Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 02, 2020 SAM #6821
SOURCES SOUGHT

Z -- COASTAL STORM RISK MANAGEMENT (CSRM) BOGUE BANKS, CARTERET COUNTY, N.C.

Notice Date
7/31/2020 12:57:56 PM
 
Notice Type
Sources Sought
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT WILMINGTO WILMINGTON NC 28403-1343 USA
 
ZIP Code
28403-1343
 
Solicitation Number
W912PM20BBPLA
 
Response Due
8/11/2020 11:00:00 AM
 
Archive Date
12/31/2020
 
Point of Contact
Alicia Evans, Phone: 9102514785, Rosalind Shoemaker, Phone: 9102514436
 
E-Mail Address
alicia.evans@usace.army.mil, rosalind.m.shoemaker@usace.army.mil
(alicia.evans@usace.army.mil, rosalind.m.shoemaker@usace.army.mil)
 
Description
The U.S. Army Corps of Engineers, Wilmington District � Coastal Storm Risk Management Bogue Banks Beaches, Carteret County, North Carolina This is a project labor agreement survey only. This is not a request for proposal, request for quote, or invitation for bid. There will not be a solicitation, specifications, or drawings available at this time. This is a SPECIAL NOTICE. No proposals are being requested or accepted with this notice. The U.S. Army Corps of Engineers, Wilmington District is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLA) for large scale construction projects (exceeding $25 million) within the Wilmington District and surrounding areas. This market survey is being posted for the Coastal Storm Risk Management Bogue Banks Beaches in Carteret County, North Carolina Description of Work:� Estimated Quantity: 3,148,580 CY Environmental Window:� December 1 � March 31 The work consists of furnishing plant, labor, materials, and equipment to perform dredging, transporting, placing and shaping beach quality sand and performing all pre and post construction beach surveys.� Approximately 3 borrow areas are available for the project and located offshore of the Bogue Banks Beaches. The Bogue Banks Beaches Coastal Storm Risk Management Project consists of placing 3,148,530 CY of Dune and Berm beach fill along 114,910 Linear Feet of Bogue Banks Beaches with four dune sections (31,138 feet). The main fill also includes berm sections and three dune Section located within the West end of Emerald Isle Beach and one dune section is located within Atlantic Beach.� The work will require a U.S. Coast Guard Ocean Certified Dredge. All beach work will not begin until 1 December and must be completed by 31 March of the following year. The project also consists of extending approximately 14 existing walkover structures in Emerald Isle Beach and approximately 14 existing walkover structures in Atlantic Beach and the stabilization of approximately 61 acres of new dune. The project area includes the towns of Atlantic Beach, Pine Knoll Shores, Salter Path, Indian Beach and Emerald Isle. A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). Accordingly, Offerors are requested to respond to this Special Notice regarding PLA with the following information. (1) Do you have knowledge that a PLA has been used in the Wilmington District and surrounding areas, on projects of this kind? If so, please provide supporting documentation. (2) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible. (3) Are you aware of time sensitive issues/scheduling requirements that would impact the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible. (4) Identify specific reasons why or how you believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. (5) Identify specific reasons why you do not believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. (6) Please identify any additional information you believe should be considered on the use of a PLA on the referenced project. (7) Please identify any additional information you believe should be considered on the non-use of a PLA on the referenced project. (8) Please provide a list of recent (2-5 years) construction projects in the local labor market of the project under consideration. Include the following items: -Project Name/Location -Project Description -Initial Cost Est/Actual Final Cost -Was the project completed on time -Number of craft trades present on the project -PLA (Y/N) -Were there any challenges experienced during the project (delays, investigations, health and safety issues, labor shortages, management /organizational issues, etc)? (9) Which trades are expected to be employed on this project? Are you likely to need some union skilled trades for at least part of this project? (10) What market share does union labor have in the geographic area for this project or type of construction? (11) Does the local market contain the sufficient number of available skilled workers for this project? Are there�other projects in the vicinity going to limit the pool of skill labor available for your project? (12) Has a project like this been done before in the local market? (13) What investments have been made to support registered apprenticeship programs? (14) Have PLAs been used on comparable projects undertaken by the public sector in this geographic region? Have PLAs been used on this type of project in other regions? (15) Which CBAs are likely to expire during the course of the project under consideration that might cause delays? (16) How do open shop and union wage rates influence prevailing wage rates in the local market and compare to Davis Bacon rates? What impact does unionization in the local market have on wages? (17) Could a PLA contribute to cost savings in any of the following ways? ��������������� -Harmonization of shifts and holidays between the trades to cut labor costs? ��������������� -Minimization disruptions that may arise due to expiration of CBA? ��������������� -Availability of trained, registered apprentices, efficient for highly skilled workforce? ��������������� -Allowing for changes in apprentice to journeyman ration. ����������������-Serving as management tool that ensure highly skilled workers from multiple trades are coordinated in the���� most efficient way. ����������������-Others? (18) Could a PLA minimize risk and contribute to greater efficiency in any of the following ways? ��������������� -Mechanisms to avoid delays ��������������� -Complying with Davis Bacon and other labor standards, safety rules and EEO and OFCP laws. ����������������-Ensuring a steady supply of skilled labor in markets with low supply or high competition for workers. (19) Are there ways in which a PLA might increase costs on this particular project? (20) What is the cost impact to the bid due to a PLA? Interested Offerors shall respond to this Special Notice no later than 11 August 2020. �Mail, or E-mail your response to U.S. Army Engineer District Wilmington, Attn: CESAW-CT/Ms. Alicia Evans and Ms. Rosalind M. Shoemaker, 69 Darlington Ave, Wilmington, NC, 28403; E-mail � alicia.g.evans@usace.army.mil and rosalind.m.shoemaker@usace.army.mil. This Special Notice is not to be construed as a commitment by the Government, nor will the Government pay for the information solicited.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/4a4ab24eafc84237b8a6438dc7c04780/view)
 
Place of Performance
Address: NC, USA
Country: USA
 
Record
SN05742161-F 20200802/200731230150 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.