation to normal operating values. Verify the safety device activates and resets at the correct set points. Verify the safety device produces the required flame safeguard shutdown and audible/ visual annunciation. The following safety devices will be tested: High Water Alarm on Condensate Tank (HWACT) Low Water Alarm on Condensate Tank (LWACT) High Water Alarm on Deaerator Tank (HWADT) Low Water Alarm on Deaerator Tank (LWADT) Deaerator Overflow Drain System (DAODS) Deaerator Safety Valve (DASV) Safety Valve Following DA PRV (SVFPRV) Steam Safety Valve Following PRV (SVFPRV)-Other Liquid Relief Valve on Oil Pump Set (LRVOPS) Liquid Relief Valve on Economizer (LRVE) Propane Pilot Backup System Carbon Monoxide and Combustible Gas Alarms in the Boiler Plant High Gas Pressure Alarm Outside Air Damper Interlock (OADI) Low Water Alarm and Cutoffs on Boiler (LWA/LWCO/ALWCO) High Water Alarm on Boiler (HWAB) Recycle and Non-Recycle Boiler Steam Pressure Limit Switches (RBSPLS & NRBPLS) Steam Safety Valves on Boiler (SVB) Low Fuel Gas Pressure Cutoff Switch (LFGPCS) High Fuel Gas Pressure Cutoff Switch (HFGPCS) Automatic Fuel Gas Shutoff Valves and Solenoid Vent Valve Seat Leakage (AFGSOV & AFGSVV) - Main Gas Automatic Pilot Fuel Gas Shutoff Valves and Solenoid Vent Valve Seat Leakage (APFGSOV & APFGSVV) - Pilot Line Proof of Closure on Automatic Fuel Shutoff Valves (POC-AFGSOV) -Natural Gas Flame Scanner-for main flame out (FSMFO) Flame Scanner Not Sensing Igniter Spark (FSNSIS) Igniter Timing (IT) Main Flame Ignition Timing (MFIT) Pre-Purge and Post-Purge Timing (PPT) Low-Fire Proving Switch (LFPS) Forced Draft Damper Wide-Open Pre-Purge Proving Switch (FDDWOPS) Combustion Air Pressure Switch (CAPS)-Constant Speed or Variable Speed Fan Purge Airflow Proving Switch (PAPS) Forced Draft Motor Interlock Switches (FDMIS) Outlet Stack Damper Position Interlock Switch (OSDPI) Furnace Pressure Interlock (FPI) Low Pilot Fuel Gas Pressure Cutoff Switch (LPFGPCS) Flue Gas Recirculation Damper Interlock (FGRDI) Low Flue Gas Oxygen Level Interlock (LFGOLI) Low Fuel Oil Pressure Cutoff Switch (LFOPCS) High Fuel Oil Pressure Cutoff Switch (HFOPCS) Low Atomizing Media Pressure Switch (LAMPS) Low Atomizing Media Differential Pressure Switch (LAMDPS) Low Atomizing Media Flow Switch (LAMFS) Automatic Fuel Oil Shutoff Valves (AFOSV) - for Seat Leakage Proof of Closure on Automatic Fuel Oil Shutoff Valves (POC-AFOSV) Oil Burner Position Switch (OBPS) Emergency Stop/Panic Buttons (ESPB) Unscheduled Maintenance: Unscheduled maintenance is defined as any problem/defect found during current repair or during annual or semi-annual preventive maintenance, testing, calibration, inspection or tuning that would require the contractor to perform further maintenance and/or replacement of parts. The contractor will provide to the COR a complete list of repairs and/or parts required for review and approval before any maintenance /repairs are made at the Lyons or East Orange campus. Report Requirements: Provide complete written report of the inspection fully describing all tests performed, all findings, and recommendations. At a minimum the following information will be delivered to the COR in a table (Excel or Word): The first column, labeled Function, did the device pass or fail. The second column, labeled Device, list the device number and description in accordance with the VHA Boiler Plant Safety Devices Testing Manual, (4th Edition). The third column, labeled Deficiencies-Recommendations. The fourth column, labeled Corrective Actions, lists any corrective actions taken during the inspection. The fifth column with the date tested. The sixth column with person performing the test. The seventh column will be for comments. Furnish report within 1 week of each facility inspection in Microsoft Word format by email to the COR. Provide hard copies of data sheets and flue gas analyzer strip printouts to the COR within 1 week of visit. All safety-related deficiencies shall be immediately reported to the COR, Boiler Plant Supervisor and/or Assistant Chief Engineer during the inspection visit. Semi-annual Boiler Tune Ups All nine Boilers must be tuned at least once every six months. A qualified person will be used to tune the boilers and a report of the results of the tuning will be submitted to the COR. The tuning performed will be on Natural Gas and on Fuel Oil. The Boilers will be tuned at a minimum of six points through the entire range of 0-100% Boiler Firing Rate. Qualifications/Certifications The contractor shall have electrical safety training to meet the requirements of NFPA 70e. The contractor and all of the individuals working on the project site shall have taken the OSHA Certified 10-hour construction safety course. Technicians shall have completed at least a 1 year of trade school and have 5 years of successful experience in this field. The experience shall be largely with institutional and industrial boiler plants similar in design to the VAMC plant. The VAMC facility manager/engineer may define and accept equivalent qualifications. Technicians shall demonstrate familiarity with and ready access to the current versions of the following references: National Fire Protection Association (NFPA) 85 Boiler and Combustion Systems Hazards Code VHA Boiler Plant Safety Device Testing Manual, 4th Edition Technicians shall be equipped with portable electronic flue gas analyzers and other test instruments necessary for the required tests and calibrations, all calibrated within 1 month of the site visits. At facilities with programmable digital controls, the technicians must be capable of programming the controls and have the appropriate hardware and software for this. Safety Regulations All applicable safety regulations shall be observed during all work of this contract. VA Police will issue identification badges to contractors, employees and subcontractors which must be worn at all times when on VA property Contractor shall keep the area cleaned daily and haul away all debris to a designated container The VA Safety Officer shall have full authority to see that the contractor obeys all safety rules and regulations relative to the fulfillment of this contract. Provide the necessary barricades/signage where required. Scheduling and Hours of Work All work in areas involved shall be scheduled with the VA Chief of Operations Supervisor. Work shall be scheduled for proper execution to completion of this contract. Hours of work. The work will be conducted during normal working hours 0800-1630 Monday Friday excluding Federal Holidays. The 10 holidays observed by the Federal Government, are New Years Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas or any other day specifically declared by the President of the United States to be a national holiday. From 1 October to 30 April emergency service shall be provided 24 hours, 7 days a week. During this period, corrective maintenance will be initiated by VANHCS Personnel by telephone to the service center, which must be acknowledged within 2 hours. A fully qualified service technician must be on-site within 8 hours of acknowledgement of the service call. The equipment shall be restored to full service within 48 hours of arriving on the job site, barring extenuating circumstances. Full service means that defective parts have been replaced with parts that meets or exceeds the manufactures original specifications and that the equipment meets or exceeds the manufactures original performance specifications. Delivery shall be provided date of award to 15-days BUT no later than 60 days after receipt of award of contract. Place of Performance Address: LYONS VA Address: East Orange VA Postal Code: 151 Knollcroft Rd. Lyons, NJ 07939 Postal Code: 385 Tremont Ave. East Orange, NJ 07018 Country: UNITED STATES Country: UNITED STATES Award shall be made to the quoter whose quotation offers the best value to the government, considering technical capability, past performance, and price. The government will evaluate information based on the following evaluation criteria: Technical capability - Contractor shall provide a maximum 10-page capability statement demonstrating their ability to meet all of the requirements of the SOW. Technical capability is defined as an offerors ability to satisfy the solicitation requirements, providing the highest quality service to the specified facility. (a) Proposed Team - The contractor shall provide the pertinent POCs for the prime contractor and all subcontractors for management and supervision. (b) Technical Experience the contractor shall provide documentation to support past experience performing requirements of similar scope and complexity. (2) Past performance - Contractor must provide three references for contract of similar scope and magnitude to be evaluated. The contractors Past Performance shall also be reviewed in PPIRs; Individuals with no past performance shall receive a neutral rating for this evaluation factor. (3) Price - The government will evaluate offers for award purposes based on the pricing for the total requirement. Offers for partial requirement will not be evaluated and will be deemed non-responsive upon receipt. The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html. The following solicitation provisions apply to this acquisition: FAR 52.212-1, Instructions to Offerors Commercial Items (OCT 2018) solicitation number for this requirement as 36C24220Q0057 Name, address and telephone number of offeror Technical description of services to be performed in accordance with the Statement of Work. This Technical description should address the requirement specifically. Capability statements that are merely an overview of what the contractor offers will be determined incomplete. Terms of any express warranty Price should be for all services detailed on the pricing schedule of this document. The pricing must be broken down in a manner that allows for price reasonableness to be determined. Failure to provide complete pricing will result in contractors package being determined to be incomplete. Acknowledgement of any solicitation amendments Past performance information A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. The following solicitation provisions apply to this acquisition: 52.204-7 System for Award Management (OCT 2018) 52.204-16 Commercial and Government Entity Code Reporting (JUL 2016) 52.217-5 Evaluation of Options (JUL 1990) 852.209-70 Organizational Conflicts of Interest (JAN 2008) FAR 52.212-3, Offerors Representations and Certifications Commercial Items (OCT 2018) Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://www.sam.gov/portal in accordance with FAR 52.212-3, Offerors Representations and Certifications Commercial Items. If paragraph (j) of the provision is applicable, a written submission is required. The following contract clauses apply to this acquisition: FAR 52.212-4, Contract Terms and Conditions Commercial Items October 2018 The following clauses are incorporated into Addendum to FAR 52.212-4, 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-18 Commercial and Government Entity Code Maintenance (JUL 2016) 52.217-8 Option to Extend Services (NOV 1999) 52.217-9 Option to Extend the Term of the Contract (MAR 2000) 52.219-14 Limitations on Subcontracting (DEVIATION 2019-01) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) 852.203-70 Commercial Advertising (MAY 2008) 852.219-11 VA Notice of Total Veteran-Owned Small Business Set-Aside (JUL 2019) 852.219-74 Limitations on Subcontracting Monitoring and Compliance (JUL 2018) (DEVIATION) 852.232-72 Electronic Submission Of Payment Requests (NOV 2018) 852.270-1 Representatives of Contracting Officers (JAN 2008) FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders October 2019 The following subparagraphs of FAR 52.212-5 are applicable: 52.209-6 Protecting the Government s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) 52.222-3 Convict Labor (June 2003) 52.222-19 Child Labor--Cooperation with Authorities and Remedies (Oct 2019) 52.222-36 Equal Opportunity for Workers with Disabilities (Jul 2014) 52.222-50 Combating Trafficking in Persons (Jan 2019) 52.232-33 Payment by Electronic Funds Transfer System for Award Management (OCT 2018) 52.222-41 Service Contract Labor Standards (Aug 2018) 52.222-55 Minimum Wages Under Executive Order 13658 (Dec 2015) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017) All quoters shall submit the following: one copy of technical capability and pricing. All quotations shall be sent to Evelyn Peguero at Evelyn.Peguero@va.gov This is an open market Total Veteran Owned Small Business Set-Aside for Boiler Plant Safety Device Testing, Calibration, Combustion Analysis and Emergency Repair Service as defined herein. The government intends to award a or contract as a result of this combined synopsis/solicitation that will include the terms and conditions set forth herein. To facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows: "The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition." OR "The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:" Quoter shall list exception(s) and rationale for the exception(s). Submission shall be received not later than 3:00pm on 11/07/19 at Evelyn.Peguero@va.gov. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). Faxed or postal mailed quotes will NOT be accepted. Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the contract specialist Evelyn Peguero at Evelyn.Peguero@va.gov. Point of Contact Evelyn Peguero, Contract Specialist 914-737-4400 x2149 Evelyn.Peguero@VA.gov See attached document: Service Contract Act WD # 2015-4210.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/BroVANAP/VAMD/36C24220Q0057/listing.html)
- Document(s)
- Attachment
- File Name: 36C24220Q0057 36C24220Q0057.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=5200946&FileName=36C24220Q0057-000.docx)
- Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=5200946&FileName=36C24220Q0057-000.docx
- File Name: 36C24220Q0057 Wage determination.pdf (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=5200947&FileName=36C24220Q0057-001.pdf)
- Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=5200947&FileName=36C24220Q0057-001.pdf
- Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
- File Name: 36C24220Q0057 36C24220Q0057.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=5200946&FileName=36C24220Q0057-000.docx)
- Place of Performance
- Address: NJ Health Care System;Lyons VA;151 Knollcroft RD;Lyons, NJ
- Zip Code: 07939
- Zip Code: 07939
- Record
- SN05481858-W 20191026/191024230710-af97afa7995b59e4c7cf28841d25ccfa (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |