Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 07, 2021 SAM #6979
SOLICITATION NOTICE

16 -- Oxygen Regulator Parts Kit Multi NSN LTC Project

Notice Date
1/5/2021 10:12:46 AM
 
Notice Type
Presolicitation
 
Contracting Office
DLA AVIATION RICHMOND VA 23297 USA
 
ZIP Code
23297
 
Solicitation Number
SPE4A7-21-R-0224
 
Response Due
2/8/2021 2:00:00 PM
 
Archive Date
02/23/2021
 
Point of Contact
SAKENA THORNTON804-279-6653
 
E-Mail Address
SAKENA.THORNTON@DLA.MIL
(SAKENA.THORNTON@DLA.MIL)
 
Description
This is a Multi NSN LTC PROJECT for the following NSNs: NSN 1660-00-243-0392, CAGE 99251, P/N�9776301-10, Oxygen Regulator Parts Kit. NSN 1660-01-463-7140, CAGE 99251, P/N�1601331-1A, Oxygen Regulator, Parts Kit, Air Flow. NSN 1660-01-386-3809, CAGE 99251, P/N�1601311-1, Oxygen Regulator, Parts Kit. NSN 1660-01-339-2224, CAGE 99251, P/N�1601312-1, Oxygen Regulator, Overhaul Kit. All NSNs/P/Ns are sole source to Carleton Life Support, CAGE 99251. Specifications, plans, or drawings relating to this procurement described are not available and cannot be furnished by the Government.� Only Vendors who have access to the data or can provide traceability to the approved sources should bid.�� The solicitation will result in an indefinite quantity contract with one, three-year base period and�no option periods.� For NSN 1660-00-243-0392:� GM: 12 EACH; EAD: 46 EACH; CONTRACT MAXIMUM: 222 EACH For NSN 1660-01-463-7140: GM: 5 EACH; EAD: 18 EACH; CONTRACT MAXIMUM: 84 EACH For NSN 1660-01-386-3809: GM: 5 EACH; EAD: 18 EACH; CONTRACT MAXIMUM: 87 EACH For NSN 1660-01-339-2224: GM: 1 EACH; EAD:�3 EACH; CONTRACT MAXIMUM:�21 EACH The required production lead-time for all NSNs is 270 days after receipt of order (ARO).� Phased delivery is authorized and acceptable. FOB at�Origin with Inspection/acceptance at Origin.��Duration of contract period is 36 months.�� This requirement is an Unrestricted procurement, utilizing other than full and open competition.�All part are of critical application, configuration-controlled, and a higher-level contract quality inspection system is required.�Surge and Sustainment is not required for any of the parts. The final contract award decision may be based upon a combination of price, past performance, and other evaluation factors as described in the solicitation.� A copy of the solicitation will be available via the DLA Internet Bid Board System at https://www.dibbs.bsm.dla.mil/RFP on the issue date cited in the RFP.� Solicitations are in portable document format (PDF).� T download and view these documents, you will need the latest version of Adobe Acrobat Reader.� A paper copy of this solicitation will not be available to requestors.� The solicitation issue date is January 6, 2021.�
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/310e9d3ae1804f00a6cc79efd2f966d9/view)
 
Record
SN05885095-F 20210107/210105230111 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.