SAMDAILY.US - ISSUE OF DECEMBER 05, 2019 SAM #6580
SOLICITATION NOTICE

Y -- CO FTNP ROMO 11(4) Beaver Meadows Road

Notice Date
12/3/2019 1:17:30 PM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF19B000022
 
Response Due
12/10/2019 1:00:00 PM
 
Archive Date
03/10/2020
 
Point of Contact
Leslie N. Karsten, Contract Specialist, Sheri Walsh, Contracting Officer
 
E-Mail Address
CFLContracts@dot.gov, CFLContracts@dot.gov
(CFLContracts@dot.gov, CFLContracts@dot.gov)
 
Description
THIS PROJECT IS ADVERTISED ON A FULL AND OPEN BASIS.THIS IS REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE AVAILABLE.PROJECT NUMBER: CO FTNP ROMO 11(4)PROJECT NAME: Beaver Meadows RoadPROJECT DESCRIPTION: This project provides 3R rehabilitation treatment for routes to include 4.85 miles of Beaver Meadows roadway within Rocky Mountain National Park. The project will also be lengthening and adding a FAST lane at Beaver Meadows Entrance Station which is approximately 1,400 feet. The project consists of pulverizing the existing asphalt for additional base, concrete curb, drainage improvements, and repaving with approximately 4” of asphalt. The project will grade side slopes due to additional pavement thickness along shoulders. Pullouts directly adjacent to the roadway will also be treated and repaved as part of the project.SIGNIFICANT QUANTITIES:Significant Items for Schedule A include: 250 LNFT of Standard Underdrain, 1.8 MILES of Full Depth Reclamation 8-Inch Depth of Existing Pavement, 10,750 TONS of Hot Asphalt Concrete Paving, 2,550 LNFT of 14-Inch Colored Concrete Curb and Gutter, 1,200 CUYD of Roadway Excavation, and 100 CUYD of Subexcavation.Significant Items for Option W include: 0.5 MILES of Full Depth Reclamation 8-Inch Depth of Existing Pavement, 4,350 TONS of Hot Asphalt Concrete Paving, 3,050 LNFT of 12-Inch Colored Concrete Curb and Gutter, 1,500 LNFT of 14-Inch Colored Concrete Curb and Gutter, 1,500 CUYD of Roadway Excavation, and 400 CUYD of Subexcavation.Significant Items for Option X include: 0.9 MILES of Full Depth Reclamation 8-Inch Depth of Existing Pavement, 5,200 TONS of Hot Asphalt Concrete Paving, 270 LNFT of 14-Inch Mountable Colored Concrete Curb and Gutter, 1,200 LNFT of 14-Inch Colored Concrete Curb and Gutter, 100 CUYD of Roadway Excavation, and 100 CUYD of Subexcavation.Significant Items for Option Y include: 120 LNFT of Curb and Gutter Removal and Installation, 650 SQYD of Asphalt Patch, and 160 LNFT of Standard Underdrain.COST RANGE: Estimated total cost for Schedule A, Option W, Option X, and Option Y is $5,000,000 to $7,000,000.CONSTRUCTION DURATION: May, 2020 through October, 2020. ADDITIONAL INFORMATION:Anticipated Bid Opening: December 10, 2019Anticipated Award: January 6, 2019
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/886b422cfddd4dd3b585c0f24f6be8fc/view)
 
Place of Performance
Address: Rocky Mountain National Park, CO, USA
Country: USA
 
Record
SN05507400-F 20191205/191204050232 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.