Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 08, 2020 SAM #6735
SOURCES SOUGHT

Y -- Hoover Dam Safety (1), Guardrail Improvements

Notice Date
5/6/2020 3:02:45 PM
 
Notice Type
Sources Sought
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF20SS0027
 
Response Due
5/22/2020 1:00:00 PM
 
Archive Date
06/06/2020
 
Point of Contact
Eric Grosskreuz, Sheri Walsh
 
E-Mail Address
CFLContracts@dot.gov, CFLContracts@dot.gov
(CFLContracts@dot.gov, CFLContracts@dot.gov)
 
Description
6982AF20SS0027 THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT� INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Businesses, HUBZone small businesses, Woman owned small business concerns, 8(a) small businesses, or Service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs MUST submit the following by e-mail to CFLAcquisitions@dot.gov (Attn:� Eric Grosskreuz) for receipt by close of business (2 p.m. local Denver time) on May 22, 2020:� (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a) small business program.� In the case of a Service Disabled Veteran Owned Small Business Concern, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration).� This information must be provided in order to determine eligibility � DO NOT SEND COPIES OF YOUR SAM PROFILE; (3) Letter from bonding agent stating your firm�s capability to bond for a single project of $3 million, and your firm�s aggregate bonding capacity; (4) Provide a list of road construction projects of equal or greater value and scope to the NV FTBR Hoover Dam Safety (1), Guardrail Improvements project in which you performed (as the prime contractor) for removal and replacement of guardrail, concrete barrier and installation of pedestrian railing, surface treatments and refreshing striping.� State whether your firm was the prime contractor or subcontractor on the project.� DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc.� Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.� All firms should be certified in the All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ A Qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs.� This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs.� A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs. PROJECT DETAILS:� NV FTBR Hoover Dam Safety (1), Guardrail Improvements The Bureau of Reclamation (USBR) has coordinated with the Central Federal Lands Highway Division (CFLHD) to assist with the design and construction of barrier improvements along the Hoover Dam Access Road. �The project begins at the Clark County/USBR boundary, approximately 750 ft. west of the security checkpoint on the Nevada side and continues across the Hoover Dam, ending at the Arizona Helipad parking lot on the Arizona Side (Parking Lot 16). Based on available funding the scope of work for the project will focus primarily on barrier improvements. Proposed work includes removal and replacement of guardrail, concrete barrier and installation of pedestrian railing at select locations. �Two options are for surface treatments, refreshing striping, and minor improvements. Significant Quantities and Line Items: Schedule A Item� � � � � � � � � � � � � � Description� � � � � � � � � � � � � � � �� � � � �Unit�� �����Quantity 30202-2000��� Roadway Aggregate, Method 2��� �������TON� � � � � � 1,100 61701-4500��� Guardrail System CRG, Type 2, �����������LNFT� � � � � 5,150 � � � � � � � � � � � � � � Class A Steel Posts 617������������������ End terminals (assorted)� � � � � � � � � � � � EACH� � � � � � � � 16 633������������������ Permanent Signing� � � � � � � � � � � � � � � � � �EACH� � � � � � � 135 63506-0500���Temporary Traffic Control, Flagger����HOUR� � � � �1,500 Option X 40601-0000��� Fog Seal� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � TON� � � � � � � 28 41402-2000��� Cracks, Cleaning and Sealing� � � � � � � � �MILE� � � � � � �4.0 41801-2000��� Asphalt Concrete Pavement Patch,� � �SQYD� � � � � �400 ������������������������ Type 2 633������������������ Permanent Signing� � � � � � � � � � � � � � � � � � ��EACH������� �����85 63506-0500��� Temporary Traffic Control, Flagger� � �HOUR���� �����150 Option Y 40601-0000��� Fog Seal� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � TON������������� 20 63402-1500� � Permanent Pavement Markings� � � � � � MILE� � � � � 13.0 41801-2000��� Asphalt Concrete Pavement Patch,� � �SQYD���������� 400 ������������������������ Type 2 63506-0500��� Temporary Traffic Control, Flagger��� �HOUR���� �����600 63506-0600��� Temporary Traffic Control, Pilot Car�� HOUR���� �����300 MISCELLANEOUS:� All work will need to be completed at night. �No day work will be allowed. �Davis-Bacon wages for both Clark County, NV and Mohave County, AZ will be required as work is in both states. �The project will have a CAT-EX document for environmental clearance.� The project includes a base schedule with two options. �The estimated for the base schedule and options is between is $1,000,000.00 and $3,000,000.00. The anticipated advertisement date is July 2020, with anticipated bid opening, award and notice to proceed in September 2020.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/c198c6c5d0ec4c6d9f51aaa5acadff7d/view)
 
Place of Performance
Address: Boulder City, NV 89005, USA
Zip Code: 89005
Country: USA
 
Record
SN05649221-F 20200508/200506230210 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.