SOLICITATION NOTICE
59 -- 59--CIRCUIT CARD ASSEMB
- Notice Date
- 6/24/2020 12:12:16 AM
- Notice Type
- Solicitation
- NAICS
- 333999
— All Other Miscellaneous General Purpose Machinery Manufacturing
- Contracting Office
- SPRMM1 DLA MECHANICSBURG MECHANICSBURG PA 17055-0788 USA
- ZIP Code
- 17055-0788
- Solicitation Number
- SPRMM120QWB69
- Response Due
- 7/6/2020 12:00:00 AM
- Archive Date
- 07/21/2020
- Point of Contact
- Telephone: 7175503163
- E-Mail Address
-
ROBERT.REHMAN@DLA.MIL
(ROBERT.REHMAN@DLA.MIL)
- Awardee
- null
- Description
- ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|ISO9001| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEC 2017))|5|||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (MAR 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2020)|13|X|X|X|||X|X||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS CERTIFICATE (NOV 2014)|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|334412|750|||||||||||| REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCESERVICES OR EQUIPMENT (AUG 2019))|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| EVALUATION CRITERIA AND BASIS FOR AWARD-|1|| 1. If you are a dealer providing the product of the approved source of supply, please provide the Cage Code and Part Number of the product you are quoting on: Cage Code _________________, P/N:___________________ 2. Since Government Source Approval is required on the majority of orders/contracts, Dealers need to advise at time of quote submission if they can provide a Certificate of Conformance for the product they are offering. If submitting quote via EDI, a faxed or scanned copy must be sent to the buyers. 3. Notice to Surplus/New Surplus/New Manufactured Surplus Suppliers: A Surplus Material Certificate must accompany all quotes for Surplus/New Surplus/New Manufactuured Material. Submission of your quote without a surplus certificate will null and void your quote. 4.Delivery Days ___________ARO. 5. When submitting quotes via EDI, make sure you specify any exceptions (i.e. Military Specifications/Standards, packaging, Inspection and Acceptance, Packaging House, etc) or follow-up with a hard copy of the exceptions. If nothing is indicated or received, award will be based uponsolicitation requirements. Changes or request for changes after award will have consideration costs deducted on the modifications 6. If supplies will be packaged at a location different from thhe offeror address, the offeror shall provide the name and address of the packaging facility. 7. Please provide an email address for follow-up communications. Email Address: ____________________________ \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CIRCUIT CARD ASSEMB , part of the ;MK41 Verticle Launch System; . 1.1.1 Full Item Name for CIRCUIT CARD ASSEMB Referenced in this contract/purchase order is ;CIRCUIT CARD ASSEMB; . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 ""Document References"" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| | | DOCUMENT REF DATA=ISO9001 | | | |160921|A| | | 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The CIRCUIT CARD ASSEMB furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;38597 6387853-159; 3.2 Marking - This item shall be physically identified in accordance with MIL-STD-130. 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.4 Vendor Waivers/Deviations - Compliance with the delivery date and technical requirements of NAVICP-MECH Repair Part Material contracts is expected. As a cautionary note, seller intended use of any material which is not in full compliance with the specified contract technical requirements shall be identified as an exception in response to this solicitation. Request for delivery date extensions and waivers/deviations shall be accompanied by an explanation of the cause for the delay, or the reason for the requested nonconformance to this solicitation in the event the Procurement Contracting Officer (PCO) concurs with your request. Request for waivers/deviations shall provide justification for the requested change including an evaluation which demonstrates that proposed nonconformance will not affect the quality, form, fit, or function of the part. Requests for Waiver/Deviations shall be presented to the Government Quality Assurance Representative (QAR) for comment. (The QAR shall forward the request, with their comments, directly to the post award PCO within five working days after receipt.) 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/"30--GEAR ASSEMBLY,SPEED
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/6e2f03d2a0bc4401a2d05a378dc27fdf/view)
- Record
- SN05701709-F 20200626/200624230151 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |