SOLICITATION NOTICE
66 -- Magnetic Particle Wet Bench
- Notice Date
- 8/6/2020 12:52:10 PM
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 541380
— Testing Laboratories
- Contracting Office
- W6QK ACC-PICA PICATINNY ARSENAL NJ 07806-5000 USA
- ZIP Code
- 07806-5000
- Solicitation Number
- W15QKN-20-Q-0D0Y
- Response Due
- 8/13/2020 12:00:00 PM
- Archive Date
- 08/28/2020
- Point of Contact
- Yubaraj Rasaily
- E-Mail Address
-
yubaraj.rasaily.civ@mail.mil
(yubaraj.rasaily.civ@mail.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- This is a combined synopsis/solicitation for a commercial item prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation.�Quotes are being requested; a written solicitation will not be issued. Please find attached Combo Synopsis. The following questions and answers are provied for the subject contract opportunity: Q1. Is the end user performing fluorescent magnetic particle inspection and if so do they need an ultraviolet light?Will the end user require a room darkening hood assembly with white light and exhaust fan? Answer: Yes a room darkening hood assembly with white light and exhaust fan would be required Q2. The description requires a pneumatic tail stock.� This is not how typical MPI equipment works.� Normally only the head stock has the pneumatic function.� Typically the tail stock slides on rails, is moved near the head stock then locked into place.� At that point a part is placed between the head & tail stocks and the pneumatic head stock is activated thereby clamping the part in place. Please confirm the end user needs the pneumatic feature on tail stock. Answer: Pneumatic tailstock not required. Q3. It is our understanding that Picatinny requires the unit to meet ASTM E1444.� Per ASTM E1444 the equipment needs to be calibrated after installation.� The OEM calibration does not satisfy the E1444 equipment accuracy requirements stipulated in paragraph 7.4.� Please confirm that Picatinny wants the supplier to ensure the unit complies to E1444 after the unit is installed. Answer: Calibration IAW ASTM E1444 is required As a resulf of the questions and answers, the Combo Synopsis (ComboSynopsis_R1) is updated to reflect the changes. ComboSynopsis_R1 shall be used and referenced when submitting proposal/quote for the effort.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/289590fececa4bf3b9d295911b5c4e26/view)
- Record
- SN05748446-F 20200808/200806230154 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |