SOLICITATION NOTICE
58 -- 58--LASER,SOLID STATE - AND OTHER REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF
- Notice Date
- 11/6/2020 3:10:07 AM
- Notice Type
- Solicitation
- NAICS
- 333999
— All Other Miscellaneous General Purpose Machinery Manufacturing
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT PHILADELPHIA PA 19111-5098 USA
- ZIP Code
- 19111-5098
- Solicitation Number
- N0038321QD017
- Response Due
- 12/7/2020 12:00:00 AM
- Archive Date
- 12/22/2020
- Point of Contact
- Telephone: 2156972849
- E-Mail Address
-
TAHSEEN.FIROZ1@NAVY.MIL
(TAHSEEN.FIROZ1@NAVY.MIL)
- Awardee
- null
- Description
- CONTACT INFORMATION|4|N721.10|B1E|215-697-2849|tahseen.firoz1@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Invoice and Receiving Report (Combo) Type||Cognizant DFAS|N00383|Cognizant DCMA|Cognizant DCMA|See Schedule|Source||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|334511|1250|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||DO-A7| EVALUATION CRITERIA AND BASIS FOR AWARD -|1|| This requirement is for the repair of the items herein this solicitation. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be ""issued"" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to ""issue"" contractual documents as detailed herein. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: LASER,SOLID STATE ;5860-01-456-5823; NSN , ;RLG0109-01; Part Number, Shall be performed IAW: LASER,SOLID STATE ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term ""contract"" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: LASER,SOLID STATE ;RLG0109-01; P/N, ;5860-01-456-5823; NSN, ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the ""prime contractor"" or the ""actual manufacturer"" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the ""Government Designated Agency"" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. LASER,SOLID STATE ;RAYTHEON TECHNICAL SERVICES; Company Name , ;INDIANAPOLIS IND 46219; Address , ;072E5; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ block 6: forward additional copy to aso code cited in block 10.A on page 1. TERMS AND CONDITIONS FOR REPAIR: -ACCEPTANCE TESTING SHALL BE IAW DWG. FAT6629 - RTSC IS PRPOSING TO SHIP TEN UNITS ONE HUNDRED AND EIGHTY (180) DAYS AFTER INDUCTION - RAYTHEON REQUEST MINOR WAIVER/DEVIATION AUTHORITY OVER AND ABOVE - AN ITEM SENT RAYTHEON SHALL BE CONSIDERED TO REQUIRE OVER AND ABOVE REPAIR EFFORT IF THE REPAIR REQUIRED IS HIGHLY UNUSAUL, NOT THE TYPE OF REPAIR ANTICIPATED AS A RESULT OF NORMAL OPERATIONS OF THE ITEM AND NOT INCLUDED IN THE CONTRACT PRICING DUE TO THE NATURE OR SCOPE OF THE REPAIR NEEDED FOR THE PARTICULAR ITEM. THERFORE, REPAIR OAR ITEMS MAY BE SUBJECT TO EQUITABLE ADJUSTMENT RAYTHEON SHALL OBTAIN WRITTEN CONCURRENCE FROM DCMA FOR ALL UNITS DETERMINEDBY RAYTHEON TO REQUIRE OAR EFFORT. ALL SUCH OAR DETERMINATIONS, INCLUDING THE BASIS FOR THE DETERMINATION, THE REPAIR REQUIRED, THE PROPOSED PRICE TO REPAIR AND THE DCMA WRITTEN CONCURRENCE, SHALL BE PROVIDED BY RAYTHEON TO THE PCO PRIOR TO UNDERTAKING REPAIR OF THE OAR SCOPE OF WORK. AFTER RECEIPT OF THE RE QUIRED DOCUMENTATION, THE PCO SHALL PROVIDE RAYTHEON DISPOSITION INSTRUCTIONS OR CONTRACTUAL AUTHORITY FOR REPAIR OF THE ITEM. ANY DISPOSAL ORDERED SHALL BE PERFORMED BY RAYTHEON IAW ALL APPLICABLE REGULATIONS AND RAYTHEON APPROVED GOVERNMENT PROPERTY DISPOSAL PROCEDURES. BEYOND ECONOMICAL REPAIR (BER) An item is BER if the estimated cost of the repair will exceed 80% of the replacement value current at the time of award of the delivery order. Procedures. Items determined BER will be separately priced. All such determinations, including the basis for the determination, the repair required the proposed price to repair shall be provided by Raytheon to NAVSUP. After receipt of the required documentation, NAVSUP shall provide Raytheon disposition instructions or contractual authority for repair of the item. Raytheon is notauthorized to proceed with the repair until notification is received from NAVSUP. Any disposal ordered shall be performed by Raytheon iaw anyinstruction fromNAVSUP. All items declared BER with a do not repair disposition shall be separately priced. Actual costs including support allocation will be submitted by Raytheon and a modification will be required to complete the item. The authorizedprice for a BER will equal actual costs incurred plus fee, but will not exceedthe definitized price, and Raytheon is encouraged to identify BER items assoonas possible in the repair process. BEYOND PHYSICL REPAIR (BPR) An item is BPR when the item is not capable of being repaired iaw the SOW due to the extent of physical damage, which includes visible conditions such as crushed or burned items. BPR also includes items that are not visibly damaged, including items where multiple repair loops cannot restore the item to RFI condition, or if the required parts are no longer available. Procedures. All such determinations, including the basis for the determination shall be provided by Raytheon to NAVSUP. After receipt of the required documention, NAVSUP shall provide Raytheon disposition instructions. Any disposal ordered shall be performed by Raytheon iaw all applicable property disposal procedures. Actual costs including support allocation will be submitted by Raytheon anda modification will be required to complete the item. The authorized price for a BPR will equal actual costs incurred plus fee, but will not exceed the definitized price, and Raytheon is encouraged to identify BPR items as soon aspossible in the repair process. OBSOLESCENCE - When Raytheon discovers potential or actual obsolescence,Raytheon shall notify NAVSUP Upon receipt of an Engineering Change Proposal or Request for Deviations.NAVSUpwill determine the appropriate course of action and will give written directionto Raytheon within 30 days. If no written direction is provided to Raytheonwithin 30 days,Raytheon will consider their recommended approach to be approvedAny identified cost savings/increases may be subject to an equitable adjustmentment in contract price. If the obsolescence causes an actual delay, NAVSUP agrees to work with Raytheon to determine the appropriate impact to the contract schedule and contract cost. CANNIBALIZATION - Once an item has been determined to be excess, BER or BPR by the Government the Contractor may cannibalize any serviceable items within the excess, BERd or BPRd units to complete the repair of another unit. Also, in order to expedite a repair, the Contractor may cannibalize by removingand utilizing (swapping) any serviceable items (i.e., SRAs) and components fromanother unit that is inducted for repair under an open delivery order includingbetween (N00383-13-G-005D, N00383-13-G-006D and N00383-07-G-008D (hereinafter called a donor unit). Cannibalization in order to expedite repairs is authorized provided the following conditions are met: - Unit interchanging of component(s) does not result in a degradation of performance of the repaired donor unit. - The removal of the component(s) shall not result in the donor unit becoming beyond economical repair or beyond physical repair. - The serviceable items and components removed from the donor unit shall be replaced such that the donor unit is repaired in accordance with all of the terms and conditions (i.e., price, specifications and schedule) of the SOW. The Contractor shall maintain records of any donor units that include: - The components (part number and serial number, if applicable) removed from the unit. The date the component(s) were removed. - The asset (part number and serial number, if applicable) receiving the component(s). - The date the components were replaced in the donor unit. These records will be made available for the Government review upon request. PARTS SUBSTITUTION - Items being purchased that are not included or identified on the OEM drawing package may be used as long as the items do not affect form, fit, function or testability or interface may be substituted as the Contractors risk. Parts under the same NSN as shown on the DLA MCRL that do not affect form, fit, function,testability or interface may be substituted at the Contactors risk. Parts identified to the originally specified parts except for improvements in temperature coefficient, temperature operating, storage range, vibration grade, tolerance, and reliability levels may be substituted at the Contractors risk. Contractor shall document for traceability alternate part numbers or material used in the repair process. Sub-assembly parts substitution; Due to obsolescence, sub-assembly parts substitution is permitted for all components controlled by a Source Control Document (SCD) for parts wholly contained with the (sealed) assembly. A complex component controlled by a SCD may substitute equivalent sub-assemblies and/or components within the complex component. Component or parts substitution shall not impact; compliance to requirementsof the SCD, affect form, fit, function, testability, interface and interchangea bility. If parts substitution will result in an upgraded configuration to the SCD controlled component, the contractor shall provide notice to the PCO priorto performing the upgrade with the following information: As received SCD component part number/serial number, upgraded (reason justifying the upgrade) to Navyapproved configuration (to be delivered) SCD component part number/serial number Any upgrade to the new configuration will not impact or affect form, fit,function, testability, interface and interchangeability. Contractor shall document for traceability alternate part numbers ormaterial used in the repair process. 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: LASER,SOLID STATE ;5860-01-456-5828; NSN , ;RLG0106-01; Part Number, Shall be performed IAW: LASER,SOLID STATE ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS.; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term ""contract"" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: LASER,SOLID STATE ;RLG0106-01; P/N, ;5860-01-456-5828; NSN, ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS.; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification,repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the ""prime contractor"" or the ""actual manufacturer"" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the ""Government Designated Agency"" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proce...
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/9828302fd8804fed80da0c09e5db095a/view)
- Record
- SN05848405-F 20201108/201106230145 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |