Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 24, 2019 SAM #6569
SOLICITATION NOTICE

Y -- CA FLAP CR 109(1), Sir Francis Drake Blvd. and Point Reyes Roads

Notice Date
11/22/2019 4:06:29 PM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF19B000023
 
Response Due
12/11/2019 1:00:00 PM
 
Archive Date
12/26/2019
 
Point of Contact
Ryan Phillips
 
E-Mail Address
CFLAcquisitions@dot.gov
(CFLAcquisitions@dot.gov)
 
Description
CA FLAP CR109(1) & FTNP PORE 10(4), 200(1), & 201(1) Sir Francis Drake Boulevard & Limantour, Lighthouse, and Chimney Rock Roads & Pavement PreservationPROJECT DETAILS:This project will consist of roadway resurfacing, restoration, rehabilitation, and reconstruction of approximately 12.9 miles of roadway and pavement preservation of approximately 20.9 miles of roadway within Point Reyes National Seashore (PRNS) in Marin County, California. Rehabilitation and reconstruction is included on 12.0 miles of Sir Francis Drake Boulevard (SFDB) from Pierce Point Road to Chimney Rock/Lighthouse Roads (including bridge construction at Schooner Creek), and on 0.9 miles of Chimney Rock Road. Pavement preservation is included on 7.5 miles of Limantour Road, 1.5 mile of Lighthouse Road and 11.9 miles of various roadways and parking areas within PRNS. Also included is construction of a 2-acre wetland restoration site at the existing Drakes Beach parking lot. The estimated price range is over $30,000,000. Principle work items include 45,000 tons of superpave hot asphalt concrete pavement, 40,000 cubic yards of roadway excavation and embankment, 13,000 cubic yards of subexcavation, 25,000 tons of roadway aggregate, 145,000 square yards of pulverizing, 260,000 square yards of asphalt surface treatment (chipseal), and 30,000 square yards of micro-surfacing. Additional work includes replacement of the two existing 84-inch culverts at the Schooner Creek crossing of SFDB with a 56-foot-long prestressed concrete voided slab bridge including 80 cubic yards of structural concrete and 350 linear feet of 30-inch drilled shafts. Additional drainage improvements including culvert cleaning, lining and replacement, reconstruction and rehabilitation of multiple parking areas, 20,000 linear feet of asphalt curb, 5,000 square yards of asphalt paved ditch, and 4,500 linear feet of concrete curb and gutter. All of the work is occurring in cultural and natural resource sensitive areas. Great attention to detail will be required in achieving customer satisfaction in areas of road construction, traffic control and timely completion of work.This is a full and open solcitiation.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/4cd905c186444735ab9f1fc0dbe7acbf/view)
 
Place of Performance
Address: Point Reyes National Seashore, CA, USA
Country: USA
 
Record
SN05501700-F 20191124/191122230249 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.