Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 16, 2021 SAM #6988
SOLICITATION NOTICE

Y -- Amendment 0001 - Construction of P-964 Shore to Ship Utilities, Bahrain

Notice Date
1/14/2021 8:22:53 AM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
W31R ENDIS MIDDLE EAST WINCHESTER VA 22604-1450 USA
 
ZIP Code
22604-1450
 
Solicitation Number
W912ER21R0001
 
Response Due
2/1/2021 1:00:00 PM
 
Archive Date
02/15/2021
 
Point of Contact
jeffrey Walker, Kenneth G. Baker
 
E-Mail Address
jeffrey.a.walker@usace.army.mil, kenneth.g.baker@usace.army.mil
(jeffrey.a.walker@usace.army.mil, kenneth.g.baker@usace.army.mil)
 
Description
14 January 2021:� Amendment 0001 (W912ER21R0001 Amendment 0001.pdf ) Published. 22 December 2020:� It was reported that the attachment titled ""P964 01 15 00.12 10 EXHIBIT A Exploration Data.pdf""� was corrupted and would not open.� This document was reloaded today. This is a D-B-B project and is referenced as P-964 Shore to Ship Utilities.  This requirement is to construct adequately sized and efficiently configured shore-to-ship based utility systems on NSA II. These dedicated shore-to-ship based utility systems will support forward deployed littoral combat ship (LCS) surface combatants, and be able to service compatible homeported, forward deployed, rotationally deployed, and visiting U.S. ships on extended leave at NSA Bahrain. This project constructs hotel service stations along the waterfront for shore-to-ship utility connections.� Constructs an electrical distribution system, pad mounted switchgear andfrequency converters along the waterfront to provide shore-to-ship electrical utility services for ship connections. Constructs a single story addition to the existing Consolidated Utility Building. The addition will provide space for the addition of a third reverse osmosis plant and chemical storage. Constructs a single story high-bay storage facility for the utilitysystem. The building consists of open storage with racks for the efficient storage of power cable spools, piping, hoses, tools and equipment. Architectural systems include concrete masonry unit (CMU) walls, standing seam metal roof, insulated metal panel siding, overhead doors, translucent panels for daylighting. Paving and site improvements include bases and sub-bases, pavement, roadways, equipment pads for frequency converters and generator, screen walls around the backup generator, equipment sunshades over the frequency converters and an above ground fuel tank. Electrical utilities include automatic transfer switch with weather enclosure, transformers, diesel backup generator with fuel storage, telecommunications and advance metering. Mechanical utilities will include potable water distribution system, reverse osmosis package water treatment skid, sanitary sewer distribution systems with pump stations, industrial waste ship hotel connections and advanced metering.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/37224e4e3c0943ceb99d28e5db421d5e/view)
 
Place of Performance
Address: BHR
Country: BHR
 
Record
SN05892361-F 20210116/210114230107 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.