Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF DECEMBER 22, 2019 SAM #6597
SOLICITATION NOTICE

Y -- Marysville Ring Levee Phase 2B & 3

Notice Date
12/20/2019 2:47:12 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT SACRAMENT SACRAMENTO CA 95814-2922 USA
 
ZIP Code
95814-2922
 
Solicitation Number
W9123820R0021
 
Response Due
1/22/2020 10:00:00 AM
 
Archive Date
02/06/2020
 
Point of Contact
Shaun Conyers, Contracting Specialist, Phone: 916-557-5298, DeAnna L. Mannel, Contract Specialist, Phone: 916-557-6690
 
E-Mail Address
shaun.o.conyers@usace.army.mil, deanna.l.mannel@usace.army.mil
(shaun.o.conyers@usace.army.mil, deanna.l.mannel@usace.army.mil)
 
Description
****Attachment 2 - Drawings Volume 2 of 2 is too large to attach to this posting.� Please contact Shaun.O.Conyers@usace.army.mil for the file to be sent to you via a file transfer site.**** The Marysville Ring Levee (MRL) consists of approximately 7.5 miles of levee surrounding and protecting the City of Marysville, California. Planned levee improvements address under seepage, through-seepage, embankment slope stability, utility penetrations, constructability, settlement and geometrical corrections to the levee embankment. Two phases of the Marysville Ring Levee program, namely Phase 2B & Phase 3 are solicited as one construction project and are to be constructed in a minimum of two� construction seasons with all construction work completed by Dec. 2022.� Phase 3 has been divided up into multiple Segments (A through E) and Phase 2B labeled as Segment D.� Segments A, B, and C will be base contract items and Segments D and E will be option items.� Upon award of this contract, Segment A must be constructed first in 2020. Segments B and C must not begin physical work sooner than year 2021, unless otherwise notified by the Contracting Officer.�� Options Segments D and E must not begin physical work sooner than year 2021 and as the options are exercised, unless otherwise notified by the Contracting Officer. Approximately 15,000 linear feet of cutoff walls (open trench and deep mix method) will be constructed with a conventional degrade approach with removal of 1/3 of the levee height as measured from an average landside elevation. The cutoff wall begins on the east side of State Route 70 (SR70) and ends at a location just west of Highway 20, where the highway goes over the levee, near the PG&E sub- station.��
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/41a02ee66c3a4aa699ee5954f76292d4/view)
 
Place of Performance
Address: Marysville, CA, USA
Country: USA
 
Record
SN05522535-F 20191222/191220230151 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.