Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 03, 2021 SAM #7006
AWARD

99 -- Naval Operational Logistics Distribution Systems (NOLDS)

Notice Date
2/1/2021 6:11:04 AM
 
Notice Type
Award Notice
 
NAICS
541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
 
Contracting Office
W6QK ACC-ORLANDO ORLANDO FL 32826-3224 USA
 
ZIP Code
32826-3224
 
Solicitation Number
W900KK-21-9-0001
 
Archive Date
02/13/2021
 
Point of Contact
NSTXL
 
E-Mail Address
initiatives@nstxl.org
(initiatives@nstxl.org)
 
Award Number
W900KK-18-9-0005
 
Award Date
01/29/2021
 
Awardee
DEFENSE ENERGY CENTER OF EXCELLENCE Arlington VA USA
 
Award Amount
11477235.00
 
Description
On 29 January 2021, in accordance with 10 U.S. Code � 2371b, the Army Contracting Command � Orlando has awarded an Other Transaction Agreement (OTA) via the Training and Readiness Accelerator (TReX) for Prototype 2: Modular CONSOL Adapter Kit (MCAK), one of the eight possible Naval Operational Logistics Distribution Systems (NOLDS) prototype projects. A Request for Solutions for these efforts was issued through TReX on 18 June 2020, which resulted in the submittal of one response for MCAK. The prototype project was awarded�to Gryphon Technologies, L.C. located in Washington, DC. The total value of this prototype project, if all options are exercised, is $11,477,235.00. The MCAK is a modular refueling capability for US tankers and other fuel carrying commercial vessels to refuel the Navy�s Combat Logistics Force while underway at sea.� The scope of work for this effort includes concept design, prototype fabrication, and both land and sea testing. Upon successful completion of this prototype effort, the Government anticipates that a follow-on production effort may be awarded via either contract or transaction, without the use of competitive procedures if the participants in this transaction successfully complete the prototype project as awarded. The Government defines success as when the prototypes have been validated and is accepted by the Government. Further, the government reserves the right to determine part or all of the prototype project is successfully completed if the vendor shows a particularly favorable or unexpected result justifying the transition to production.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/3f5dab26018a4fedafb3136cc989cd1f/view)
 
Record
SN05904561-F 20210203/210201230115 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.