Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 25, 2021 SAM #7028
SOLICITATION NOTICE

Y -- Y--BLM-CO - Sutey Ranch Bike Trail

Notice Date
2/23/2021 3:03:06 PM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
NORTHWEST DISTRICT OFFICE GRAND JUNCTION CO 81506 USA
 
ZIP Code
81506
 
Solicitation Number
140L4221Q0010
 
Response Due
4/30/2021 3:00:00 PM
 
Archive Date
12/31/2021
 
Point of Contact
Hall, Robert, Phone: (970) 876-9038, Fax: (303) 239-3933
 
E-Mail Address
rhall@blm.gov
(rhall@blm.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
BLM-CO - Sutey Ranch (Carbondale, CO) Bike Trail This is a pre-solicitation notice for construction of a 1.5 mile bike trail on the historic Sutey Ranch near Carbondale, CO in accordance with the attached plans and drawings. Quotes or proposals are not being accepted at this time. A full solicitation will be posted on or about middle of March with a closing date of 30 April. A pre-bid hosted site visit is scheduled for 19 April at 10:00 with a weather back-up on 22 April. The Government estimates the rough order of magnitude to be between $25000 - $100,000. Abbreviated Statement of Work: Construct Sutey Ranch Access Trail on the BLM�s Sutey Ranch Property and the BLM�s Red Hill Special Recreation Management Area, as approved by the BLM�s Colorado River Valley Field Office. The trail is a bi-directional contour flow trail (optimized for bike use, but also open to foot traffic) that traverses mellow grades with sandy and occasionally rocky terrain in a forest of pinion and juniper trees. Limited ground cover between trees limits the need for corridor vegetation to be cut prior to trail�s construction the trail to be constructed includes: a. Volunteer Built Portion: 1.57 miles (8,289 linear feet). The eastern portion of the trail will be constructed by volunteers using hand tools. Work will be coordinated by BLM, Red Hill Council, Roaring Fork Mountain Bike Association, and Roaring Fork Outdoor Volunteers. This portion will not require trail contractor services. b. Professional Trail Contractor Built Portion, utilizing a 36� wide mini-excavator: 0.5 miles (2,640 linear feet). The middle portion of the trail encounters terrain with moderately steeper side slopes than the remainder of the project. Utilizing a 36� wide, or similar, mini-excavator will allow for efficient and sustainable trail construction techniques, while also providing a slightly wider trail bench to accommodate bi-directional traffic. The desired character of finished trail construction, while differing from traditional hand cut trail techniques, should match the hand-built portions of trail as much as possible through use of hand-finishing techniques. c. Professional Trail Contractor Built Portion, utilizing hand tools only: 0.92 miles (4,857 linear feet). The western portion of the trail encounters terrain with mostly gentle side slopes but includes areas with loose rock and in some cases with grounded bedrock. To meet the character of the eastern volunteer hand-built portion, as well as the character of the existing Red Hill SRMA trails further to the with west, trail contractor will utilize hand tools and manual construction techniques only for this portion of the the trail construction project. Sustainable natural surface trail systems are designed to be low impact and low maintenance. Since erosion is the main cause for trail maintenance work, trail design and construction techniques have been developed specifically for the prevention of erosion. The trail surface will be compacted soil with occasionally embedded rock, and the trail surface width varies from 1.5� to 4� but is typically 2� to 3�. The maximum width of disturbance to construct the trails, including backslope, will be 10�-0�. Basic Contracting Requirements: 1. Active Registration - www.sam.gov 2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay 3. FAR Part 36 - Construction Terms and Clauses 4. Davis Bacon Wages for Garfield County, CO 5. Bid, Performance and Payment Bonding 6. Total Small Business Set-Aside for NAICS 7. Basis of Award - Low Price Technically Acceptable with a thorough review of your technical response. If you are interested and capable doing this work, follow the solicitation announcement on beta.sam.gov and/or email the POC with your interest, contact information and capability statement. POC: Contracting Officer Robert Hall - rhall@blm.gov - 970-876-9038 -
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/bfa1fa4bba19499d99c552c948dd4d69/view)
 
Place of Performance
Address: Carbondale, CO 81623, USA
Zip Code: 81623
Country: USA
 
Record
SN05924192-F 20210225/210223230113 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.