Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 02, 2021 SAM #6974
SOLICITATION NOTICE

99 -- FITTING,HOLD BACK,A

Notice Date
12/31/2020 3:10:59 AM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
DLA AVIATION AT PHILADELPHIA, PA PHILADELPHIA PA 19111-5098 USA
 
ZIP Code
19111-5098
 
Solicitation Number
SPRPA120QZ242
 
Response Due
12/31/2020 12:00:00 AM
 
Archive Date
01/15/2021
 
Point of Contact
Telephone: 2157373962
 
E-Mail Address
KENNETH.LAUBER@DLA.MIL
(KENNETH.LAUBER@DLA.MIL)
 
Awardee
null
 
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|TBD||TBD|TBD|TBD|TBD|TBD|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|336413|1,250|||||||||||| REPRESENTATION REGARDING CERTIAN TELECOMMUNICATIONS AND VIDEO SUREILLANCESERVICES OR EQUIPMENT (AUG 2019))|2||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||| EVALUATION CRITERIA AND BASIS FOR AWARD -|1|| REF: JAIMIE TIERNEY (NAVSUP WSS) EMAIL DTD 12/30/2020 THIS AMENDMENT IS ISSUED TO UPDATE THE ""SHIP TO"" INFORMATION BY CHANGING THE SUBCLIN STRUCTURE AS FOLLOWS: SUBCLIN 0001AA IS DELETED IN ITS ENTIRETY SUBCLIN 0001AB IS DELETED IN ITS ENTIRETY SUBCLIN 0001AC NO CHANGE SUBCLIN 0001AD IS INCORPORATED AT QUANTITY 14 EACH; SHIP TO CODE: W6262T ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. THIS AMENDMENT IS ISSUED TO INCORPORATE THE FOLLOWING CLAUSES: 52.204-24 52.204-25 52.204-26 252.204-7016 ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. This solicitation is being issued under SEPA Authority. For Critical Safety Items (CSI), DFARS clause 252.209-7010, Identification of Critical Safety Items, is incorporated by reference. For items for which Government inspection and acceptance will be conducted at the source, DLAD clause 52.246-9004, Product Verification Testing, is incorporated by reference. As applicable, DFARS clause 252.242-7005, Contractor Business Systems, is incorporated by reference. Please email copy of proposal to kenneth.lauber@dla.mil Drawings are not available. 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.4 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.5 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.6 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.7 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.8 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.9 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;30003; ) ;2-7938-5; , Revision ;H; and all details and specifications referenced therein. 1.10 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.11 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=MPR 520 |80020| -| |A| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE 4.1 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;ALL ACTUAL DIMENSIONS OF ANY MAJOR OR CRITICAL CHARACTERISTICS SHALL BE RECORDED. THE AMBEINT TEMPERATURE SHALL BE RECORDED AT TIME MEASUREMENTS ARE TAKEN. CERTIFICATIONS TO BE ON FILE FOR MINIMUM OF SEVEN YEARS AFTER DELIVERY OF CONTRACT.; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.2 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;ROY JANNEY NAWC QA (732) 323-1381; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 4.3 CRITICAL MANUFACTURING PROCESSES ( ;APPLIES; ) HEAT TREAT ( ; ; ) WELDING ( ;APPLIES; ) CADMIUM PLATING ( ;APPLIES; ) ENGINEERING CHROME PLATING ( ; ; ) NICKEL CHROME PLATING ( ; ; ) CASTING(S) ( ; ; ) FORGING(S) ( ;APPLIES; ) MPR (MATERIAL PROCESSING REQUIREMENTS) 4.4 SPECIAL INSPECTION REQUIREMENTS ( ;APPLIES; ) MAGNETIC PARTICLE INSPECTION ( ;APPLIES; ) SURFACE INSPECTION ( ;APPLIES; ) PENETRANT INSPECTION ( ; ; ) RADIOGRAPHIC INSPECTION ( ; ; ) ULTRSONIC INSPECTION ( ; ; ) HIGH SHOCK TEST ( ; ; ) MECHANICAL VIBRATION TEST 4.5 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;ROY JANNEY QA REP AT FAX (732) 323-4986; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS A ALRE CRITICAL SAFETY ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: (19-10071): THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS ""CRITICAL"" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED & BEEN APPROVED WILL BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION ANY COMPANY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION. \ DATE OF FIRST SUBMISSION=ASREQ block 6: forward additional copy to aso code cited in block 10.A on page 1. RECEIPT INSPECTION: RECEIPT INSPECTION AND CERTIFICATE OF SUB-COMPONENTS: ^THE FOLLOWING CRITICAL SAFETY ITEMS SHALL BE RECEIPT INSPECTED AND CERTIFIED AT LAKEHURST: -COLLET HEAD P/N 7-1668-3 -COLLET COLLAR P/N 7-0508-3 -LOCK RING SEAT P/N 7-0517-2 -LOAD RELEASE SLECCVE P/N 7-0518-2-CYLINDER P/N 7-0522-2 -CYLINDER P/N 7-0522-2-STRAIN BAR P/N 7-0529-3 -LOAD TRANSFER SLEEVE P/N 7-0533-3-ROD END CONNECTOR 7-0545-2 -THRUST BEARING P/N 7-0621-1 -PRIMARY LOCK SEGMENT P/N 7-0622-2 -SECONDARY LOCK SEGMENT 7-0623-2 -PARTS WILL BE CERTIFIED, MARKED AND RETURNED TO SUPPLIER FOR PAINTING (IF RE QUIRED) ASSEMBLY B.DOCUMENTS: -THE CONTRACTOR SHALL ALSO PROVIDE ALL CERTIFICATIONS, COPIES OF ANY CMM PRINT OUTS,TEST REPORTS, AND ALL IN-PROCESS INSPECTION DOCUMENTS NEEDED TO SUBSTANT IATE PRODUCT QUALITY FOR CSIs IDENTIFIED HEREIN (P/N 7-1668-3,P/N 7-0508-3,P/N 7-0517-2,P/N 7-0518-2, P/N 7-0522-2, 7-0529-3, P/N 7-0533-3, P/N 7-0545-2, P/N 7-0621-1,P/N 7-0622-2, AND P/N 7-0623-2).THE DATA SHALL BE PROVIDED CONCURRENT LY WITH THE RESPECTIVE HARDWARE DELIVERIES ASSOCIATED WITH THE CERTIFICATION PROCESS AND FORWARDED TO THE NAVAL AIR WARFARE CENTER AIRCRAFT DIVISION, CODE 4.8.8.8 B148-2, ROUTE 547, LAKEHURST, NJ 08733-5125 9 ATTEN: PAUL CAMPOS). RESULTS OF HEAT TREAT SAMPLES IAW MPR 520 FOR P/N's 7-0617-2, 7-0533-3,7-0622-2AND 7-0623-2 SHALL BE SUBMITTED CONCURRENTLY WITH THESE PARTS TO NAVAIR LAKEHURST FOR RECEIPT INSPECTION AND CERTIFICATION OF SUB-COMPONENTS SUBSTANTIATE PART QUALITY RECEIPT INSPECTION AND CERTIFICATION OF THE TOP ASSEMBLY -THE RECEIPT INSEPCTION AND CERTIFICATION OF THE TOP ASSEMBLY SHALL OCCUR DURING THE FINAL INSPECTION. THIS INSPECTION SHALL INCLUDE WITNESS OF FINAL SETTINGS IAW NOTE 17,18,AND 19 PER PARTS LIST (PL) 2-7938, CONTRACTOR ASSIST AND PART MARKING AS SPECIFIED APPLIES. CONTRACTOR ASSIST AND PART MARKING a. THE CONTRACTOR SHALL ASSIST ON THE CONDUCT OF THE INSPECTIONS (BOTH FINAL AND INTERIM) REQUIRED THAT ARE NECESSARY TO CERTIFY ITEMS SPECIFIED HEREIN. THE CONTRACTOR SHALL PROVIDE ADEQUATE FACILITIES,INSPECTION EQUIPMENT, AND SKILLED PERSONNEL,TO SUPPORT THE NAVAIR INSPECTOR IN THE CONDUCT OF THE INTERIM INSPECTIONS. THE CONTRACTOR SHALL PROVIDE GAUGES, TOOLS, FIXTURES AND JIGS NECESSARY TO PERFORM THE INSPECTIONS. THE CONTRACTOR SHALL ALSO PROVIDE SUFFIENT RIGGING/MATERIAL HANDLING SERVICES AND MANPOWER TO SETUP/CONFIGURE/OPERATE EQUIPMENT & MACHINES USED TO ACCOMPLISH THE INSPECTION TASK.THIS CONTRACTOR ASSIST REQUIREMENTS SHALL BE APPLICABLE TO 100% OF THE PRODUCTION QUANTITIES. AS PART OF THE MRI PROCESS, THE NAVAIR QA REPRESENTATIVEWILL PROVIDE, IN WRITING, A CERTIFICATION NUMBER ALONG WITH DIRECTION FOR MARKING THE CRITICAL SAFETY ITEMS (CSI). DELIVERY SCHEDULE: -LOAD RELAEASE SLEEVE (P/N 7-0518-2) SHALL BE DELIVERED AT MAXIMUM RATE OF 10 UNITS PER MONTH. COLLET HEAD (P/N 7-1668-3) SHALL BE DELIVERED AT A MAXIMUM RATE OF 5 UNITS PER MONTH -COLLET COLLAR (P/N 7-0508-3) SHALL BE DELIVERED AT A MAXIMUM RATE OF 10 UNITS PER MONTH -LOCK RING SEAT (P/N 7-0517-2) SHALL BE DELIVERED AT A MAXIMUM RATER OF 10 UNITS PER MONTH -CYLINDER (P/N 7-0522-2) SHALL BE DELIVERED AT A MAXIMUM RATE OF 10 UNITS PER MONTH -STRAIN BAR (7-0529-3) SHALL BE DELIVERED AT A MAXIMUM RATE OF 5 UNITS PER MONTH -LOAD TRANSFER SLEEVE (P/N 7-0533-3) SHALL BE DELIVERED AT A MAXIMUM RATE OF 10 UNITS PER MONTH -ROD END CONNECTOR (P/N 7-0545-2) SHALL BE DELIVERED AT A MAXIMUM RATE OF 10 UNITS PER MONTH -THRUST BEARING (P/N 7-0621-1) SHALL BE DELIVERED AT A MAXIMUM RATE OF 10 PRIMARY LOCK SEGMENT (P/N 7-0622-2) SHALL BE DELIVERED AT A MAXIMUM RATE OF 30 SECONDARY LOCK SEGMENT (P/N 7-0623-2) SHALL BE DELIVERED AT A MAXIMUM RATE OF 3 UNITS PER MONTH TURNAROUND TIME: -FOR PURPOSES OF PLANNING, ESTIMATED EVALUATION TIME FOR THE LISTED IN SECTION VI IS 30 DAYS AFTER DATE OF RECEIPT UNIQUE REQUIREMENTS: FOR COLLET HEAD P/N 7-1668-3, COLLET COLLAR P/N 7-0508-3, LOCK RING SEAT P/N 7-0517-2, LOAD RELEASE SLEEVE P/N 7-0518-2, CYLINDER P/N 7-0522-2, STRAIN BAR P/N 7-0529-3, LOAD TRANSFER SLEEVE P/N 7-0533-3, ROD END CONNECTOR 7-0545-2, THRUST BEARING P/N 7-0621-1, PRIMARY LOCK SEGMENT P/N 7-0622-2, AND SECONDARY LOCK SEGMENTP/N 7-0623-2 ANY CHANGE IN THE APPROVED MANUFACTURING PROCESS OR SUBCONTRACTOR'S MANUFACTURING PROCESS SHALL FIRST BE APPROVED BY NAWCADLKE CODE4.8.2.1 THROUGH AN ENGINEERING CHANGE PROPOSAL REQUEST RECEIPT INSPECTION AND CERTIFICATION OF SUB COMPONENTS: DATA REQUIREMENTS: -COPIES OF ALL APPROVED REQUEST FOR DEVIATIONS AND WAIVERS ALL APPROVED MRB ACTIONS -CHROME PLATE PER DWGS. 7-1668,7-0508,7-0522,7-0529, AND 7-0621 -CADIUM PLATING PER DWGS. 7-1668,7-0508,7-0522,7-0529- AND 7-0545 -SHOT PEENED PER DWGS. 7-1668,7-0508,7-0522,7-0529,7-0545, AND 7-0621 -HARDNESS TEST PER DWGS. 7-0517,7-0622, AND 7-0623 -STRESS RELIEF PER DWGS. 7-1668,7-0508,7-0518,7-0545, 7-0517 AND 7-0621 -MAGNETIC PARTICLE INSPECTION PER DWGS. 7-1668,7-0508,7-0517,7-0518,7-0522, 7-0529,7-0529,7-0533,7-0545,7-0621,7-0622,AND 7-0623 -HEAT TREAT PER DWGS. 7-1668,7-0508,7-0518,7-0522,7-0529,7-0545, AND 7-0621 -DIMENSIONAL INSPECTION PER DWGS. 7-1668,7-0517,7-0518,7-0522,7-0529,7-0533, 7-0545,7-0621,7-0622, AND 7-0623 -MATERIAL CERTIFICATION PER DWGS. 7-1668,7-0508,7-0517,7-0518,7-0522,7-0529 7-0533,7-0545,7-0621, 7-0622 AND 7-0623 -CARBOURIZE IAW MPR 520 PER DWGS. 7-0517,7-0533,7-0622, AND 7-0623 -GLASS HEAD PEEN PER DWG. 7-0529 -TEMPER ETCH INSPECTION PER DWGS. 7-1668,7-0508, AND 7-0545 -DRY FILM LUBRICANT PER DWGS. 7-1668 -PASSIVATE PER DWGS 7-0517 AND 7-0533 RECEIPT INSPECTION AND CERTIFICATION OF TOP ASSEMBLY DATA REQUIREMENTS: a. Copies of all approved Request for Deviations, Request for Wavers and all approved MRB actions b. Functional test IAW ATP 4-7938 c. Final settings IAW ATP 4-7938 d. Torque settings per Parts List (PL) 2-7938 and Drawing 7-0530 e. Dimensional/alignment settings per PL 2-7938 f. Chrome plate per Drawings 7-1668, 7-0508, 7-0522, 7-0529, 7-0620,and 7-0621 g. Cadmium plate per Drawings 7-1668, 7-0508,7-0522,7-0529, 7-0545,and 7-0546 h. Shot peen per Drawings 7-1668, 7-0508, 7-0522, 7-0529, 7-0545, and 7-0621 i. Hardness test per Drawings 7-0622, and 7-0623 j. Stress relief per Drawings 7-1668, 7-0508, 7-0518, -0538,7-0545, and 7-0621 k. Magnetic particle inspection per Drawings 7-0508,7-0514,7-0518,7-0522, 7- 7-0528, 7-0529,7-0530,7-0533,7-0538,7-0539,7-0545,7-0620,7-0621,7-0622,7-0623, and 7-2334 I. Heat treat per Drawings 7-1668, 7-0508, 7-0514, 7-0518, 7-0522, 7-0523,7-05287-0529, 7-0530, 7-0538, 7-0539, 7-0540, 7-0541, 7-0545, 7-0546, 7-0547,7-0620, 7-0621 and 7-2334 m. Dimensional inspection per Drawings 7-1668, 7-0508, 7-0509, 7-0511, 7-0514, 7-0518, 7-0519, 7-0520, 7-0521, 7-0522, 7-0523, 7-0524, 7-0525, 7-0526, 7-0527,7-0529, 7-0530, 7-0533, 7-0535, 7-0538, 7-0539, 7-0540, 7-0541, 7-0542, 7-0543,7-0545, 7-0546, 7-0547, 7-0548, 7-0581, 7-0620, 7-0621, 7-0622, 7-0623, 7-0629,7-0517,7-0528,7-0544, 6-0140, 7-0140, 7-0545, 7-0547, 7-0548, 7-0581, 7-0620,7-0623, 7-0629, 6-0140,6-0141,6-0251,6-0252,7-2334 AND 7-2723 n. Material certification per Drawings 7-1668, 7-0508, 7-0509, 7-0511, 7-0514, 0520, 7-0521, 7-0522, 7-0523, 7-0524, 7-0525, 7-0526, 7-0527, 7-0528, 7-0529, 7-0530, 7-0533, 7-0535, 7-0538, 7-0539, 7-0540, 7-0541, 7-0542, 7-0543, 7-544,7-0546, 7-0547, 7-0548, 7-0581, 7-0620, 7-0621, 7-0622, 7-0623, 7-0629, 6-0140,7-0517, 7-0519, 7-0529, 7-0545, 7-0141, 7-0545, 6-0141, 6-0251, 6-0252, 7-2334, and 7-2723 o. Passivate per Drawings 7-0511, 7-0519, 7-0520, 7-0521, 7-0523, 7-0524, 7-0527-0528, 7-0530, 7-0535, 7-0539, 7-0540, 7-0541, 7-0543, 7-0546, 7-0548, 7-0725, 7-0527, 7-0542 and 7-2334 p.Penetrant inspection per Drawings 7-0523, 7-0526, 7-0540, 7-0541, 7-0542, 7-0546, and 7-0581 q. Anodize per Drawings 7-0629, and 7-2723 r. Sand Blast per Drawing 7-0540 s. Glass bead blast per Drawing 7-0546. t. Glass bead peen per Drawing 7-0529 u. Paint per PL 2-7938; and Drawings 7-1668, 7-0508, 7-0529, 7-0530, 7-0539, 7-0629, 7-2334 and 7-2723 v. Temper etch inspection per Drawings 7-1668, 7-0508, and 7-0545 w. Dry film lubricant per Drawing 7-1668. x. Lubricant per Drawing 2-7938. y. Sealant per Drawing 2-7938. z. Carburize IAW MPR 520 per Drawings 7-0517, 7-0533, 7-0622, and 7-0623 . aa.Urethane casting per Drawing 7-0539 Receipt inspection will be completed concurrently with final inspection at contractors facility DATE OF FIRST SUBMISSION=ASREQ Block 6: Forward additonal copy to ASO code cited in block 10.A on page 1. MANUFACTURING PLAN: MANUFACTURING PLANS ONLY NEED TO BE SUBMITTED IF DIFFERENT THAN MANUFACTURING PLAN LISTED BELOW: 1. Load Release Sleeve (P/N 7-0518-2),Triumph Plan approved by NAVAIR (2/9/15 UPDATED SEP 2019 2. Collet Head (P/N 7-1668-3 ), Triumph Plan approved by NAVAIR (5/18/17) UPDATED JAN 2020 3. Collet Collar (P/N 7-0508-3), Triumph Plan approved by NAVAIR (4/15/15) 4. Lock Ring Seat (P/N 7-0517-2), GE Aviation Syst. Plan approved by NAVAIR (4/29/14) 5.Cylinder (P/N 7-0522-2 ), GE Aviation Syst.Plan approved by NAVAIR (3/19/15 6. Strain Bar (P/N 7-0529-3), Triumph Plan approved by NAVAIR (12/30/14) UPDATED DEC 2019 7. Load Transfer Sleeve (P/N 7-0533-3),Triumph Plan approved by NAVAIR 11/29/168. Rod End Connector (P/N 7-0545-2), Triumph Plan approved by NAVAIR (2/18/15) 9. Thrust Bearing (P/N 7-0621-1), Triumph Plan approved by NAVAIR (4/27/16 UPDATED FEB 2020 10. Primary Lock Segment (P/N 7-0622-2), GE Aviation Syst. Plan approved by NAVAIR 10/23/15) 11. Secondary Lock Segment (P/N 7-0623-2),Triumph Actuation Systems-Yakima (TAS-Y) Plan approved by NAVAIR (4/29/16) Tailor DI-MISC-80074 as follows: a. Delete 10.2.1.3 b. Delete 10.2.2.3.1 c. Delete 10.2.3.2 d. Delete 10.2.3.6 e. Delete 10.2.3.7.2 f. Delete 10.2.3.7.3 g. Delete 10.2.3.7.4 h. Delete 10.2.3.7.5 i. Delete 10.2.6 The manufacturing plan shall as a minimum include the following: a. Documentation of all required manufacturing processes b. All required equipment c. All manufacturing process sheets d. Identify all subcontractor manufacturing processes and associated subcontractor. e. Provide any necessary personnel certification f. Plan shall be submitted for P/N 7-0518-2, 7-1668-3, 7-0508-3, 7-0517-2, 7-0522-2, 7-0529-3, 7-0533-3, 7-0545-2, 7-0621-1, 7-0622-2, and 7-0623-2 DATE OF FIRST SUBMISSION=ASREQ Block 6: Forward additonal copy to ASO code cited in block 10.A on page 1. Mil-STD-1520C Material Review Board Procedure(MRB) that describes a process for the review of minor non-conformances per MIL-STD-1520C except that the provisions for Government participation and approval as specified insection 4.7 shall be executed concurrently with the Contractors review and disposition process stated in para 4.5.1. Government participation shall include NAVAIR In-Service Engineering Code 4.8.2.1 and the DCMA Quality Assurance Representative. NAVAIR participation shall be in the concurrent review and subsequent approval/disapproval of submitted minor non-conformances whereby, as part of their MRB process, the contractor will submit their requests to NAWCADLKE via email to the following email address:LKHR_ENGRG_REQUESTS@NAVY.MIL
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/a4f4094af2fc4c858a0d13ab2d20d7db/view)
 
Record
SN05883561-F 20210102/201231230059 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.