SPECIAL NOTICE
Z -- 589-19-102, Expand Chilled Water Lines B15 & B26
- Notice Date
- 2/1/2021 6:56:00 AM
- Notice Type
- Special Notice
- NAICS
- 238220
— Plumbing, Heating, and Air-Conditioning Contractors
- Contracting Office
- 255-NETWORK CONTRACT OFFICE 15 (36C255) LEAVENWORTH KS 66048 USA
- ZIP Code
- 66048
- Solicitation Number
- 36C25521R0045
- Archive Date
- 03/18/2021
- Point of Contact
- Contract Specialist, Matt Finley, Phone: 913-946-1141
- E-Mail Address
-
matthew.finley@va.gov
(matthew.finley@va.gov)
- Awardee
- null
- Description
- FBO NCO15 MATOC SUBCONTRACTING SPECIAL NOTICE THIS INFORMATION IS POSTED FOR SUBCONTRACTING OPPORTUNITIES ONLY. PROPOSALS WILL NOT BE CONSIDERED FROM ANY FIRMS OTHER THAN THE SIX (6) PREVIOUSLY SELECTED NCO15 HVAC CATEGORY I MATOC CONTRACTORS ONLY. NO SOLICITATION DOCUMENT WILL BE POSTED FOR THIS REQUIREMENT. THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THEREFORE, FAR 5.203 DOES NOT APPLY. IDIQ TASK ORDER FOR THE Project Number 589-18-910 Renovate 9 East HVAC at Kansas City, MO VAMC. The attached project requirements specifications are provided for informational purposes only. THE SIX (6) NCO15 CG CATEGORY I MATOC CONTRACTORS AND CURRENT CONTRACT NUMERS ARE LISTED BELOW: Contractor IDIQ Contract Number Company POC BKM Construction VA255-17-D-0103 Brent Motley bmotley@bkmconstructionllc.com admin@bkmconstructionllc.com LJBCO Group LLC VA255-17-D-0137 Lonnie Wilson/ Richie Sanders / Ashley Galetti lwilson@kutfconstruction.com richie@ljbco.net / Ashley@ljbco.net Utility Systems Solution, Inc VA255-17-D-0139 Addison Sander asander@us2inc.com Floyd Construction Corporation VA255-17-D-0140 Tarrance C. Floyd tfloyd1@floydconst.com Jett s Specialty Construction, LLC VA255-17-D-0141 Jeffrey Jett jjett@jettsspecialty.com Won Freedom Construction, LLC VA255-17-D-0142 Mitch Dallas - mitchd@wonfreedom.com Joe Vazquez - joev@vazquezcc.com SCOPE OF WORK: An extension of the existing chilled water loop is planned for the VA Medical Center in Kansas City, Missouri. The proposed piping extensions will originate from the east side of Building 26 and connect to the existing line on the east side of the parking lot that is located on the east side of Building 1. The contractor is required to maintain access of at least one lane of the perimeter road throughout the project, and phase work as necessary to ensure access is preserved. Several utility lines will need to be relocated(lowered). New chilled water pumps will be installed in Building #15 & #26. The chilled water systems for these buildings will be connected as secondary loops to the primary chilled water loop, all to be supplied chilled water by the central plant. Existing chillers and accessories will be taken offline and removed. The DDC controls for the secondary loops pumps will be controlled independently of the primary loop.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/54ceaa4cf85042e1b71567098c3cf58f/view)
- Record
- SN05904650-F 20210203/210201230116 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |