Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 05, 2021 SAM #7008
SOLICITATION NOTICE

J -- CGC JAMES TANK SOUNDING TUBE REPLACEMENT

Notice Date
2/3/2021 8:15:56 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
336611 — Ship Building and Repairing
 
Contracting Office
SFLC PROCUREMENT BRANCH 2(00085) ALAMEDA CA 94501 USA
 
ZIP Code
94501
 
Solicitation Number
70Z08521QP4575900
 
Response Due
2/8/2021 8:00:00 AM
 
Archive Date
02/23/2021
 
Point of Contact
Anthony J. Andaluz, Phone: 5106375980, BARRY MEYER, Phone: 5106375961
 
E-Mail Address
anthony.j.andaluz@uscg.mil, BARRY.MEYER@USCG.MIL
(anthony.j.andaluz@uscg.mil, BARRY.MEYER@USCG.MIL)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-84 dated Nov 1, 2015. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5. Past performance will be considered in the selection of the awarded vendor. PRIMARY POP: 15FEB2021-01MAR2021 TCTO_ TB2010_50600_RTK _0820_418 WORK ITEM 1:� Tank Sounding Tube, Replace 25FT PER TANK 1.� SCOPE 1.1 Intent.� This work item describes the requirements for the Contractor to replace existing carbon steel sounding tubes in tanks listed in Table 1 with 90-10 Copper Nickel piping and fittings. TABLE 1 � LIST OF TANKS TYPE OF STRUCTURE������� TANK NUMBER���� TLI NUMBER�������� TLI LOCATION����� APPROXIMATE LENGTH OF SOUNDING TUBE� (FEET) Oily Waste Holding�������������� 5-41-1-F OW-LT-001���������� 2-44-1���� 5 Aft Oily Waste������� 5-59-1-F OW-LT-004���������� 2-63-1���� 5 1.2 Government-furnished property. None. 2.� REFERENCES COAST GUARD DRAWINGS Coast Guard Drawing 418A-WMSL-506-001, Rev -, Overflow / Air Escapes Sounding Tubes Diagram Coast Guard Drawing 750-WMSL-485-001, Rev L, Sleeves � Pipe Structure Penetration (SP485000) Coast Guard Drawing 750-WMSL-506-015, Rev C, Overfl / Airescapes / Sounding Tubes Unit 2100 (ASC506210-Ae) Coast Guard Drawing 750-WMSL-506-016, Rev E, Ovrflw / Airescapes / Sounding Tubes Unit 2110 (ASC506211-Ae) Coast Guard Drawing 750-WMSL-506-020, Rev D, Overfl / Air Escapes / Sounding Tubes Unit 2200 (ASC506220-Ae) Coast Guard Drawing 750-WMSL-506-021, Rev C, Ovfl / Air Escapes / Sounding Tubes Unit 2210 (ASC506221-Ae) Coast Guard Drawing 750-WMSL-506-022, Rev B, Ovrflw / Airescapes / Sounding Tubes Unit 2220 (ASC506222-Ae) Coast Guard Drawing 750-WMSL-506-023, Rev C, Overflow / Air Escapes / Sounding Tubes Unit 2230 (ASC506223-Ae) Coast Guard Drawing 750-WMSL-506-025, Rev C, Ovfl / Air Escapes / Sounding Tubes Unit 2300 (ASC506230-Ae) Coast Guard Drawing 750-WMSL-506-026, Rev C, Ovrflw / Airescapes / Sounding Tubes Unit 2330 (ASC506233-Ae) Coast Guard Drawing 750-WMSL-506-039, Rev D, Overflows / Air Escapes / Sounding Tubes Unit 2310 (ASC506231-Ae) Coast Guard Drawing 750-WMSL-506-040, Rev B, Overflw / Airescapes / Sounding Tubes Unit 2320 (ASC506232-Ae) Coast Guard Drawing 750-WMSL-506-512, Rev -, Ferrous Sounding Tube Replacement A & D COAST GUARD PUBLICATIONS Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2018, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2018, Install Interior Deck Covering Systems OTHER REFERENCES Manufacturers Standardization Society of the Valve and Fittings Industry ANSI/MSS SP-58, 2018, Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation 3.� REQUIREMENTS 3.1 General. 3.1.1 CIR.� The Contractor shall submit a CIR for the inspections listed in the following paragraph(s): None. 3.1.2 Tech Rep. The Contractor shall provide the services of an OEM authorized/ licensed Tech Rep for the OHMART/VEGA Tank Level Indicator Vegapuls 66 to accomplish the following on site: �������������� Provide manufacturer's proprietary system/ equipment information, software, and tools. �������������� Assist with and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system. 3.1.2.1 Ensure the Tech Rep is an OEM Certified Representative for the system/equipment stated above and demonstrated on their r�sum�. 3.1.3 Protective measures.� The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work.� Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness. 3.1.4 Interferences.� The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following: �������������� Insulation �������������� Electrical wiring �������������� Piping systems �������������� Deck Covering 3.1.5 Electrical requirements.� The Contractor shall accomplish all electrical work in accordance with SFLC Std Spec 3042. 3.2 Functional test of TLIs � initial.� Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an operational test of each tank TLIs to demonstrate that each radar head/sensor is functional (i.e., Digital readout is displayed).� Ensure that there is interface/communication between the TLI sensor and the Machinery Control and Monitoring System (i.e. Digital readout at the TLI is identical to that displayed).� Submit a CFR. NOTE Functional test of the TLI radar heads should be done before the tanks are emptied. 3.3 Tank sounding tube replacement.� The Contractor shall replace the entire length of the sounding tubes below the TLI assembly coupling in accordance with Coast Guard Drawing 750-WMSL-506-512.� Use the referenced Coast Guard Drawings to identify the steel sounding tube and associated fittings for removal.� Use the existing piping configuration as templates for the replacement piping. 3.3.1 Removal.� For each tank sounding tube, the Contractor shall disconnect the radar sensor electrically and mechanically, tag each sensor assembly with corresponding tank number or location compartment number, and protect the sensors from damage while in storage as these will be reinstalled on the new sounding tubes.� Once the sensor assembly has been disconnected at the coupling, remove all remaining sounding tube material in affected tanks.� Discard removed components in accordance with all Federal, State, and local rules and regulations. 3.3.2 Installation.� The Contractor shall prepare and install new sounding tubes.� New and reused material shall be in accordance with Coast Guard Drawing 750-WMSL-506-512.� Use the old steel piping as templates.� Ensure the internal and external surfaces of the new pipes and fittings are clean and free of foreign debris before installing. Perform welding and brazing in accordance with SFLC Std Spec 0740. 3.3.3 NDE.� The Contractor shall perform a visual inspection (VT) and a dye penetrant (PT) inspection of all piping and deck penetration welds in accordance with SFLC Std Spec 0740. Submit a CFR. 3.3.4 Nuts on flanged joints in all tanks shall be self-locking with at least one thread length extending beyond the insert when the nut is drawn up tight. The self-locking nut shall be rated for the temperature of the service. 3.3.5 Where disconnected, reinstall pipe supports in accordance with MSS SP-58. 3.4 Boundary test, compartment air. In the presence of the Coast Guard Inspector, the Contractor shall air test the affected tanks listed in Table 1 in accordance with SFLC Std Spec 0740, Appendix C. Submit a CFR. 3.5 Calibration and operational test � post repair.� After completion of work, the Contractor shall re-install and calibrate the TLI sensors using the cutter�s sounding device. In the presence of the CG Inspector and the Tech Rep, take the liquid level readings using the radar TLI and manually using the sounding (gaging) tape at 0%, 25%, 50%, 75%, and 95% of tank capacities. The level and/or volume indication from the TLI shall be within 3% accuracy from the manual sounding indication at all locations. Submit a CFR. 3.6 New sounding tube surface preservation.� The Contractor shall prepare and coat the external surfaces of the new sounding tube inside and outside of the tanks using the system specified for �Piping, Interior (Piping, Insulated and Uninsulated, Under 200�F)� Appendix B (Cutter and Boat Interior Painting Systems) in SFLC Std Spec 6310. 3.7 Restoration and touch-up preservation.� The Contractor shall prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.) 3.7.1 Any section of the polymeric deck covering that has to be removed shall be replaced using the same material to match the adjacent color and flakes.� Prepare affected deck surfaces and install polymeric deck covering system in accordance with SFLC Std Spec 6341.� 4.� NOTES This section is not applicable to this work item. INTERESTED VENDORS PLEASE SEND OFFICIAL QUOTE, WITH A SAM.GOV REGISTERED DUNS NUMBER, AND EMAIL TO ANTHONY.J.ANDALUZ@USCG.MIL COST BREAKDOWN OF QUOTE INCLUDING BUT NOT LIMITED TO LABOR COST PER HOUR AND MATERIALS IS REQUIRED.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/b15206a90cf8491786bf06f88d7e34b8/view)
 
Place of Performance
Address: North Charleston, SC 29405, USA
Zip Code: 29405
Country: USA
 
Record
SN05906988-F 20210205/210203230108 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.