Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 27, 2021 SAM #7030
SOURCES SOUGHT

99 -- FY21 USACE Galveston District, Sabine-Neches Waterway (SNWW) Maintenance Dredging, Jefferson County, Texas Pipeline Dredging, Deep Draft

Notice Date
2/25/2021 12:28:44 PM
 
Notice Type
Sources Sought
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT GALVESTON GALVESTON TX 77550-1229 USA
 
ZIP Code
77550-1229
 
Solicitation Number
W912HY21S0013
 
Response Due
3/8/2021 12:00:00 PM
 
Archive Date
03/23/2021
 
Point of Contact
Jo Ann McCue, Traci Robicheaux, Phone: 4097666306
 
E-Mail Address
jo.a.mccue@usace.army.mil, traci.d.robicheaux@usace.army.mil
(jo.a.mccue@usace.army.mil, traci.d.robicheaux@usace.army.mil)
 
Description
Sources Sought No. W912HY21S0013 Project Title:� FY21 USACE Galveston District, Sabine-Neches Waterway (SNWW) Maintenance Dredging, Jefferson County, Texas Pipeline Dredging, Deep Draft The U.S. Army Corps of Engineers, Galveston District has a requirement for the above subject.� THIS IS A NOTICE FOR SOURCES SOUGHT ONLY.� THIS IS NOT A REQUEST FOR PROPOSAL OR INVITATION FOR BID.� THERE IS NO BID PACKAGE, SOLICITATION, SPECIFICATION OR DRAWINGS AVAILABLE WITH THIS ANNOUNCEMENT.� IT DOES NOT CONSTITUTE A PROCUREMENT COMMITMENT BY THE US ARMY CORPS OF ENGINEERS, IMPLIED OR OTHERWISE.� NO CONTRACT WILL BE AWARDED FROM THIS SOURCES SOUGHT ANNOUNCEMENT.� RESPONSE IS STRICTLY VOLUNTARY; NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOURCES SOUGHT ANNOUNCEMENT OR ANY FOLLOW-UP INFORMATION REQUESTS.� THE GOVERNMENT SHALL NOT BE LIABLE FOR OR SUFFER ANY CONSEQUENTIAL DAMAGES FOR ANY IMPROPER IDENTIFIED INFORMATION. The purpose of this sources sought announcement is to gain knowledge of interested, capable, and all qualified small businesses including but not limited to Small Business, 8(a) Small Business Development Program, Service Disabled Veteran Owned Small Business, and Hubzone firms.�� The North American Industry Classification System (NAICS) Code 237990; Size Standard $30 million. To make appropriate acquisitions for the above project, the Government, will use responses to this sources sought announcement and possible future projects as determined to be in the best interest of the Government.� The order of magnitude for this effort is estimated between $5,000,000 and $10,000,000.00. Project Information: Scope of work includes dredging areas along the Sabine-Neches Waterway which is a deep draft channel.� Areas include the Neches River, Maritime Administration (MARAD) Anchorage Basin and Fleet Access Slip, Placement Area (PA) Canal Junction Area, Taylors Bayou, and United States Coast Guard (USCG) Boat Basin along the Sabine Pass area. Schedule No. 1 work consists of dredging areas along the Neches River, MARAD Anchorage Basin, and MARAD Fleet Access Slip. Schedule No.1 dredging includes approximately 3,000,000 cubic yards utilizing Placement Areas 12,13,14,16,17, 23, and 24.� Pipeline Length averages between 1mile to 3.5miles Option work includes dredging PA Canal Junction Area, Taylors Bayou area, and USCG Boat Basin.� Estimate dredge volume is approximately 2,000,000 cubic yards utilizing Placement Areas 5 and 9.� Pipeline Length averages between 1mile to 2.5miles USCG Boat Basin � Sabine Pass area. Estimated dredge volume of 46,000CY.� Will require dredging shallower depths and under a Boat House structure. No Specific Order of Work is anticipated.� Estimated production rate: 12,000 Cubic Yards/day The estimated award date for this project is August 2021. Completion time for Schedule No. 1 is 120 calendar days.� Completion time for Option work if awarded is 90 calendar days.� If the contractor fails to complete the work within the time specified, the contractor shall pay liquidated damages to the Government for each calendar day of delay until the work is completed or accepted.� Liquidated Damage amount will be specific in the solicitation. The contractor will be required to provide Performance and Payment Bonds within five (5) calendar days after award.� Contractor will be required to furnish Pre-Award documents within five (5) calendar days after Bid Opening.� The contractor shall begin Work within (10) calendar days after acknowledgement of the Notice to Proceed. If you can meet all the requirements for this project, please respond to this source sought announcement by e-mail, to the attention of Jo Ann McCue, Jo.A.McCue@usace.army.mil.� Responses must be received no later than 02:00 P.M. Central Standard Time, on March 8, 2021.� The following information is requested: Data Universal Numbering System (DUNS) & Commercial and Government Entity (CAGE) (This information can be obtained from your System for Award Management (SAM) Registration at www.sam.gov ).� ���� 2. Name of firm w/address, phone, fax, e-mail address, and point of contact. ���� 3. State if your company is a Small Business, SBA Certified 8(a) firm, HubZone Small Business, or Service Disabled Veteran-�������� Owned Small Business. ��� 4. State whether your firm can provide a Bid Bond (20% of total bid amount), Performance and Payment Bond (100% of the contract amount). � 5.Please indicate whether your firm will submit a bid for this project, if this project is set-aside for Small Business, 8(a), Hubzone Small Business, or Service Disabled Veteran-Owned Small Business. � 6. Qualifications:� Responses to this sources sought announcement shall indicate specialized experience and technical competence in: ������� (a) Contractor must be experienced in completing work outlined under the paragraph above for �Project Information�. � ��������(b) Provide documentation for your firm on past similar efforts as a prime contractor. ������� (c) Provide a list of your present commitments and completion dates for these commitments.� Identify dredge on present commitments and identify dredge and size of dredge to be used on this requirement.� The evaluation will consider overall experience. ��� 7. Submission Requirements:� Firms submitting responses shall provide information on the most recent up to five projects that prove you can meet the qualification criteria listed above, with contract number, project location, description of work requirements, dredge and size of dredge utilized, average production on the job, contact and phone number for each effort.� Firms should also indicate all applicable personnel and sub-contractors proposed to work on the contract.� Proof of Small Business Administration (SBA) registration 8(a) and Hubzone Small Business shall be provided with this response. Firms responding to this sources sought announcement, who fail to provide ALL of the required information requested, will not be used to help the Government make the acquisition decision, which is the intent of this sources sought announcement.�
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/5d531c886db94fd4b226c3226a9916f1/view)
 
Record
SN05927597-F 20210227/210225230111 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.