Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 08, 2020 SAM #6735
SOLICITATION NOTICE

53 -- 53--MOUNT,RESILIENT,UTI

Notice Date
5/6/2020 2:11:35 PM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
DLA AVIATION AT PHILADELPHIA, PA PHILADELPHIA PA 19111-5098 USA
 
ZIP Code
19111-5098
 
Solicitation Number
SPRPA120RY022
 
Response Due
3/27/2020 12:00:00 AM
 
Archive Date
04/11/2020
 
Point of Contact
Telephone: 2157375103
 
E-Mail Address
MICHAEL.BAUDER@DLA.MIL
(MICHAEL.BAUDER@DLA.MIL)
 
Awardee
null
 
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| TIME OF DELIVERY (JUNE 1997)|20|0001|58 EA|830|||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|TBD|SPRPA1|TBD|TBD|SEE SCHEDULE|TBD|N/A|N/A|TBD|N/A|N/A|N/A|N/A|N/A| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|2||| VALUE ENGINEERING (OCT 2010)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|365 Days After Effective Date of Contract|45 Days After Discovery of Defect||||| SMALL BUSINESS SUBCONTRACTING PLAN (AUG 2018)(DEVIATION 2018-O0018)|5|||||michael.bauder@dla.mil| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUL 2014)|2||| TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JUN 2019)|11|||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (NOV 2014))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2019)|12|332510|750||||||||||| REPRESENTATION REGARDING CERTIAN TELECOMMUNICATIONS AND VIDEO SUREILLANCESERVICES OR EQUIPMENT (AUG 2019))|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| This amendmend adds and deletes several clauses. This will be a commercial solicitation and the subsequent award will be a commercial contract accordingto FAR Part 12. This is a Commercial , FAR Part 12, award with the following addendum incorporated herein: Addendum to FAR 52.212-4 Contract Terms and Conditions Commercial Items Under paragraph (a), ""Inspection and Acceptance"" add the following: 1. FAR Clause 52.246-2 Inspection of Supplies-Fixed Price applies amended herein. All product audits performed at the discretion of the DCMA QAR shall be conducted by witnessing contractor inspections or tests on a non-interference interference basis. (e.g., when advance notification is furnished of the time contractor inspections or tests will be performed, and that time arises and the QAR is unavailable, the contractor shall proceed. Verification shall then be accomplished by records review.) 2. The contractor shall maintain a quality system that addresses the element of ISO9001- 2000/AS9100B, Quality System Model for Quality Assurance in Design/Development, Production, Installation and Servicing, and a calibration system that addresses the elements of ISO-10012-1, ANSI/NCSL Z540 or an equivalent program approved by the Navy. 3. The government reserves the right to assess the contractor's compliance to its documented quality system throughout the performance of this contract and data which comprise the quality system shall be made available to the government for their review and use. The acceptance of non-conforming supplies is a prerogative of and shall be as prescribed by the government. The government reserves the right to disapprove the quality system or portions thereof when it fails to meet its intended objectives. 4. The Contractor shall not make any configuration changes, engineering changes For part number changes to the contract/purchase order items, including, but not limited to, the item's hardware, software or firmware, unless approved by the Procurement Contracting Officer (PCO). In addition, approval the appropriate technical authority may also be required. Guidance on how to submit a proposed engineering or part change may be obtained from the PCO. 5. The Contractor shall not manufacture any item for acceptance by the Government incorporates a known departure from technical or contractual requirements unless a request for a deviation has been approved. Authorized deviations are a temporary departure from the requirements only and do not authorize a change to the item's configuration baseline. Any deviation, major or minor, must be approved by the PCO prior to acceptance. Drawings are not available for this Request for QuotationOfferors are advised that offers received from sources which are not government-approved sources of supply will be deemed technically unacceptable, and therefore ineligible for award. Any distributors of approved source(s) MUST submit a copy of their authorized distributor letter, on the source's letterhead, to the buyer point of contact indicated on the solicitation via email, at time of proposal submittal. \
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/f68921f04d6a4334a21144b30ab12b35/view)
 
Record
SN05648590-F 20200508/200506230206 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.