Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 18, 2020 SAM #6715
SOLICITATION NOTICE

42 -- Pre-Solicitation Notice/Synopsis for Filter Assembly & Filter Element; NSN's 4240-01-541-8960 & 4240-01-332-2068

Notice Date
4/16/2020 5:01:07 PM
 
Notice Type
Presolicitation
 
NAICS
333413 — Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
 
Contracting Office
W4GG HQ US ARMY TACOM WARREN MI 48397-5000 USA
 
ZIP Code
48397-5000
 
Solicitation Number
20R0147
 
Response Due
5/1/2020 2:00:00 PM
 
Archive Date
05/16/2020
 
Point of Contact
Daniel C. Poehling
 
E-Mail Address
daniel.c.poehling.civ@mail.mil
(daniel.c.poehling.civ@mail.mil)
 
Description
The Army Contracting Command � Detroit intends to issue a Request for Proposal (RFP) in May or June 2020 for the Filter Assembly and Filter Element; NSN�s:� 4240-01-541-8960 and 4240-01-332-2068; P/N�s:� 5-19-14209 and 5-19-11232; NAICS: �333413; End Item: �M20 Simplified Collective Protection Equipment (SCPE).� IUID is not required.� The RFP will be Full and Open Competition and result in a Firm-Fixed Price contract.� The estimated quantity for the Filter Assembly is 282 each plus one 100% option quantity.� The estimated quantity for the Filter Element is 80 each plus one 100% option quantity. �The Technical Data Package (TDP) is Distribution C (limited to U.S. Government agencies and their contractors) and export controlled.� First Article Test (FAT) and Production Lot Test (PLT) are required.� For the Filter Assembly, the Production Lead Time (PLT) without FAT (with Government approved FAT waiver) is 210 days after award at a rate of 100 each/month.� The PLT with FAT is approximately 360 days after award at a rate of 100 each/month.� The FAT Report (FATR) is due 240 days after award.� For the Filter Element, the Production Lead Time (PLT) without FAT (with Government approved FAT waiver) is 150 days after award at a rate of 80 each/month.� The PLT with FAT is approximately 240 days after award at a rate of 80 each/month.� The FAT Report (FATR) is due 180 days after award.� The Government FATR approval time is 30 days after receipt of FATR. �Packaging is Military/B; the Special Packaging Instruction (SPI) number for the Filter Assembly is P5-19-14209, dated 18 Sep 2014, Rev A; and P5-19-11232, dated 10 Apr 2018, Rev J for the Filter Element.� Inspection and Acceptance are Origin. �Free on Board is Destination.�
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/54ff81e550b54e07aee2464b8e7178cc/view)
 
Place of Performance
Address: USA
Country: USA
 
Record
SN05623660-F 20200418/200416230151 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.