Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 01, 2020 SAM #6789
SOLICITATION NOTICE

Y -- DLA Aviation Operations Center, Phase II, Defense Supply Center Richmond (DSCR) (Amendment 1)

Notice Date
6/29/2020 7:11:40 AM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
W2SD ENDIST NORFOLK NORFOLK VA 23510-1096 USA
 
ZIP Code
23510-1096
 
Solicitation Number
W91235620R2005
 
Response Due
7/10/2020 2:00:00 PM
 
Archive Date
07/25/2020
 
Point of Contact
Tarik Booze, Phone: 7572017103, Fax: 7572017183, Dianne K. Grimes, Phone: 7572017839, Fax: 7572017183
 
E-Mail Address
tarik.a.booze@usace.army.mil, dianne.k.grimes@usace.army.mil
(tarik.a.booze@usace.army.mil, dianne.k.grimes@usace.army.mil)
 
Description
(Amendment 1 available) The DLA Aviation Operations Center Phase II project requirements will construct a multi-story office building of 281,075 SF to accommodate 1,622 employees in an administrative operations center. The Operations Center includes: open and individual administrative office and support areas (mail distribution, packing, shipping, reception space, reproduction area, unclassified conference and Video Tele-Conference (VTC) space, law library, kitchenette/break, restrooms, storage, equipment and supply rooms, passenger and service elevators, lightning protection, fire suppression, fire alarm, mass notification systems, Intrusion Detection System (IDS) and energy management control system (EMCS), and building information systems. The project will utilize conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), DLA, and Defense Supply Center, Richmond design standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01. The project also includes emergency generators, site improvements, special foundations, parking and all necessary supporting facilities.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/600b49f2f19c47fea9c546b74efeabf3/view)
 
Place of Performance
Address: Richmond, VA, USA
Country: USA
 
Record
SN05706284-F 20200701/200629230154 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.