Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 29, 2019 SAM #6574
SOLICITATION NOTICE

Y -- Wild Rice River Structure

Notice Date
11/27/2019 3:42:45 PM
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W07V ENDIST ST PAUL SAINT PAUL MN 55101-1678 USA
 
ZIP Code
55101-1678
 
Solicitation Number
W912ES20C0001
 
Archive Date
12/31/2019
 
Point of Contact
Aragon Liebzeit , Contract Specialist , Phone: (651) 290-5418, Kevin P. Henricks, Contracting Officer, Phone: 6512905414
 
E-Mail Address
aragon.n.liebzeit@usace.army.mil, kevin.p.henricks@usace.army.mil
(aragon.n.liebzeit@usace.army.mil, kevin.p.henricks@usace.army.mil)
 
Award Number
W912ES20C0001
 
Award Date
11/27/2019
 
Awardee
AMES CONSTRUCTION, INC. 8794 MN USA
 
Award Amount
59448550.00
 
Description
The U.S. Army Corps of Engineers, St. Paul, Minnesota District has a requirement entitled: the Wild Rice River Structure. This work is part of the Fargo Moorhead Metro Area Flood Risk Management (FMM) Project. The work site is near Fargo, ND (Cass County).The work includes, but is not limited to all plant, labor, and materials to construct a gated water control structure, dam walls, a vehicle service bridge, stilling basin, pre-formed scour hole, approach apron, a slope protection slab and approach walls. The control structure contains two, forty foot wide tainter gates, a ten foot wide concrete pier between them and abutments on the east and west side of the dam. Full height dam embankments will be constructed to within approximately two hundred and sixty feet of the control structure. A combination of partial height dam embankment and dam walls will connect the control structure to the full height dam embankments. The dam wall footings will be at roughly the existing ground elevation. The abutments, stilling basin walls and upstream training walls of the control structure will retain embankment material up to the top of the dam wall footing elevation. There will be a one hundred and twenty-five foot long stilling basin with a dentated end sill and a twenty-foot deep pre-formed scour hole to dissipate energy. An eighty-five foot long concrete approach apron will be built on the up-river side of the structure. The project also includes a control building, access roads and approximately one thousand and nine hundred feet of engineered channel.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/06c57f8403ab454bab7121fcd5a87023/view)
 
Place of Performance
Address: 25700, ND 58108, USA
Zip Code: 58108
Country: USA
 
Record
SN05504684-F 20191129/191204040837 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.