Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 13, 2021 SAM #7016
SOLICITATION NOTICE

16 -- 16--ADAPTER ASSEMBLY,SW

Notice Date
2/11/2021 3:09:22 AM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
NAVSUP WEAPON SYSTEMS SUPPORT PHILADELPHIA PA 19111-5098 USA
 
ZIP Code
19111-5098
 
Solicitation Number
N0038321QH197
 
Response Due
3/15/2021 12:00:00 AM
 
Archive Date
03/30/2021
 
Point of Contact
Telephone: 2156974331
 
E-Mail Address
KYLIE.WALKER@NAVY.MIL
(KYLIE.WALKER@NAVY.MIL)
 
Awardee
null
 
Description
CONTACT INFORMATION|4|N722.23|B4T|215-697-4331|kylie.walker@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| FMS DELIVERY AND SHIPPING INSTRUCTIONS|3|||52211.70| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Invoice and Receiving Report Combo ||TBD|N00383|TBD|TBD|See Schedule |TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|336413|1250|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||| EVALUATION OF FIRST ARTICLE TESTING|3|||| Spares Requirement 100 Percent Small Business Set Aside (SBSA) The evaluation factors are technical acceptability, past performance, and cost/price. The evaluation of proposals will consider the offerors non-price factors as significantly more important than the offerors cost/price factor.Thecontract negotiator will consider performance under current contract(s) to meet the contractual delivery date and/or on time delivery of other past performance references. First Article Testing (FAT)/Production Lot Testing(PLT) required except for the OEM/Prime. If recently passed FAT/PLT please submit a wavier and approval letter(s). Past Performance Reference Information Sheet shall be used for the pastperformance reference(s)/submission of Past Performance information. PCO canprovide a copy of the sheet. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be ""issued"" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to ""issue"" contractual documents asdetailed herein. Early and incremental deliveries accepted. 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 . The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility. These sheets shall not be revised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO. 1.3 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;BOEING ; drawing number ( ;76301; ) ;74A410710; , Revision ;LATEST; and all details and specifications referenced therein. 1.4 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.5 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE SEE HARD COPY OF QAP AND CDRL FOR THIS ITEM DATED JULY 2020 SIGNED BY FRCSW ENGINEERING. CONTACT F18 EQUIPMENT SPECIALIST OR N231 SOURCE DEVELOPMENT FOR HARD COPY QAP AND CDRL. FIRST ARTICLE AND PRODUCTION LOT TEST TO BE PERFORMED AT THE CONTRACTORS FACILITY PARTICIPANTS INCLUDE: FRCSW NAVSUP WSS N231.30 DCMA 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/0ae79b92efcb4cfa8b79629a342e13de/view)
 
Record
SN05914775-F 20210213/210211230110 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.