SOLICITATION NOTICE
54 -- Amendment to 36C25920Q0080 Questions and Answers
- Notice Date
- 12/23/2019 2:09:56 PM
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 314910
— Textile Bag and Canvas Mills
- Contracting Office
- 259-NETWORK CONTRACT OFFICE 19 (36C259) GLENDALE CO 80246 USA
- ZIP Code
- 80246
- Solicitation Number
- 36C25920Q0080
- Response Due
- 12/20/2019 8:59:59 PM
- Archive Date
- 02/18/2020
- Point of Contact
- Tamanica Danford-Leaftamanica.danford-leaf@va.gov
- E-Mail Address
-
tamanica.danford-leaf@va.gov
(tamanica.danford-leaf@va.gov)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Awardee
- null
- Description
- The purpose of this amendment is to update the instructions to offerors and evaluation sections; provide answers to questions posed and to extend the solicitation closing date. 1. Solicitation updates: 52.212-1(k) is hereby changed to read: Technical Capability Quotations of equal products must meet the salient physical, functional, or performance characteristics specified in this solicitation. The offeror shall provide proof wind load, and snow load requirements through a test report or a stamped engineering certification. 52.212-2(a) is hereby changed to read: Technical Acceptability The Government will evaluate quotes to determine whether the offered item meets the salient characteristics, including the test report or stamped engineering certification to substantiate that the offered item can withstand the snow load and wind load requirements. This Solicitation is hereby extended to December 31st, 2019 (4:30 pm MST) to accommodate the holiday schedule. The question period is now closed. 2. Questions and Answers Are certified test reports from an independent test lab or company required with proposals that validate the proposed shelter meets the wind and snow load requirements? An independent lab report is not necessary. Test results can be provided by a report or a stamped engineering certification will be accepted as verification. What is the maximum weight allowed per shelter carry bag? This will be based on the trailer allowable load weight. What are the minimum salient characteristics of the shelter vinyl fabric? There is no minimum specified. Fabric must be compliant with the snow and wind load requirements. What is the minimum number of end uprights required for the shelter frame? There is no required minimum. The frame must support the tent fabric, lights and HVAC. What is the minimum amount of cooling required in BTUs per hour? Enough for human comfort in a Montana summer. High performance. What is the minimum amount of heat required in kW? Enough for human comfort in a Montana winter. High performance. What are the maximum dimensions of the ECU? Determined by the space available on the trailer. What is the maximum weight of the ECU? Determined by the allowable load weight of the trailer. Are any of the following Brand Name features required? None of these brand specific features are a requirement. Minimum Air flow of 1100 CFM? 4 sets of forklift pockets? 60A, 27 long power cable with MIL-C-22992 Class L connector? Power relay to monitor correct phase? Hot gas, bypass valve? Is the ECU required to be certified by a testing lab to meet UL1995 for safety? This is not a requirement. What are the maximum dimensions of the generator? It must fit on the trailer with the shelter and associated equipment. What is the maximum weight of the generator? Determined by the allowable load weight of the trailer. What is the minimum internal height of the trailer? Must be able to accommodate all requested equipment. What is the minimum GVWR of the trailer? Must be able to accommodate all requested equipment. Is a spare tire required with the trailer? Yes, as requested in the salient characteristics. What type of hitch is required for the trailer? A combo pintle + ball hitch is best.�Ball hitch size doesn t matter too much: avg size of 2-inch is fine.� When the proposed solution meets all salient characteristics for physical, functional, and performance characteristics as specified in the solicitation, will professionally stamped engineering calculations demonstrating the wind and snow load be accepted in lieu of testing to support wind and snow load? Test results can be provided by a report or a stamped engineering certification will be accepted as verification. Is there a ship by date upon award for this solicitation? The delivery date will be 30 to 60 days after award.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/adaf7dc9017c461e8dd604ba9ea6bad3/view)
- Record
- SN05523621-F 20191225/191223230139 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |