Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 25, 2020 SAM #6875
SOLICITATION NOTICE

Z -- Repair Roof Bldg. 887 Selfridge ANGB

Notice Date
9/23/2020 3:26:13 PM
 
Notice Type
Solicitation
 
NAICS
238160 — Roofing Contractors
 
Contracting Office
W7NF USPFO ACTIVITY MIANG 127 SELFRIDGE ANGB MI 48045-5213 USA
 
ZIP Code
48045-5213
 
Solicitation Number
W50S85-20-R-0016
 
Response Due
8/25/2020 8:00:00 AM
 
Archive Date
09/30/2020
 
Point of Contact
Daniel Taliaferro, Phone: 5862395539, Steven Stocking, Phone: 5862394881
 
E-Mail Address
daniel.taliaferro.1@us.af.mil, steven.stocking.2@us.af.mil
(daniel.taliaferro.1@us.af.mil, steven.stocking.2@us.af.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
****NOTICE**** 18 Aug 20 Pre-Proposal Site Visit Conference Minutes and Pre-Proposal Site Visit Sign-In Sheet Posted Contractor shall provide all materials, tools, and labor required to repair roof at Bldg 887 according to the attached Statement of Work and specifications. Roofing Work A.��� Contract shall repair the following roof areas (refer to attached drawing) ������ 50� x 80� Built-up roof � Approximately 4,000 sf B.��� Contractor shall remove the existing built-up roof system down to the structural deck, including the removal of the gravel stop. C.��� Contractor shall repair structural decking as required and re-secure the deck to structure. It is estimated that up to 35% of the structural deck may require repair. D.��� Contractor shall repair/modify parapet wall supports as required to prepare them to accept EPDM. E.��� Existing gutters shall be retained for reuse. F.��� Contractor shall install a minimum of 3� of fully adhered poly ISO insulation, topped by cover-board. Insulation and cover-board is to provide positive drainage to the gravel stop edge. G.�� Contractor shall install fully adhered 90-mil EPDM membrane roof over. EPDM is to wrap over parapet cap, turn down the vertical face of the building envelope and extend 3� down the face of the building. EPDM to turn down vertical face of building envelope and extend 3� down face of building at the location of the gravel stop edge. H.��� New fascia to be installed over EPDM. Transitions between materials shall be flashed and sealed as applicable. I.����� Provide drip edge, counter flashing, and fascia as required. J.��� Contractor shall inspect, clean, repair and test roof drainage system components, as required. K.��� Following repair contractor shall complete a water test, and provide a report as proof that the roofing assembly is preventing water from infiltrating the building. L.��� Contractor shall provide a warranty for the repair. Warranty period shall be in line with the manufacturers warranty guidelines. Repair methods shall target a 20 year warranty period. Please see attached Solicitation,�SOW, design standards and drawings�for complete detail. A pre-proposal site visit for this project will be held on 18 August 2020 at 1:00 pm EST. All interested contractors are HIGHLY encouraged to attend. �
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/9fe8a8d35dcb45d5ad76faa9834260c1/view)
 
Place of Performance
Address: Selfridge ANGB, MI 48045, USA
Zip Code: 48045
Country: USA
 
Record
SN05808524-F 20200925/200923230217 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.