Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 02, 2020 SAM #6821
SOLICITATION NOTICE

Y -- CA FTNP YOSE 14(7) Repairs on Wawona Road

Notice Date
7/31/2020 3:04:14 PM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF20B000022
 
Response Due
8/7/2020 1:00:00 PM
 
Archive Date
08/22/2020
 
Point of Contact
Jorey Deml, Sheri Walsh
 
E-Mail Address
cflacquisitions@dot.gov, cflacquisitions@dot.gov
(cflacquisitions@dot.gov, cflacquisitions@dot.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Solicitation Number: 6982AF20B000022 CA FTNP YOSE14(7) Repairs on Wawona Road THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET ASIDE. � THIS IS A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE AVAILABLE. � PROJECT NUMBER: CA FTNP YOSE 14(7) � PROJECT NAME: Repairs on Wawona Road � PROJECT DESCRIPTION: This project includes repairs to 4 sites on Wawona Road within Yosemite National Park.� The work includes excavation/rock excavation (may require blasting) and rock bolts (dowels) to stabilize rock slopes at Milepost (MP) 8.0, special rock embankment to stabilize the road shoulder at MP 18.7, and drainage improvements including pipe culvert installations and placement of riprap at MP 19.6 and 20.3. The terrain is mountainous with the elevation ranging between 4,300 and 5,700 feet. All of the work is occurring in natural resource sensitive areas.� Construction phasing, temporary traffic control, and timely completion of construction will be crucial to minimize disruptions to park visitors throughout construction and achieve customer satisfaction.� � SIGNIFICANT QUANTITIES: 3,800 cubic yards of roadway/rock excavation 490 cubic yards of special rock embankment 200 linear feet of rock dowels 220 linear feet of pipe culverts � COST RANGE: The proposed project is estimated at a cost between $1,000,000 and $2,000,000. � CONSTRUCTION DURATION: September, 2020 through December, 2020 � ADDITIONAL INFORMATION: Bid Opening: August 7, 2020 Anticipated Award: August, 2020 �
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/11066391a4904a79a9940f2d9aa60f44/view)
 
Place of Performance
Address: Yosemite National Park, CA 95389, USA
Zip Code: 95389
Country: USA
 
Record
SN05741632-F 20200802/200731230146 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.