Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 14, 2020 SAM #6651
MODIFICATION

Y -- CO FTNP ROMO 11(4) Beaver Meadows Road

Notice Date
2/12/2020 4:12:43 PM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF19B000022
 
Response Due
12/10/2019 1:00:00 PM
 
Archive Date
03/10/2020
 
Point of Contact
Leslie N. Karsten, Contract Specialist, Sheri Walsh, Contracting Officer
 
E-Mail Address
CFLContracts@dot.gov, CFLContracts@dot.gov
(CFLContracts@dot.gov, CFLContracts@dot.gov)
 
Description
THIS PROJECT IS ADVERTISED ON A FULL AND OPEN BASIS. THIS IS REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE AVAILABLE. PROJECT NUMBER: CO FTNP ROMO 11(4) PROJECT NAME: Beaver Meadows Road PROJECT DESCRIPTION: �This project provides 3R rehabilitation treatment for routes to include 4.85 miles of Beaver Meadows roadway within Rocky Mountain National Park. The project will also be lengthening and adding a FAST lane at Beaver Meadows Entrance Station which is approximately 1,400 feet.� The project consists of pulverizing the existing asphalt for additional base, concrete curb, drainage improvements, and repaving with approximately 4� of asphalt. The project will grade side slopes due to additional pavement thickness along shoulders.� Pullouts directly adjacent to the roadway will also be treated and repaved as part of the project. SIGNIFICANT QUANTITIES: Significant Items for Schedule A include: 250 LNFT of Standard Underdrain, 1.8 MILES of Full Depth Reclamation 8-Inch Depth of Existing Pavement, 10,750 TONS of Hot Asphalt Concrete Paving, 2,550 LNFT of 14-Inch Colored Concrete Curb and Gutter, 1,200 CUYD of Roadway Excavation, and 100 CUYD of Subexcavation. Significant Items for Option W include: 0.5 MILES of Full Depth Reclamation 8-Inch Depth of Existing Pavement, 4,350 TONS of Hot Asphalt Concrete Paving, 3,050 LNFT of 12-Inch Colored Concrete Curb and Gutter, 1,500 LNFT of 14-Inch Colored Concrete Curb and Gutter, 1,500 CUYD of Roadway Excavation, and 400 CUYD of Subexcavation. Significant Items for Option X include: 0.9 MILES of Full Depth Reclamation 8-Inch Depth of Existing Pavement, 5,200 TONS of Hot Asphalt Concrete Paving, 270 LNFT of 14-Inch Mountable Colored Concrete Curb and Gutter, 1,200 LNFT of 14-Inch Colored Concrete Curb and Gutter, 100 CUYD of Roadway Excavation, and 100 CUYD of Subexcavation. Significant Items for Option Y include: 120 LNFT of Curb and Gutter Removal and Installation, 650 SQYD of Asphalt Patch, and 160 LNFT of Standard Underdrain. COST RANGE: Estimated total cost for Schedule A, Option W, Option X, and Option Y is $5,000,000 to $7,000,000. CONSTRUCTION DURATION: May, 2020 through October, 2020. � ADDITIONAL INFORMATION: Anticipated Bid Opening:� December 10, 2019 Anticipated Award: January 6, 2019
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/6300a477fdb3424dbd117cfa4123673c/view)
 
Place of Performance
Address: Rocky Mountain National Park, CO, USA
Country: USA
 
Record
SN05560032-F 20200214/200212230150 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.