Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 12, 2020 SAM #6678
SOLICITATION NOTICE

61 -- 61--MOTOR,ALTERNATING C, IN REPAIR/MODIFICATION OF

Notice Date
3/10/2020 8:07:24 AM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
 
ZIP Code
17050-0788
 
Solicitation Number
N0010420QFB59
 
Response Due
3/16/2020 12:00:00 AM
 
Archive Date
03/31/2020
 
Point of Contact
Telephone: 7176052369
 
E-Mail Address
TERRENCE.KENNY@NAVY.MIL
(TERRENCE.KENNY@NAVY.MIL)
 
Awardee
null
 
Description
CONTACT INFORMATION|4|N743.39|WR1|717-605-2369|terrence.kenny@navy.mil| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|__Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |__Inspection at Destination and Acceptance at Other - Certifications Inspection at Source and Acceptance at Source - Material |TBD|N00104|TBD|TBD|SW3117|TBD|TBD|N/A|N/A|N4504 (SUBMEPP)-CERTIFICATIONS|TBD|N/A|See DD 1423 or as specified by block 14a of applicable DD 1423 data items|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. This repair is for the Advanced Equipment Repair Program (AERP). 2. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be ""issued"" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to ""issue"" contractual document as detailed herein. 3. Paper copies will not be provided. the terms and conditions of basic ordering agreement N00104-17-G-AR01 shall apply to this order unless modified or amplified by the terms and condition of this order. 4. As this is an AERP item, approval of certification by SUBMEPP (N45404)prior to shipment of materials will be required. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the MOTOR,ALTERNATING C . 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.1.1 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;15S337 01425 L D 2.1.2 Documents, drawings, and publications supplied are listed under ""Drawing Number"". These items should be retained until an award is made. DRAWING DATA=4456141 |80064| A| |X|0001 | A|00026|0000000 3. REQUIREMENTS 3.1 Refurbished Material - This item shall be inspected and where necessary, refurbished to be in accordance with CAGE ;01425; , drawing ;15S337 PC 1 TO 60; , and the applicable SUBMEPP Repair Instruction ;2460-012-0653, Rev J, Chg. 2, CSD108; , except as amplified or modified herein. 3.1.1 Parts that are replaced during refurbishment shall be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction. 3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD108; in ECDS at https://register.nslc.navy.mil/ 3.3 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;4456141 Rev A; and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to mark the working pressure on the item does not apply and is strictly prohibited. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. 5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ Block 12 - Within 120 Days After Contract Award, submit one copy (for approval/disapproval). Approval shall be obtained prior to performing any welding. This review (approval/disapproval) shall be within 90 days from date of receipt.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/138d3627448941288c02a23f0ab34496/view)
 
Record
SN05584808-F 20200312/200310230159 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.