Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 16, 2020 SAM #6743
SOLICITATION NOTICE

Z -- P898, REPLACE PIER 32 AT NAVSUBASE NEW LONDON, CT

Notice Date
5/14/2020 1:04:29 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
NAVAL FAC ENGINEERING CMD MID LANT NORFOLK VA 23511-0395 USA
 
ZIP Code
23511-0395
 
Solicitation Number
N4008520R0037
 
Response Due
5/21/2020 11:00:00 AM
 
Archive Date
10/31/2020
 
Point of Contact
Gary Milton, Phone: 7573412074, Laura Thomas, Phone: 7573411624
 
E-Mail Address
gary.milton1@navy.mil, laura.e.thomas4@navy.mil
(gary.milton1@navy.mil, laura.e.thomas4@navy.mil)
 
Description
This design-bid-build project includes but is not limited to construction of a concrete filled steel pipe pile supported pier with concrete deck, mooring fittings, mechanical and electrical utilities, an integrated composite fender system and specialized equipment including composite camels. The pier will provide two berths for general berthing and maintenance at SUBASE New London. The project will also include relocation of the floating crane�s weight testing support facility. Built-in equipment includes jib cranes (1.5 tons) for supporting electrical cables between the pier and vessels and adjustable retractable crane-less brows. Work also includes demolition of the existing concrete and pile Piers 32, 10 and 17. Site preparation includes earthwork, soil treatment, selective utility and mooring demolition, and dredging. Dredging will allow safe maneuvering room for vessels while mooring or exiting northern berths (Piers 32/Turning Basin and Pier 10) and in the following areas: turning basin, areas at the berth for navigation and maintenance operations and areas at the existing Piers 10 and 32. Dredge disposal will include the use of Confined Aquatic Disposal (CAD) cell located in the Thames River. Electrical utilities include shore power for vessels including primary and secondary distribution, transformers, substations, primary switches, grounding/lightning protection and telecommunication infrastructure. Mechanical systems include, water, wastewater, compressed air, and fire protection. Environmental mitigation requirements includes marine mammal and water quality monitoring, reporting to national oceanic and atmospheric administration national marine fisheries service, acoustic surveys, pre and post dredge sampling, benthic sampling and analysis of Confined Aquatic Disposal (CAD) cells and CAD cell cap assessment, shellfish resources testing and mitigation will be required to satisfy federal, state and local environmental regulations and requirements.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/6f60bc50f2c54afc8e3248816920b2ca/view)
 
Place of Performance
Address: CT, USA
Country: USA
 
Record
SN05657708-F 20200516/200514230155 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.