AWARD
99 -- Naval Operational Logistics Distribution Systems (NOLDS)
- Notice Date
- 2/1/2021 6:11:04 AM
- Notice Type
- Award Notice
- NAICS
- 541715
— Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- Contracting Office
- W6QK ACC-ORLANDO ORLANDO FL 32826-3224 USA
- ZIP Code
- 32826-3224
- Solicitation Number
- W900KK-21-9-0001
- Archive Date
- 02/13/2021
- Point of Contact
- NSTXL
- E-Mail Address
-
initiatives@nstxl.org
(initiatives@nstxl.org)
- Award Number
- W900KK-18-9-0005
- Award Date
- 01/29/2021
- Awardee
- DEFENSE ENERGY CENTER OF EXCELLENCE Arlington VA USA
- Award Amount
- 11477235.00
- Description
- On 29 January 2021, in accordance with 10 U.S. Code � 2371b, the Army Contracting Command � Orlando has awarded an Other Transaction Agreement (OTA) via the Training and Readiness Accelerator (TReX) for Prototype 2: Modular CONSOL Adapter Kit (MCAK), one of the eight possible Naval Operational Logistics Distribution Systems (NOLDS) prototype projects. A Request for Solutions for these efforts was issued through TReX on 18 June 2020, which resulted in the submittal of one response for MCAK. The prototype project was awarded�to Gryphon Technologies, L.C. located in Washington, DC. The total value of this prototype project, if all options are exercised, is $11,477,235.00. The MCAK is a modular refueling capability for US tankers and other fuel carrying commercial vessels to refuel the Navy�s Combat Logistics Force while underway at sea.� The scope of work for this effort includes concept design, prototype fabrication, and both land and sea testing. Upon successful completion of this prototype effort, the Government anticipates that a follow-on production effort may be awarded via either contract or transaction, without the use of competitive procedures if the participants in this transaction successfully complete the prototype project as awarded. The Government defines success as when the prototypes have been validated and is accepted by the Government. Further, the government reserves the right to determine part or all of the prototype project is successfully completed if the vendor shows a particularly favorable or unexpected result justifying the transition to production.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/3f5dab26018a4fedafb3136cc989cd1f/view)
- Record
- SN05904561-F 20210203/210201230115 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |