Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 24, 2021 SAM #7027
SOLICITATION NOTICE

39 -- Big Cliff 40 Ton Intake Gantry Crane

Notice Date
2/22/2021 8:24:31 AM
 
Notice Type
Presolicitation
 
NAICS
333923 — Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
 
Contracting Office
US ARMY ENGINEER DISTRICT PORTLAND PORTLAND OR 97204-3495 USA
 
ZIP Code
97204-3495
 
Solicitation Number
W9127N-20-R-0004
 
Response Due
3/15/2021 2:00:00 PM
 
Archive Date
03/30/2021
 
Point of Contact
Melanie.A.Barrett, Contract Specialist, Phone: 5038084617, Mitchell J. Johnson, Contracting Officer, Phone: 503-808-4606
 
E-Mail Address
Melanie.A.Barrett@usace.army.mil, mitchell.j.johnson@usace.army.mil
(Melanie.A.Barrett@usace.army.mil, mitchell.j.johnson@usace.army.mil)
 
Description
PRE-SOLICITATION FOR THE BIG CLIFF 40 TON INTAKE GANTRY CRANE � SOLICITATION W9127N20R0004 The U.S. Army Corps of Engineers, Portland District has a new requirement for a New 40 Ton Intake Gantry Crane for Big Cliff Dam, modification of the electrical power supply, and incidental related work. �The Government intends to procure this requirement on a competitive basis in accordance with the provisions as set forth in FAR Part 15, Contracting by Negotiation. A formal solicitation will follow this announcement on or around 15 March 2021.� This work consists of replacing the existing Big Cliff Intake Gantry Crane to increase reliability, functionality, safety, and bring all elements up to current codes and standards, provide for increased accuracy of operation, and reduce risk of malfunctions and failures. Work Requirement: The work consists of replacing the existing 40 Ton Intake Gantry crane with a New 40 Ton Intake Gantry Crane at the Big Cliff Dam located near Gates, Oregon.� The contractor must design, manufacture, install, test, and commissioning of the new Intake Gantry Crane. This crane will include one (1) main hoist trolley, and one (1) maintenance jib hoist.� The Intake Gantry Crane provides for placement of the spillway stoplogs, the penstock stoplogs, and for general servicing of the deck of the spillway. The work includes the removal of the existing Intake Crane and the replacement of the existing cable reel power supply to a conductor rail and collector system, conversion from a 3-wire to 4-wire power feed, and installation of emergency stop buttons.� This solicitation will use a FAR Part 15.101-1 Best Value Tradeoff Process. This is a hybrid supply with construction installation contract. Acquisition will provide for Full and Open Competition. The Small Business Deputy for Portland District, Carol McIntyre, is available to answer any questions you might have; (503) 808-4602 or Carol.A.McIntyre@usace.army.mil. � Primary Point of Contact:��������������������������������������� Contracting Office Address: Melanie A. Barrett������������������������������������������������������ U.S. Army Corps of Engineers Contract Specialist����������������������������������������� ����������� USACE District, Portland Melanie.A.Barrett@usace.army.mil����������������������������PO Box 2946 Phone:� (503) 808-4617��������������������������������������������� Portland, OR 97208-2946 U.S. � Place of Contract Performance: Gates, OR 97346 Big Cliff Dam is at river mile�58.1 on the North Santiam River, about 45 miles southeast of Salem, Ore.�It is a concrete dam with gated spillways and was completed along with Detroit Dam in 1953 at a cost of $62.7 million. Big Cliff Dam has since helped prevent more than $615 million in potential damage from floods by controlling runoff from about 438 square miles of drainage area. Because the North Santiam canyon is rocky, narrow, and steep where Big Cliff Dam was constructed, it�is a concrete dam, rather than an earth and rockfill embankment structure, like�other Corps dams in the Willamette Valley Project. �
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/5fca79f8bd0a475598c527acc99f1758/view)
 
Place of Performance
Address: Big Cliff Dam is at river mile 58.1 on the North Santiam River, about 45 miles southeast of Salem, OR., Gates, OR 97346, USA
Zip Code: 97346
Country: USA
 
Record
SN05923041-F 20210224/210222230109 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.