Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 03, 2020 SAM #6700
SOLICITATION NOTICE

Y -- Culvert Repair at Caesar Creek Lake - Waynesville, Ohio

Notice Date
4/1/2020 10:52:19 AM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT LOUISVILL LOUISVILLE KY 40202-2230 USA
 
ZIP Code
40202-2230
 
Solicitation Number
W912QR20Q0034
 
Response Due
4/9/2020 7:00:00 AM
 
Archive Date
04/24/2020
 
Point of Contact
Logan D. Barrett, Phone: 5023156872, Aaron L. Sanford
 
E-Mail Address
logan.d.barrett@usace.army.mil, aaron.l.sanford@usace.army.mil
(logan.d.barrett@usace.army.mil, aaron.l.sanford@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The contractor shall provide all labor, materials, supplies, tools, and equipment necessary to remove trees and vegetation from around 2 drainage ditch culverts that cross under the Tailwater access road and place class C riprap. Contractor will remove sod and remove enough dirt to allow the first layer of the class C rip rap to lay even with the surrounding grounds. Contractor can use dirt that is being removed from areas not washed out and compact it into the washed out areas as needed ensuring it is compacted per standards before placing riprap, no sod or vegetation will be used for fill, any extra dirt needed to fill the washed out areas is the contractor�s responsibility. Contractor will place class C riprap from the lower edge of the guard rail posts to the bottom of the drainage ditch and go 15 feet wide from the center line of the culverts in each direction for a total of 30 feet wide riprap and extend past the end of the culverts 15 feet. Rip rap will be at least two layers deep. Contractor will be responsible for vegetation clearing on both culverts 40 feet past the ends of the culvert pipes and 30 feet wide except on culvert number 2 upstream side due to property line, contractor will only clear up to the property line approximately 20 feet and ensure that the fence is not disturbed, culvert number 2 downstream will be 40 feet past end of culvert. The bank on the right side will not be cleared off but the drain channel and 15 feet from centerline on the left side will still get cleaned out. Riprap will be placed up to the base of the bank on the right side. Contractor is responsible on culvert 1 downstream to relay the class B and C riprap that is on site in the base of the channel at the end of the culvert after all the vegetation is cleared out and the small island is removed. All vegetation and extra material is the contractors� responsibility to remove from the project. All grounds disturbed by contractor shall be finish graded seeded and straw placed.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/b4eacd4c91924512b5623e4f5f027459/view)
 
Place of Performance
Address: Waynesville, OH 45068, USA
Zip Code: 45068
Country: USA
 
Record
SN05607157-F 20200403/200401230144 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.