SOLICITATION NOTICE
15 -- 15--TANK,FUEL,AIRCRAFT
- Notice Date
- 1/27/2021 3:13:27 AM
- Notice Type
- Solicitation
- NAICS
- 333999
— All Other Miscellaneous General Purpose Machinery Manufacturing
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT PHILADELPHIA PA 19111-5098 USA
- ZIP Code
- 19111-5098
- Solicitation Number
- N0038321RH226
- Response Due
- 2/22/2021 12:00:00 AM
- Archive Date
- 03/09/2021
- Point of Contact
- Telephone: 2156974331
- E-Mail Address
-
KYLIE.WALKER@NAVY.MIL
(KYLIE.WALKER@NAVY.MIL)
- Description
- ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| FMS DELIVERY AND SHIPPING INSTRUCTIONS|3|||N52211.42| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT COMBO||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (JUN 2020)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|45 DAYS FROM DETECTION OF DEFECT||||| SMALL BUSINESS SUBCONTRACTING PLAN (JUN 2020)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (FEB 2019)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|336413|1250|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| EVALUATION OF FIRST ARTICLE TESTING|3|||| This amendment is being issued for clarification purposes. This requirement isbeing issued sole source to Meggitt (56221) per the Single Vendor IntegrityLetter (SVI) submitted by the country. All other terms and conditions remain the same. First Article Testing (FAT) is a requirement. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be ""issued"" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to ""issue"" contractual documents asdetailed herein. Early and incremental deliveries accepted. 1. SCOPE 1.1 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;320-4-49755-101,MEGGITT (ROCKMART) INC CAGE(56221)LATEST REV; drawing number ( ; 320-4-49755-101,MEGGITT (ROCKMART) INC CAGE(56221)LATEST REV; ) ; 320-4-49755-101,MEGGITT (ROCKMART) INC CAGE(56221)LATEST REV; , Revision ; 320-4-49755-101,MEGGITT (ROCKMART) INC CAGE(56221)LATEST REV; and all details and specifications referenced therein. 1.2 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE I. First Article Test (FAT) Requirements.The following requirements applyto AMFUEL tank four. The tests to be performed under the FAT approval clauseof the contract are:Conduct all testing required by AMFUEL Report 2122Rev M:F-18 Acceptance Test Procedure (ATP) non-self-sealing fuelcells with the exceptions.A Vacuum Bag Method Phenolphthalein Test shall be conducted on the fuel cell once all ATP testing has successfully been completed Folding: In lieu of folding the fuel cell at a temperature not less than 70? folding shall take place at 60-65? Folding: In addition to the test described in the ATP, after fuel cell is confirmed to be folded to the proper size,it shall remain folded for 30min then inspected per MIL-STD-801D.This test must be performed once prior to the final leakage test. II. Samples. The contractor shall present one (1) unit(s) of lot/item 0001 as specified in this contract.At least 45 days before First Article Testing, the contractor shall notify the PCO, in writing, so that the Navy may witness the testing. III. Testing Location and Estimated Lead-Time. No arrangements will be made for inspection of the sample(s) until the DCMA notifies the PCO that the contractor has inspected the sample and is 100% ready for inspectio by the Government team.The DCMA-QAR shall be present during the inspection team's visit to the manufacturing site to perform the FAT.IV. Test Report. The contractor shall prepare a FAT Report, which shall be in accordance with the requirements of ISO-9012 (Aerospace First Article Inspection Requirement), MIL-HDBK-831 or equivalent, and shall be submitted via the cognizant DCMA Contract Administration Office to the PCO. Disposition of First Article Test Sample(s).A.Sample(s) may be considered as production items under the contract providedthe sample(s) can be refurbished to Ready for Issue (RFI) condition and providethe sample(s) have inspection approval of the cognizant QAR. Sample(s) may beshipped as production items only after all other units required under the contract have been produced and are ready for shipment.B.The QAR shall provide comments on Form DD1222 which shall be forwarded with the FAT Report. The cognizant government inspecting activity shall issue a report accepting or rejecting the FAT sample(s). Final approval of the FAT Report is the responsibility of the PCO. Upon notification of approval/conditional approvalthe QAR shall provide disposition in the Wide-Area(WAWF) system or Form DD250 to indicate Government acceptance of the test report. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ UPON COMPLETION OF THE FIRST ARTICLE TEST.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/f7e8480d90cb452893244ee013de0c49/view)
- Record
- SN05901413-F 20210129/210127230114 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |