Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 14, 2020 SAM #6680
SOLICITATION NOTICE

15 -- HOOK POINT,ARRESTIN

Notice Date
3/12/2020 3:23:55 AM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
NAVSUP WEAPON SYSTEMS SUPPORT PHILADELPHIA PA 19111-5098 USA
 
ZIP Code
19111-5098
 
Solicitation Number
N0038320RH094
 
Response Due
4/13/2020 12:00:00 AM
 
Archive Date
04/28/2020
 
Point of Contact
Telephone: 2156979780
 
E-Mail Address
OLEG.MAKSIMCHUK@NAVY.MIL
(OLEG.MAKSIMCHUK@NAVY.MIL)
 
Awardee
null
 
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT|SOURCE|TBD|N00383|TBD|TBD|TBD|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|2||| VALUE ENGINEERING (OCT 2010)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (OCT 2010)|1|| EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 DAYS|45 days of the last delivery under this contract||||| SMALL BUSINESS SUBCONTRACTING PLAN (AUG 2018)(DEVIATION 2018-O0018)|5|||||oleg.maksimchuk@navy.mil| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUL 2014)|2||| TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10||||||||||| FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM (DEC 2017)|5|||||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JUN 2019)|11|||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (NOV 2014))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2019)|12|336413|1250||||||||||| REPRESENTATION REGARDING CERTIAN TELECOMMUNICATIONS AND VIDEO SUREILLANCESERVICES OR EQUIPMENT (AUG 2019))|2||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||a1a| EVALUATION OF FIRST ARTICLE TESTING|5|||||| 1. SCOPE 1.1 . Forging(s) part number ;74A481699; shall be procured from the following company(ies): ;APPROVED FORGING HOUSE; ; ; 1.2 . Markings shall be in accordance with MIL-STD-130. 1.3 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;BOEING; drawing number ( ;76301; ) ;74A481700-2011; , Revision ;K; and all details and specifications referenced therein. 1.4 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. MIL-W-22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.5 If MIL-STD 454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with the latest revision of MIL-STD 2000 paragraph 1.2.6 (Soldering Specification). Contractors will not be denied consideration for contract award solely because they have not been able to obtain certifications due to unavailability of class billets in authorized soldering training schools. Contractors making a good faith effort to obtain class billets to certify the necessary personnel shall be given equal opportunity to do so and to compete for contracts. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE ALL THE QUALITY ASSURANCE REQUIREMENTS AND DD1423'S ARE 'HARD COPY"" AND ARE RETAINED BY THE FOLLOWING PERSONNEL: Robert Harris N22, robert.j.harris2@navy.mil Chris Hess NAVAIR 4.3.4.1, william.c.hess1@navy.mil Robert Hughes N23.1 / robert.w.hughes@navy.mil / ext 5994 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ all DD1423 data is hard copy and will be provided upon request. Separate reports shall be provided for the below listed subtitles and shall include certification that all vendors performing these processes are prime (OEM) approved sources/ or NADCAP Approved, certified DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 9: Statement B, US Government, Naval Inventory Control Point Block 12: First submission to be made upon submission of ;FIRST PRODUCTION LOT INSPECTION/TEST(FAT) PRODUCTION LOT INSPECTION/TEST; testing sample. ^ Block 14: Make submission to ;DCMA-QAR PCO NAVSUP CODE N23 NAVAIR CODE 4.3.4.1; . Block 13: Second submission required if the process/operation changes after approval of ; FIRST PRODUCTION LOT INSPECTION/TEST(FAT) PRODUCTION LOT INSPECTION/TEST ; test. ^^ Block 14: Make submission to ;DCMA-QAR NAVSUP WSS CODE N23 PCO NAVAIR 4.3.4.1; . Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 9: Statement B, US Government, Naval Inventory Control Point Block 12: First submission to be made upon submission of ; FIRST PRODUCTION LOT INSPECTION/TEST(FAT) PRODUCTION LOT INSPECTION/TEST ; testing sample. ^ Block 14: Make submission to ;DCMA-QAR NAVSUP CODE N23 PCO NAVAIR 4.3.4.1; . DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ HARDSURFACE AND HEAT TREAT PER PS15989 USING -METCO-THERMOSPRAY 12C XPT-595 POWDER EXCEPT THAT FINISH COATING THICKNESS SHALL BE .030 +/- .010. Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ 74A481699 POINT, DIE FORGING-ARRESTING HOOK 1. RAW MATERIAL IAW (76301) 74A481699-2003 2. DIE FORGING / 4330V MODIFIED / AMS6411 3. INSPECTION AND ACCEPTANCE OF THE FORGING IAW: PS23006 GRADE A Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ NSPECTION AND ACCEPTANCE OF THE FORGING IAW: PS23006 GRADE A Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ A REQUEST FOR VARIANCE IS REQUIRED FOR ANY DEVIATION OR WAIVER ENCOUNTERED DURING ANY PORTION OF MANUFACTURE. THIS MUST BE ROUTED TO THE ACO AND DCMA-OFFICE. THE FORM IS DD-1694 AND THE DCMA SHALL PROVIDE A FORM DD-1698.THE RFV MUST GO TO THE CONTRACTING OFFICER AT NAVSUP WSS FOR REVIEW AND THEN FORWARDED TO THE BASIC DESIGN ENGINEER FOR REVIEW AND DETERMINATION.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/b248bed618e94d0da636b2823025681a/view)
 
Record
SN05587137-F 20200314/200312230142 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.